Machine - Experiments January 12, 2005 Machine status.

Slides:



Advertisements
Similar presentations
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
RHIC Heavy Ion Run-11 Status Meeting Updates. Heavy Ion Run Final Update 6/24-27 ● Physics running, 41 stores – Tandem intensity issues – Access controls.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Machine-Experiments January 19, 2005 Machine status.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
Heavy Ions in RHIC – How to get to higher Luminosities? Angelika Drees APS DNP Fall meeting Oct. 30, 2003 I.Accelerator Basics II.Luminosity Limitations.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Run 10 Start-up Status
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
ApEx needs for CeC PoP Experiment December 11, 2015.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC Morning Meeting - G. Arduini
Friday morning 10:30 Optics measurements and corrections.
Summary Thursday h21: Stable beams fill #1303.
Run-5 Cu-Cu Integrated Luminosity
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Another Immortal Fill….
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Presentation transcript:

Machine - Experiments January 12, 2005 Machine status

Status overview Tue Dec 28beginning “2 weeks”start-up Wed Dec 29blue and yellow available Tue Jan 4beginning”2 weeks” ramp-up Tue Jan 11beginning of phyisics today if all is well…. 4 weeks set-up/ramp-up  2 weeks (used set-uptime with blue ahead of time)

Ramp development Monday: R-2-R synchro Tuesday night: first scheduled collisions overnight (initial set-up : 28x ~3e9) intensity development  Losses around transition  Losses at beta* squeeze (  permit pulls) Key issue: beam-beam on the ramp:  Increase synchro loop gain (RF group)  Tweak RF dipole yellow t200  store (Vadim) (Friday afternoon)

R2R synchro improvement Increase synchro loop gain RF dipole cogging Tune shift during cogging

Week 0 – beam intensity start overnight collisions beam-beam on ramp solved Intensity development

Sunday owl store (28x 4.7/4.1) Cu store Au store Production 45x1e9 Au/bunch

Sunday – intensity development  Bunch intensity (Yun shift) #bB int Y int B trans Y transCollision rates %92%28K %95%27K %90%? %93%22K %92%24K

Monday owl stores 48x2.8e9 28x4.5e9

Today’s owl stores 28x4.3 28x4.4

Collision rates 28X4.5expect ~46Kmeasured ~29K 48x3.0expect ~29Kmeasured ~21K Origin discrepancy:  Beta*  Cu-cu cross section (assumed 2)  will measure  ZDC do not see all collisions  Transverse emittance measured AtR yesterday ~19, 11 (5e9) measured AtR weeks ago~12, 9 (4.5e9) measured Vernier scan~38  emittance measurement, control needed to improve luminosity

Luminosity development Expected limitations  Pressure rises (Phobos, transition, re-bucketing), e-clouds First indication Phobos PR with 48x3.0 ramp  Beam-beam – ramp (mostly fixed), at store (working point)  Background  not yet  Transverse Emittance Luminosity development  Increase bunch intensity 4.5  6-7e9 Transition optimization for bunch intensity>4.5e9 Emittance measurement, control (injectors, emittance growth RHIC)  Increase number of bunches (if bunch intensity limitations)  IR correction, yellow  Beta* measurements  Common cavities  Stochastic cooling

Operations issues  Fixed Store lengths use BERT to broadcast  Ramp “take-off” check list  Ramp check/maintenance every morning (day shift leader)  Update/use of configuration page Beam parameters (working points, inj, store…) Nominal ramp bunch intensity, #bunches