LCG Introduction John Gordon, STFC GDB September 9th 2009.

Slides:



Advertisements
Similar presentations
RIRs, the NRO and ICANN Update - August So far The RIR boards have drafted an agreement to be undertaken between themselves to establish a Number.
Advertisements

LCG-France Project Status Fabio Hernandez Frédérique Chollet Fairouz Malek Réunion Sites LCG-France Annecy, May
Sue Foffano LCG Resource Manager WLCG – Resources & Accounting LHCC Comprehensive Review November, 2007 LCG.
1 EGI Update and Options for Switzerland SwiNG SAC, June 26, 2009 Christoph Witzig For SwiNG EB.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
EGI Status and Outlook Pre-GDB May 12 th, 2009 Jürgen Knobloch, CERN EGI_DS Technical Director 2-Mar-091 J. Knobloch - Pre-GDB 12-May-2009.
WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction.
LCG Introduction John Gordon, SFTC GDB December 2 nd 2009.
Towards the new EGI governance model Arjen van Rijn (Nikhef) Chair Organizational Taskforce (EGI_DS and Local Host)
Greensboro City Advisory Group on Sustainability Plan of Work General Activities Meeting Schedule Typical Meeting Agenda Ongoing Activities.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Overview & Status of the Middleware & EGI Core Proposals Steven Newhouse Interim EGI Director EGEE Technical Director 26/05/2016 Status of EGI & Middleware.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Ian Bird LCG Project Leader OB Summary GDB 10 th June 2009.
LCG Introduction John Gordon, STFC-RAL GDB September 9 th, 2008.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks France Grilles The French NGI R. Rumler,
WLCG Collaboration Workshop 7 – 9 July, Imperial College, London In Collaboration With GridPP Workshop Outline, Registration, Accommodation, Social Events.
Your university or experiment logo here The European Landscape John Gordon GridPP24 RHUL 15 th April 2010.
LCG Introduction John Gordon, STFC-RAL GDB May 2, 2007.
Storage Accounting John Gordon, STFC GDB March 2013.
LCG Introduction John Gordon, STFC GDB September 14 th 2011.
LCG Introduction John Gordon, STFC GDB December14 th 2011.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
Authentication and Authorisation for Research and Collaboration Christos Kanellopoulos
WLCG Planning Issues GDB June Harry Renshall, Jamie Shiers.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
LCG Support for Pilot Jobs John Gordon, STFC GDB December 2 nd 2009.
Update on HEP SSC WLCG MB, 18 th August 2009 Jamie Shiers Grid Support Group IT Department, CERN.
DJ: WLCG CB – 25 January WLCG Overview Board Activities in the first year Full details (reports/overheads/minutes) are at:
LCG Introduction John Gordon, STFC GDB July8th 2009.
Update on HEP SSC WLCG MB, 6 th July 2009 Jamie Shiers Grid Support Group IT Department, CERN.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
Middle Fork Project Relicensing Process Plan April 25, 2006.
Market Operations Standing Committee March 5, 2003.
European Grid Initiative Design Study Current Status Luděk Matyska CESNET EGI_DS Project Director (With thanks to Juergen Knobloch for pictures)
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
Transition Plan Network Operations Model Change Requests 5/26/2010.
A Year in the Life Of a State Data Coordinator December, 2013.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
LCG Introduction John Gordon, STFC-RAL GDB November 7th, 2007.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Astrophysical Cluster Session Claudio Vuerli,
Ian Bird LCG Project Leader Summary of EGI workshop.
LCG Introduction John Gordon, STFC-RAL GDB August 31st, 2007.
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
GLite proto-Collaboration phone conference Mirco Mazzucato INFN Working Meeting 5 September 2009.
Ian Collier STFC Rutherford Appleton Laboratory
Update on Plan for KISTI-GSDC
Timeline agreed at planning meeting held on 30th November 2015
John Gordon, STFC-RAL GDB March 11, 2009
John Gordon, STFC-RAL GDB April 8th 2009
Agenda Welcome Project Status (inc. Activity Reports)
John Gordon, STFC GDB October 12th 2011
John Gordon, STFC-RAL GDB June 6, 2007
John Gordon, STFC GDB April 6th 2011
Cost of Service Analysis & Rate Design
All Wales Safeguarding Procedures Review Project
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
NATA Foundation Building Blocks Process
Planning of MISSOC activities until the October Network Meeting
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
Welcome.
UK MoUs and Tier-1/A experiment shares
Presentation transcript:

LCG Introduction John Gordon, STFC GDB September 9th 2009

LCG Since the Previous Meeting STEP09 Post-Mortem, 9-10 July LHC OPN, Vancouver August 31 Initial EGI Council Meeting, Amsterdam, 9 th July EGI Proposal SSC Formation EMI Collaboration Board EGI-DS Management Board 2

LCG GDB meetings in 2009 Second Wednesday of each month Last month we established that GDB could start at 0900, but agenda did not justify this month 3

LCG Pre-GDB meetings

LCG Forthcoming Events EGEE09, Barcelona, September th 2009 –EGI Council, SSC meeting, EMI CB ATLAS Jamboree, CERN October 13th HEPiX Fall Meeting, NERSC, Berkeley, October SC’09, Portland, Oregon, November th

LCG GDB Issues Pilot Jobs, SCAS, gLExec CREAM SL5 EGI Virtualisation 6

LCG Main Topics Today SL5 for WN : follow-up from previous GDB and decision CREAM LHC OPN Experiment Operations Virtualisation

LCG 8

EGI Timeline 2nd of June - The deadline for MoU comments (updated) 9th of June - The final MoU will be published 12th of June - deadline for comments on "Governance issues" document. 19th of June - Draft EGI.eu Convention and Statuses available 1st of July - deadline for MoU signatures (23 have signed) 9th of July - EGI Council initial meeting in Amsterdam August/September - EGI.eu Convention and Statutes approved 1st October - Financial contributions to EGI Collaboration due (invoiced) Oct deadline for legal creation of EGI.eu by which time legal documents must be agreed by NGI legal authorities. From J. Knobloch

LCG EGI Interim Director and team proposing to Council:- Bidding for Global Tasks (received) Estimates of International tasks (received) Outline proposals for FP7 calls. EGI – Core proposal + Services for Heavy Users EMI – gLite+ARC+Unicore SSC(s) – ROSCOE including HEP 10

LCG Other News LHC Schedule –Further slippage until November –Energy ? Scrutiny Group and Requirements –Agreed with Scrutiny Group and LHCC –Requirements – –Check with experiments –2009 Pledges to be in place by end of September –Freeze environment at end of September for a stable testing period before data. 11