M. WeaverPEP-II MAC Review, 13-15 Dec 04  Operational issues  radiation aborts  radiation-dose and background monitoring  Background characterization.

Slides:



Advertisements
Similar presentations
Dec/02/04 Su DongCaltech Trigger/DAQ/Online workshop1 Level 1 Trigger: Introduction L1 trigger objects and strategy Implementation features L1 composition.
Advertisements

Ion instability at SuperKEKB H. Fukuma (KEK) and L. F. Wang (SLAC) ECLOUD07, 12th Apr. 2007, Daegu, Korea 1. Introduction 2. Ion trapping 3. Fast ion instability.
June 28, 2004 BBBTF Steven H. Robertson McGill University, Institute of Particle Physics 1 Beam Background Simulation with B A B AR with B A B AR June.
Snowmass G. Eigen, University of Bergen G. Eigen University of Bergen Snowmass July 14, 2001.
W. KozaneckiMCC AP meeting, 8 Mar 07  MD goals  Experimental procedure  HER-only x & y scans + high-current extrapolation  [LER only X & y scans +
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
W. KozaneckiPEP-II MAC Review, 9-11 Oct 03 Machine-Detector Interface  Issues  Machine Backgrounds, Present & Future  BaBar involvement in Accelerator.
1 Beam-Beam Collimation Study Stephanie Majewski, Witold Kozanecki June 4, 2004 Acknowledgments: Ted Fieguth, Roger Barlow.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
W. KozaneckiMD planning meeting, 20 Jan 04 Background characterization strategy  MD goals  Background sources  Operational procedures  Open questions.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
W. KozaneckiMDI meeting, 19 Mar 04 Separating the luminosity background from the non-colliding beam-gas contribution  Principle  the problem  the beam-gas.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
M. WeaverPEP-II MAC Review,15-17 Nov’07  Operational issues  radiation aborts  background monitoring  Background extrapolations  model comparisons.
W. KozaneckiMDI meeting, 16 Jan 2004 BaBar-wide Background monitoring  Motivation  institutionalize...  through a weekly report to PEP-II/BBR meeting.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
W. KozaneckiMDI meeting, 9 Mar 07  MD goals  Experimental procedure  HER-only x & y scans + high-current extrapolation  [LER only X & y scans] + high-current.
Machine Detector Interface Summary Junji Haba, KEK.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
W. KozaneckiMCC AP meeting, 29 July 04  Goal: measure the luminosity degradation associated with  parasitic crossings  horizontal crossing angle  Principle.
W. KozaneckiIR summary, BES-III workshop Interaction Region: a terse summary  Accelerator issues  Parameter comparison with PEP-II/KEKB  IR layout 
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
GEANT4-BASED SIMULATION STUDY OF PEP-II BEAM BACKGROUNDS IN THE BABAR DETECTOR AT THE SLAC B-FACTORY W. S. Lockman, SCIPP, University of California, Santa.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Simulation on beam loss from radiative Bhabha process Y. Funakoshi KEK.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
Comparing Luminosity Scans and Profile Monitor Results The size of the overlap of the two beams can be calculated from the individual beam sizes using:
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
M. WeaverB-Factory Operations Review April 24, 2006 BaBar Backgrounds Matt Weaver B-Factory Operations Review April 24, 2006.
William Lockman UC Santa Cruz May 6, 2005MDI meeting G4 simulation: status and validation strategy Goals Contributors Status Needed plots Future tasks.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Beam Background Simulation at Belle/KEKB Motivation SR background Particle background Feedback to the detector design SR alarm Summary O. Tajima (Tohoku.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
Two beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
FCC-ee Interaction Region design
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
presented by W. Kozanecki (CEA-Saclay) for the BaBar - PEPII MDI group
The Interaction Region
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Beam-beam limits: MD proposal
Machine Background Status & issues in BaBar/PEP-II
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
Beam Background and the SVT Protection Collimator
RPC and LST at High Luminosity
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
PEP-II Status and Plans e+e- Factories Workshop
Trickle Background Investigation
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Background issues for the Super-B background simulation team
Background issues for the Super-B background simulation team
DIRC Background Status
Long term projections summary
Background characterization: MD plan
IR/MDI requirements for the EIC
Presentation transcript:

M. WeaverPEP-II MAC Review, Dec 04  Operational issues  radiation aborts  radiation-dose and background monitoring  Background characterization  characterization experiments  long-term projections & vulnerabilities  Simulations  G4 development status  collimation studies  Other background developments Machine-Detector Interface (MDI) report Presented by M. Weaver, SLAC

M. WeaverPEP-II MAC Review, Dec 04 Run-4 radiation-abort history B. Petersen ~ 1.7/day (Sep 03-Jul 04) ~ 0.6/day, 1-31 Jul 04

M. WeaverPEP-II MAC Review, Dec 04 Run-4 radiation-abort history Run-4 radiation-abort history (cont’d) Since 1 March /332 = 52% sympathetic aborts ~ 1/day...but ~ ½ of these are probably sympathetic! B. Petersen L. Piemontese / S. Foulkes

M. WeaverPEP-II MAC Review, Dec 04 Run-4 radiation-dose history HER trickle starts Outgassing storms B. Petersen Vacuum valve ROD increase probably instrumental

M. WeaverPEP-II MAC Review, Dec 04 Injection- & trickle- background history EMC trigs (always on) LER trickle EMC trigs (always on) HER trickle DCH trigs LER trickle DCH trigs HER trickle Monitor using injection-gated triggers (1  s x 15 ms) HER injection-quality monitor LER LER injection-quality monitor

M. WeaverPEP-II MAC Review, Dec 04 Stored-beam background history SVT  =  (LEB-sensitive) 20% DCH current normalized to Jan 04 background data I DCH, msrd/pred 10% 04 DCH ocp’cy DCH L1 rate Dead time HEB sensitive

M. WeaverPEP-II MAC Review, Dec 04 Background sources in PEP-II  Synchrotron radiation  Synchrotron radiation (this bkg negligible in PEP-II, but not in KEKB)  Beam-gas (bremsstrahlung + Coulomb)  HEB only: B Hbg ~ I H * (p H 0 + P H Dyn * I H ) Note: p 0 = f(T) !  LEB only: B Lbg ~ I L * (p L 0 + P L Dyn * I L ) Note: p 0 = f(T) !  beam-gas x- term: B LHbg ~ c LH * I L * I H (LEB+HEB, out of collision) (?)  Luminosity (radiative-Bhabha debris) – major concern as L   B P ~ d P * L (strictly linear with L)  Beam-beam tails  from LER tails: B L, bb ~ I L * f L (  L,H +/- )  from HER tails: B H, bb ~ I H * f H (  L,H +/- )  Trickle background: B Li, B Hi  Trickle background: B Li, B Hi (injected-beam quality/orbit + beam-beam)  Touschek: B LT  Touschek: B LT (signature somewhat similar to bremstrahlung; so far small)

M. WeaverPEP-II MAC Review, Dec 04 Background characterization measurements Step 1: Beam-current scans  single-beam terms Data: Jan 04 (bef. therrmal outgassing crisis)

M. WeaverPEP-II MAC Review, Dec 04 SVT occupancy (FL1 M01-  ) EMC cluster multiplicity Beam-beam term present in all subdetectors fluctuations, short - & long-term  parametrization optimistic ? Step 2: L & beam-beam terms Total occupancy -HER single beam - LER single beam

M. WeaverPEP-II MAC Review, Dec 04 Step 3: Background Parametrizations  DCH example: total current & occupancies Step 4: Background Extrapolations I DCH = PEP-II parameter projections Tracking efficiency drops by roughly 1% per 3% occupancy DCH LER contribution very small 60 L

M. WeaverPEP-II MAC Review, Dec 04 DCH + TRG When combined, higher trigger rates and long read-out time leads to unacceptable deadtime, driven by the DCH 3-step strategy  DCZ trigger (ready)  Waveform decimation (was implemented Summer ’04)  DCH DAQ upgrade (Summer 05) +DCZ

M. WeaverPEP-II MAC Review, Dec 04 LER  It has been realized that in the SVT (but not in other subdetectors), a large fraction of the “Luminosity” background is most likely due to a HER-LER beam-gas X-term (but: similar extrap’ltn). SVT Integrated dose will be more than 1 Mrad/year by 2007 Backward: Forward: TopEastWestBottom TopEastWestBottom NOW Background now is ~75% HEB [LEB negligible (!)] In 2007, it will be 50% HER, 50% L Background strongly  - dependent By 2007 predict 80% chip occupancy right in MID-plane In layer 1, 10% will be above 20% occupancy

M. WeaverPEP-II MAC Review, Dec 04  Given that future backgrounds have serious implications for detector performance, can anything be done to mitigate them?  Beam-gas backgrounds : manage residual gas pressure  Luminosity backgrounds : learn how to shield  Beam-beam backgrounds : learn how to collimate  How will the IR upgrade affect each of these?  Need to turn to simulation to improve our understanding and test mitigation strategies.

M. WeaverPEP-II MAC Review, Dec 04 Evolution of HER single-beam background, B Petersen N. Barlow M. Cristinziani/T. Glanzman J. Malcles Jan 2004 Apr 2004 Feb 2002 SVT occupancy Jan 2004 EMC clusters Apr 2004 Regularly activating NEGs & TSPs does help ! We should continue to take advantage of single beam opportunities to monitor the background.

M. WeaverPEP-II MAC Review, Dec 04 Turtle Simulation : e + e -  e + e -  Background M. Sullivan P. Roudeau, A. Stocchi, W.K. (preliminary) 10 9 L = z (m)

M. WeaverPEP-II MAC Review, Dec 04 EMC default digi map: luminosity background (N. Barlow) W FwdBkwd  index E E  index Electromagnetic shower debris or…

M. WeaverPEP-II MAC Review, Dec 04 Neutrons J. Va’vra Measurements appear consistent with Turtle radiative Bhabha simulation + GDR cross sections. Projected neutron rates may affect detector electronics – depends upon neutron energy spectrum.

M. WeaverPEP-II MAC Review, Dec 04 Turtle Level Simulations Beam-gas background from the HER (and LER) Where do scattered e - hit? Where do scattered e - come from ? R. Barlow

M. WeaverPEP-II MAC Review, Dec 04  Determining detector response requires Geant level simulation  Beam line up to Q5 implemented in Geant4 simulation of BaBar detector  Considering re-implementation for robustness but carrying on w/o  Added e-N,  -N and neutron transport to physics processes  Detector background analyses integrated for data and simulation alike  First full G4 simulation output of 2004 geometry recently available  Single beam background comparisons look good (normalization?)  Post-2005 configuration (IR upgrade) Turtle not ready Q2 Q4 Q5 B1 Q1 Geant4 Simulations

M. WeaverPEP-II MAC Review, Dec 04 Z location where particles are lost. Colors correspond to upper plot. Starting x, x’ coordinates of particles lost along the beamline. x/  x x’/  x; Z [m] IP Beam-Beam Collimation Study Large X-Emittance: Phase Space Plot

M. WeaverPEP-II MAC Review, Dec m from IP LER m from IP X [mm] xxxx  x [m]  x [2  ] +25 m m Results are based on an older LER deck (’98) with a tune of 0.57 (in x).

M. WeaverPEP-II MAC Review, Dec 04 Beam-beam collimation study: summary  Large-amplitude, horizontal b-tron tails originating at the IP can be effectively curtailed at + 25 m ...at least in the simulation  basically because of the phase-advance relationships reduce this to a one- turn problem, and assuming the impact on LEB lifetime remains manageable.  This study should be redone with the new LER deck & current x-tune of  Vertical tails are not an issue (in the LER)  Pre-trickle collimator-scan data remain to be analyzed.  However, the +25 m collimator  can’t replace existing PR04 collimators in some corners of phase space  provides no protection against Coulomb scatters between PR04 and PR02  Both horizontal and vertical b-tron tails will be studied for the HER

M. WeaverPEP-II MAC Review, Dec 04  Major background source: thermally-enhanced beam-gas  in incoming LER straight  Sensitive to LER current; several time constants in a time-dependent mix  Action: removed several NEGs and collimator jaws  Pressure at low currents may be worse now, but less susceptible to heating   SVT dose + occupancy (E-MID); minor impact on dead time  in incoming HER straight  sensitive to HER current, very long time constants   BaBar dead time + SVT occupancy (W-MID)  in (or very close to) the shared IR vacuum system  sensitive to both beam currents; at least 2 time constants  suspect: NEG + complicated IR ‘cavity’ (Q2L  Q2R) + HOM interference   BaBar dead time + SVT occupancy (W-MID + E-MID)  HOM dominant heating mechanism  mostly long to very long time constants (30’-3 h): suggests low power  sensitive to: bunch pattern, V RF, collimator settings, Z(IP), hidden var’s Outgassing storms

M. WeaverPEP-II MAC Review, Dec 04  Background analysis & mitigation  Background analysis & mitigation [BP, MC/TG, NB, JM/JV, RM, LP, WK/GW]  Background simulations  Background simulations [RB, MB, GC, WL, SM, PR/AS, WK + SLAC (TF/GB)]  Fast monitoring of machine backgrounds  available online in PEP-II CS  Fast monitoring of machine backgrounds  available online in PEP-II CS [MW, C’OG, AP, GDF,...]  injection & trickle quality variables: SVT, DCH, EMC  subdetector occupancies: SVT, DCH, EMC, DIRC  BaBar dead time  more operator-friendly displays (& controls) of radiation inhibits/aborts  BaBar-based machine diagnostics  time distribution of injection triggers [LP, BP,...]  Online centroids & sizes of luminous region using BaBar ,ee [C’OG, BV, AP, IN, MB,...] Continued BaBar involvement in Accelerator Performance Improvements (I)

M. WeaverPEP-II MAC Review, Dec 04  Beam dynamics  beam-beam simulations [IN (Caltech), YC (Slac ARD), WK]  beam-beam experiments, monitoring of beam-beam performance [WK]  ,  *,  z measurements using , ee  Instrumentation  Gated camera: now operational in both in LER & HER [DD, Slac Exptl Grp C]  LER interferometer software [AO, Orsay]  Installation of an X-ray beam-size monitor for the LER [Caltech + LBL + SLAC]  SVTRAD sensor & electronics upgrade [BP et. al. (Stanford); MB/DK et. al. (Irvine) (initiated & funded by BaBar)]  CsI background sensors, n detectors & shielding [JV, Slac Exptl Grp B]  Forward end Fe shielding wall (may allow better collimation elsewhere) BaBar involvement in Accelerator Performance Improvements (II)

M. WeaverPEP-II MAC Review, Dec 04 Summary (I)  Stable-beam (genuine) radiation aborts are down to ~ 1/day  Injection backgrounds under control, expect even better in Run5  Stored-beam bgds (dose rate, data quality, dead time)  OK most of the time –watch for thermal outgassing, esp. HER  Background characterization experiments  Highly valuable in identifying the origin, magnitude & impact of single- & two-beam backgrounds – be opportunistic  Maintain a measure on the projected backgrounds – impacts detector remediation/upgrades with long lead times  G4 Simulation progressing; anticipate better understanding and correlation of sources with detector response  Collimation simulations can direct future background improvements

M. WeaverPEP-II MAC Review, Dec 04 Summary (II)  In the medium term ( ), the main vulnerabilities are  beam-gas backgrounds from HOM-related thermal outgassing as I +,-   high dead time associated with DCH data volume & trigger rates (addressed by DCH elx upgrade)  high occupancy and radiation ageing in the mid-plane of the SVT,  possibly leading to a local loss of tracking coverage.   reduce the HER single-beam background back to 2002 levels (/1.5-2) ?  a high flux of ~ 1 MeV neutrons in the DCH (wire aging from large pulses, possibly also contributions to occupancy)  Background simulations  large investment in reviving/updating tools + rebuilding the group  ‘almost’ ready to evaluate backgrounds in IR upgrade  manpower limited  BaBar-based accelerator performance enhancement  common BaBar-PEPII diagnostics greatly improved, starting to pay off  very significant involvement of BaBarians in beam instrumentation & simulation

M. WeaverPEP-II MAC Review, Dec 04 MDI abstracts submitted to PAC05  Predicting PEP-II Accelerator-Induced Backgrounds Using TURTLE  R. Barlow, W. Dunwoodie, W. Kozanecki, S. Majewski, P. Roudeau, A. Stocchi, T. Fieguth & J. Va’vra  Modelling Lost-Particle Accelerator Backgrounds in PEP-II Using LPTURTLE  T. Fieguth, et al.  GEANT4-based Simulation Study of PEP-II Beam Backgrounds in the BaBar Detector at the SLAC B-Factory  W. Lockman, D. Aston, N. Barlow, N. Blount, M. Bondioli, G. Bower, G. Calderini, B. Campbell, M. Cristinziani, C. Edgar, W. Kozanecki, B. Petersen, S. Robertson, D. Strom, G. Wormser, D. Wright  Beam-induced Neutron Fluence in the PEP-II Interaction Region  G. Bower, W. Lockman, J. Va'vra, D. Wright  Measurement of the Vertical Emittance and beta Function at the PEP-II Interaction Point Using the BaBar Detector  J. M. Thompson & A. Roodman  Measurement of the Luminous-Region Profile at the PEP-II IP, and Application to e+/- Bunch-Length Determination  B.Viaud, W. Kozanecki, C. O’Grady, M. Weaver  Experimental Study of Crossing-Angle and Parasitic-Crossing Effects at the PEP-II e+e- Collider  W. Kozanecki, Y. Cai. I. Narsky, M. Sullivan & J. Seeman

M. WeaverPEP-II MAC Review, Dec 04  Measurement of the Vertical Emittance and beta Function at the PEP-II Interaction Point Using the BaBar Detector  J. M. Thompson & A. Roodman  Measurement of the Luminous-Region Profile at the PEP-II IP, and Application to e+/- Bunch-Length Determination  B.Viaud, W. Kozanecki, C. O’Grady, M. Weaver  Experimental Study of Crossing-Angle and Parasitic-Crossing Effects at the PEP-II e+e- Collider  W. Kozanecki, Y. Cai. I. Narsky, M. Sullivan & J. Seeman