© 2008 Prentice Hall, Inc.E – 1 Operations Management Module E – Learning Curves PowerPoint presentation to accompany Heizer/Render Principles of Operations.

Slides:



Advertisements
Similar presentations
Supplement 7 Learning Curves
Advertisements

© 2008 Prentice Hall, Inc.E – 1 Operations Management Module E – Learning Curves PowerPoint presentation to accompany Heizer/Render Principles of Operations.
Operations Management
Aggregate Planning in a Supply Chain
Strategic Capacity Planning & Aggregate Planning
Strategic Capacity Planning Defined
INDUSTRIAL & SYSTEMS ENGINEERING
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Learning Curve Analysis
The Master Budget and Flexible Budgeting
Stephen R. Lawrence Associate Professor of Operations Leeds School of Business University of Colorado Boulder, CO
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Learning Curve Analysis. Learning Objective After this class the students should be able to: Calculate the hours required to produce determinate product.
International Business Fourth Edition.
© 2006 Prentice Hall, Inc.D – 1 Operations Management Module D – Waiting-Line Models © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
© 2006 Prentice Hall, Inc.7 – 1 Operations Management Chapter 5 – Process Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
© 2012 Prentice Hall Inc Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall. 1-1 Copyright ©2013 Pearson Education, Inc. publishing.
1 Chapter 7 Technology and Production 1. 2 Production Technologies Firms produce products or services, outputs they can sell profitably A firm’s production.
©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 8, Slide 1 Capacity Decisions Defining.
Productivity and Learning Curves
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
1 Slides used in class may be different from slides in student pack Chapter 11 Strategic Capacity Planning  Strategic Capacity Planning Defined  Capacity.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna M3-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Module 3 Decision.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Learning Curves Chapter 4A. Objectives 1. Understand what learning curves are and how they can be estimated. 2. Apply learning curves to estimate the.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Learning Curves Dr. Everette S. Gardner, Jr.. Learning Curves2 Learning curve concepts Predicts reduction in manufacturing costs or direct labor hours.
Operations Management
E - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall E E Learning Curves PowerPoint presentation to accompany Heizer and Render Operations Management,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
CHAPTER 7 The Production Process: The Behavior of Profit-Maximizing Firms © 2009 Pearson Education, Inc. Publishing as Prentice Hall Principles of Economics.
1 of 32 © 2014 Pearson Education, Inc. Publishing as Prentice Hall CHAPTER OUTLINE 7 The Production Process: The Behavior of Profit-Maximizing Firms The.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
ME - 1© 2014 Pearson Education, Inc. Learning Curves PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles.
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Supplement 7 Learning Curves.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Business Strategy: Differentiation, Cost Leadership, and Integration Joe Mahoney.
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Learning Curve Analysis Supplement I Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall I - 01.
Learning Curves McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Learning Curves Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
CHAPTER 7 The Production Process: The Behavior of Profit-Maximizing Firms © 2009 Pearson Education, Inc. Publishing as Prentice Hall Principles of Economics.
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
PowerPoint Lectures for Principles of Microeconomics, 9e
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Copyright ©2009 Pearson Education, Inc. Publishing as Prentice Hall 22-1 Operations Management 10.
Review Test 2 BSAD 30 Dave Novak Source: Anderson et al., 2015 Quantitative Methods for Business 13 th edition – some slides are directly from J. Loucks.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management Aggregate Scheduling Chapter 13
Operations Management
The Theory and Estimation of Cost
Learning Curves Guanyi Lu November 27, 2018.
7S Learning Curves.
Operations Management
Trading and Factory Towns
Learning and The Learning Curve
What is Learning Curve Most organizations learn & improve over time. As firms and employees perform a task over and over, they learn how to perform more.
Learning Curve Analysis
E Learning Curves PowerPoint presentation to accompany
Presentation transcript:

© 2008 Prentice Hall, Inc.E – 1 Operations Management Module E – Learning Curves PowerPoint presentation to accompany Heizer/Render Principles of Operations Management, 7e Operations Management, 9e

© 2008 Prentice Hall, Inc.E – 2 Outline  Learning Curves in Services and Manufacturing  Applying the Learning Curve  Arithmetic Approach  Logarithmic Approach  Learning-Curve Coefficient Approach  Strategic Implications of Learning Curves  Limitations of Learning Curves

© 2008 Prentice Hall, Inc.E – 3 Learning Objectives When you complete this module you should be able to: 1.Define a learning curve 2.Use the arithmetic concept to estimate times 3.Compute learning curve effects with the logarithmic and learning-curve coefficient approaches 4.Describe the strategic implications of learning curves

© 2008 Prentice Hall, Inc.E – 4 Learning Curves  Based on the premise that people and organizations become better at their tasks as the tasks are repeated  Time to produce a unit decreases as more units are produced  Learning curves typically follow a negative exponential distribution  The rate of improvement decreases over time

© 2008 Prentice Hall, Inc.E – 5 Learning Curve Effect Figure E.1 Cost/time per repetition Number of repetitions (volume) 0

© 2008 Prentice Hall, Inc.E – 6 Learning Curves T x L n = Time required for the n th unit whereT=unit cost or unit time of the first unit L=learning curve rate n=number of times T is doubled First unit takes 10 labor-hours 70% learning curve is present Fourth unit will require doubling twice — 1 to 2 to 4 Hours required for unit 4 = 10 x (.7) 2 = 4.9 hours

© 2008 Prentice Hall, Inc.E – 7 Learning Curve Examples Table E.1 Example Improving Parameters Cumulative Parameter Learning- Curve Slope (%) (%) Model -T Ford production Price Units produced 86 Aircraft assembly Direct labor-hours per unit Units produced 80 Equipment maintenance at GE Average time to replace a group of parts Number of replacements 76 Steel production Production worker labor-hours per unit produced Units produced 79

© 2008 Prentice Hall, Inc.E – 8 Learning Curve Examples Table E.1 Example Improving Parameters Cumulative Parameter Learning- Curve Slope (%) (%) Integrated circuits Average price per unit Units produced 72 Handheld calculator Average factory selling price Units produced 74 Disk memory drives Average price per bit Number of bits 76 Heart transplants 1-year death rates Transplants completed 79

© 2008 Prentice Hall, Inc.E – 9 Uses of Learning Curves Internal:labor forecasting, scheduling, establishing costs and budgets External:supply chain negotiations Strategic:evaluation of company and industry performance, including costs and pricing

© 2008 Prentice Hall, Inc.E – 10 Arithmetic Approach  Simplest approach  Labor cost declines at a constant rate, the learning rate, as production doubles Nth Unit Produced Hours for Nth Unit = (.8 x 100) = (.8 x 80) = (.8 x 64) = (.8 x 51.2)

© 2008 Prentice Hall, Inc.E – 11 Logarithmic Approach Determine labor for any unit, T N, by T N = T 1 (N b ) whereT N =time for the N th unit T 1 =hours to produce the first unit b=(log of the learning rate)/(log 2) =slope of the learning curve

© 2008 Prentice Hall, Inc.E – 12 Logarithmic Approach Determine labor for any unit, T N, by T N = T 1 (N b ) whereT N =time for the N th unit T 1 =hours to produce the first unit b=(log of the learning rate)/(log 2) =slope of the learning curve Learning Rate (%) b 70– – – – –.152 Table E.2

© 2008 Prentice Hall, Inc.E – 13 Logarithmic Example Learning rate = 80% First unit took 100 hours T N =T 1 (N b ) T 3 =(100 hours)(3 b ) =(100)(3 log.8/log 2 ) =(100)(3 –.322 ) =70.2 labor hours

© 2008 Prentice Hall, Inc.E – 14 Coefficient Approach TN=T1CTN=T1CTN=T1CTN=T1C whereT N =number of labor-hours required to produce the N th unit T 1 =number of labor-hours required to produce the first unit C=learning-curve coefficient found in Table E.3

© 2008 Prentice Hall, Inc.E – 15 Learning-Curve Coefficients Table E.3 70%85% UnitNumber (N)Unit TimeTotal TimeUnit TimeTotal Time

© 2008 Prentice Hall, Inc.E – 16 Coefficient Example First boat required 125,000 hours Labor cost = $40/hour Learning factor = 85% T N =T 1 C T 4 =(125,000 hours)(.723) =90,375 hours for the 4 th boat 90,375 hours x $40/hour = $3,615,000 T N =T 1 C T 4 =(125,000 hours)(3.345) =418,125 hours for all four boats

© 2008 Prentice Hall, Inc.E – 17 Coefficient Example Third boat required 100,000 hours Learning factor = 85% 100, = 129,366 hours New estimate for the first boat

© 2008 Prentice Hall, Inc.E – 18 Strategic Implications To pursue a strategy of a steeper curve than the rest of the industry, a firm can: 1.Follow an aggressive pricing policy 2.Focus on continuing cost reduction and productivity improvement 3.Build on shared experience 4.Keep capacity ahead of demand

© 2008 Prentice Hall, Inc.E – 19 Industry and Company Learning Curves Figure E.2 Price per unit (log scale) Accumulated volume (log scale) Gross profit margin Loss (a)(a)(a)(a) (c)(c)(c)(c) (b)(b)(b)(b) Company cost Industry price

© 2008 Prentice Hall, Inc.E – 20 Limitations of Learning Curves  Learning curves differ from company to company as well as industry to industry so estimates should be developed for each organization  Learning curves are often based on time estimates which must be accurate and should be reevaluated when appropriate

© 2008 Prentice Hall, Inc.E – 21 Limitations of Learning Curves  Any changes in personnel, design, or procedure can be expected to alter the learning curve  Learning curves do not always apply to indirect labor or material  The culture of the workplace, resource availability, and changes in the process may alter the learning curve