Kenan Ogelman TAC Chair Tab 8.2: 2013 Competitive Constraints Board of Directors Meeting ERCOT Public September 18, 2012.

Slides:



Advertisements
Similar presentations
February 2012 CMWG Constraints Competitiveness Tests (CCT)
Advertisements

Protocol Revision Subcommittee Tom Burke July 2, 2013.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Governance and Legal Issues Margaret Uhlig Pemberton General Counsel and Corporate Secretary Media Day Austin, Texas September 13, 2001.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
May 13, 2008 COPS Commercial Operations Subcommittee (COPS) Procedures Review ERCOT Market Rules.
Nothing below this point Subtitle Nothing below this point Congestion.
1 New Mexico State University Santa Fe Conference 2005 Steve Rodgers Office of Markets, Tariffs & Rates—South Federal Energy Regulatory Commission March.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
TEXAS NODAL Board Review and Approval August 19, 2003.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
West to North CSC Location Scenario 3b WMS August 20, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
April 28, 2008 Constraint Competitiveness Tests, an Overview Congestion Management Working Group.
March 19, 2008 WMS WMS Procedures Review Nieves López ERCOT Market Rules.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
March 7, 2013 Technical Advisory Committee (TAC) meeting update to RMS Kathy Scott March 20, 2013TAC Update to RMS 1.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
Report to TAC September In Brief Working Group Reports Working Group Reports CMWG – CSC’s 2010 CMWG – CSC’s 2010 MWG – SMOGRR007 MWG – SMOGRR007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
Congestion Management Working Group WMS update 11/7/2012.
Resource Cost Working Group October 7, 2015 WMS Update.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 9, 2009.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
1 TAC Report to the ERCOT Board February 21, 2006.
ERCOT MARKET EDUCATION Retail 101. Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 16, 2007.
TEXAS NODAL Market Design Structure and Process August 19, 2003.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
1 WMS Report TO TAC April 2007 (which is in March)
Technical Advisory Committee Presentation to the ERCOT Board of Directors September 16, 2008.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Constraints Competitiveness Tests (CCT) Results Analysis of 2010 SSWG Peak Summer Case Presented to CMWG 1/27/2010.
August 2012 Wholesale Market Operations Constraints Competitiveness Tests (CCT) – Annual CCT 2013 Study Result with New Approach Market Support and Analysis.
1 TAC Report to the ERCOT Board November 14, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
NPRR 520 Resmi Surendran ERCOT. Current CCT Process Annual CCT (ACCT) is run every year to feed the results to Monthly CCT (MCCT) MCCT is run every month.
Kenan Ögelman & Randa Stephenson TAC Leadership Retreat TAC Meeting September 5, 2013.
1 Summary of TAC Procedures for COPS & PRS May 17, 2005.
1 Summary of TAC Procedures May 5, Revision of TAC Procedures Project began in October 2004 to incorporate the Commercial Operations Subcommittee.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
Texas Nodal Market Go-Live Procedure
Protocol Revision Subcommittee
TAC Report to the ERCOT Board
Presentation transcript:

Kenan Ogelman TAC Chair Tab 8.2: 2013 Competitive Constraints Board of Directors Meeting ERCOT Public September 18, 2012

TAC Action on the Constraint Competitiveness Test (CCT) The CCT is a test intended to determine the existence of local market power. – A constraint is either deemed competitive and no local market power mitigation is needed or; – A constraint is deemed non-competitive and local market power mitigation measures kick in. We run the test annually, monthly, and daily. This appeal involves only the annual test. The design has been in the Protocols since the nodal market has been operational; however, the test has never been used to screen for local market power. The CCT relies on a feature called the Element Competitiveness Index (ECI). Tab 8.22 ERCOT Public

The ECI is loosely derived from the Herfindahl- Hirschman Index, a test the Justice Department uses as part of approving mergers and acquisitions. – As a reference, a score of 10,000 is considered to be a monopoly. – If you had 100 firms with equal shares the HHI would be 100. The CCT adds features to the test to reflect the particulars of an electric market such as: – A pivotal player test; – Analysis on the import and export sides of a constraint. Tab 8.23 ERCOT Public

What are the options? Option 1 logic: –A constraint is “Competitive” if Constraint can not be overloaded under worst case scenario OR Combination of –There are resources with absolute Shift Factor >=2 % –AND positive-SF ECI <= 2500 –AND negative-SF ECI <= 2000 –AND no pivotal player exists –Otherwise, it is “Non-Competitive Tab 8.24 ERCOT Public

Option 2 logic: –A constraint is “Competitive” if Combination of –There are resources with absolute Shift Factor >=2 % –AND positive-SF ECI <= 2500 –AND negative-SF ECI <= 2000 –AND no pivotal player exists –Otherwise, it is “Non-Competitive” Option 3 logic: –A constraint is “Competitive” if Constraint can be overloaded under worst case scenario AND Combination of –There are resources with absolute Shift Factor >=2 % –AND positive-SF ECI <= 2500 –AND negative-SF ECI <= 2000 –AND no pivotal player exists –Otherwise, it is “Non-Competitive” Tab 8.25 ERCOT Public

TAC Votes First a motion was made to approve Option 1 – That motion failed with 7 in favor, 16 against and 6 abstentions. Seven affirmative votes from the Independent Generator (3) and the Independent Power Marketer (IPM) (4) Market Segments. Six abstentions from the Independent Retail Electric Provider (IREP) (4), Investor Owned Utility (IOU) and Generator Market Segments. Sixteen opposing votes from the Cooperative (4), Municipal (3), IOU (3), and Consumer (6) Market Segments. Tab 8.26 ERCOT Public

A second motion was made to approve a modified Option 3 as recommended by the WMS. This motion passed with 19 in favor, 2 opposed and 8 abstentions. – Two opposing votes from the Generator Market Segment. – Eight abstentions from the IOU, Generator (2), IREP (4) an.d IPM Market Segments Tab 8.27 ERCOT Public

Later, a third vote was taken to reconsider TAC’s previous action. This motion was made in light of new information that some TAC members wanted considered related to the inclusion of the West to North stability limit constraint being included as a competitive constraint. The motion failed with 15 in favor, 7 against and 3 abstentions. – Seven opposing votes from the IOU and Consumer (7) Market Segments. – Three abstentions from the IOU Market Segment. Tab 8.28 ERCOT Public