PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.

Slides:



Advertisements
Similar presentations
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Advertisements

Pavement Management Engineer
Wyoming County Paved Roads Management and Monitoring Khaled Ksaibati, Ph.D., P.E. STIC June, 2014.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
European Asphalt Pavement Warranties Scan September 14-28, 2002.
Selecting the Right Maintenance Treatment Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
EVOLVING DEMANDS Highway Usage Increased 29% in the 1990’s Truck Traffic Increased 40% in the 1990’s Truck Traffic Will Increase 3% per year in next 20.
ThinLAY Asphalt for Pavement Preservation
City of Willows Pavement Management Program Road Maintenance Needs March 25, 2014.
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 2 Surface Characteristics.
Lecture 12 Lecture 1L PAVEMENT CONDITION INDICES.
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
FDOT Aviation Pavement Inspection Training Module 2 – Pavement Fundamentals – Overview Florida Department of Transportation Statewide Pavement Management.
The Dalles Pavement Preservation Program Presented by Bill Barrier Transportation Manager City of The Dalles Public Works Department.
A PRESERVING AIRPORT PAVEMENTS Highlights from 2010 ACRP Synthesis FAA Eastern Region 2011 Airports Conference Paul W. Wilke, P.E. Principal Engineer.
Pavement Management Keeping Good Roads Good, Making Poor Roads Better.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
GASB#34 Asset Management TEAM Transportation Fair Presentation by: Charles J. Nemmers, P.E. Charles J. Nemmers, P.E. October 8, 2004St. Louis, Missouri.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Idaho Transportation Department Karen A. Strauss, P.E. Pavement Management Engineer.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
OPTIMIZATION Lecture 24. Optimization Uses sophisticated mathematical modeling techniques for the analysis Multi-step process Provides improved benefit.
Preventive Maintenance
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
PRIORITIZATION.
Session 3-6 HMA Overlays.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
AASHTO SCOP Linking Planning to Programming P2P Link Rural Transportation Summit January 16, 2014 ADOT Vision and Long-Range Plan Planning to Programming.
National Highway Institute Federal Highway Administration
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking.
NETWORK LEVEL EXAMPLES OF PMS İNŞ.YÜK. MÜH. VEYSEL ARLI.
Pavement Preservation Preventive Maintenance
Influence of Pavement Condition on Project Selection
April 19, 2005 PPTG Meeting Education Efforts for the PPTG How to share our knowledge and experience with others.
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Maintenance & Rehabilitation Strategies Lecture 5.
Incorporating Pavement Management into the LRTP John Kiefer, P.E. Research Engineer Center For Technology and Training Michigan’s Local Technical Assistance.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
Session 5 Techniques for Determining Pavement/ Treatment Feasibility.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
By Larry Galehouse, Director, National Center for Pavement Preservation and Jim Sorenson, Team Leader, FHWA Office of Asset Management by Larry Galehouse,
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
Highways Investment Strategy May Background 1,100 km of roads One of the lowest spends in the country Consecutive years of severe weather Significant.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Russian Engineers Training March 2011
FUZZY APPROACH FOR ESTABLISHING THE PAVEMENT CONDITION QUALITY INDEX Gwo-Hshiung Tzeng Institute of Technology Management and Institute of Traffic and.
Design and Rehabilitation Strategies for Sustainable Concrete Pavements H. Thomas Yu Federal Highway Administration Office of Pavement Technology.
Road Pavements and New Approaches! IPWEA CONFRENCE David Moloney Director Infrastructure - Southern Grampians Shire.
Transportation Asset Management PM Peer Exchange Performance Reporting and Target Setting (Section 2): VDOT’s Experience Connie Sorrell Chief of System.
A Data-Driven Strategy to Improve the Quality
European Asphalt Pavement Warranties Scan
Roadway Pavement Management Plan
AN-Najah National University AN-Najah National University
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Multi-Year Programming and Predictive Modelling
Pavement condition index calculation
Pavement Working Group
Pavement Preservation
NRRA Pavement Workshop 2019
Presentation transcript:

PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program

Learning Objectives n Become familiar with terminology n Distinguish between preventive and reactive repairs n Understand basic pavement management concepts u Monitoring pavement condition u Pavement life cycle

Issues n What is pavement preservation? n What is preventive maintenance? n What is corrective maintenance? n When should these actions be taken? n Are these activities effective? n If so, then why doesn’t everyone have a pavement preservation program?

Definitions n Preventive Maintenance n Corrective Maintenance n Pavement Preservation n Pavement Rehabilitation

Preventive Maintenance The planned strategy of cost effective treatments to an existing roadway system and its appurtenances that preserves the system, retards future deterioration, and maintains or improves the functional condition of the system (without increasing structural capacity). - AASHTO’s Standing Committee on Highways

Preventive Maintenance n Planned n Performed on good pavements n Contributes to long- term performance n Examples: Fog Seal, Chip Seal, Thin HMA Overlay

Corrective Maintenance n Reactive n Performed on failing pavements n Does not contribute to long-term performance n Examples: Patching, Pothole Repair

Pavement Preservation The sum of all activities undertaken to provide and maintain serviceable roadways; this includes corrective maintenance and preventive maintenance, as well as minor rehabilitation projects - National Highway Institute

Pavement Preservation Pavement Preservation Preventive Maintenance Corrective Maintenance =+

Pavement Rehabilitation Work undertaken to extend the service life of an existing pavement. This includes the restoration, placing an overlay, and/or other work required to return an existing roadway to a condition of structural and functional adequacy. - National Highway Institute

Candidate for…?

Types of Maintenance Activities SometimesNoGenerallyCorrective Yes Preventive Probably NotNo Reactive (Demand) SometimesNot NecessarilyYesRoutine Extends Facility Life? Before Deterioration?Planned?Type

Pavement Management Concepts n Pavement Life Cycle n Pavement Condition n Pavement Condition Index (PCI) n Pavement Serviceability Index (PSI) n Critical “PCI”

Time or Traffic Pavement Condition Pavement Lifecycle

Pavement Condition n Pavement Condition can be rated using any number rating systems, including: u Pavement Condition Index (PCI) F PCI = 100 is New/Excellent and PCI = 0 is Failed u Present Serviceablity Index (PSI) F PSI = 5 is New and PSI = 0 is Failed F Used in the AASHTO Design Methodology u International Roughness Index (IRI) F Rating is Inches/Mile and is automatically recorded

Excellent Very Good Good Fair Poor Very Poor Failed Pavement Condition Index n Corps of Engineers Develop for Airfields n ASTM now has standards for both highways and airfields n Analyze Distresses u Type u Severity u Density

Pavement Condition Index n Example: u Distress Type: Weathering/Raveling u Distress Severity: Moderate u Distress Density: 100% of Surface u PCI Deduct Value: 12pts u Pavement Condition Index: 88

Time or Traffic Pavement Condition Index PCI = 88 Pavement Condition

Time or Traffic Pavement Condition Index Critical PCI = Pavement Condition

Time or Traffic Pavement Condition Index Preventive Maintenance Corrective Maint, Rehabilitation, or Reconstruction Critical PCI

Time or Traffic Pavement Condition Preventive Maintenance Preventive Maintenance

Corrective Maintenance/Repair Time or Traffic Pavement Condition Corrective Repairs

Rehabilitation Time or Traffic Pavement Condition Rehabilitation

Reconstruction Time or Traffic Pavement Condition Reconstruction

Applying the right treatment... To the right pavement... At the right time Philosophy of Pavement Preservation

Benefits of a Pavement Preservation Program n Higher customer satisfaction n Better informed decisions n Improved strategies and techniques n Improved pavement condition n Costs savings n Increased safety

NQI Survey of Users n Moderate level of satisfaction with highway system n Considerable opportunity to improve customer satisfaction n Prefer permanent over temporary repairs u “Get in, Stay in, Get out, Stay out.” n Complete construction in a timely fashion

Better Informed Decisions n Program relies on proper treatment selection and treatment timing n Need information to make decisions n Successful programs have been integrated with Pavement Management Systems (PMS)

Improved Pavement Condition n Preventive maintenance helps to preserve a pavement and extend its performance n Overall condition of network improves u Fair, Poor, and Failed Pavements are reconstructed and returned to a high pavement condition u Excellent and Good Pavements are kept in high condition

Time or Traffic Pavement Condition Preventive Maintenance Pavement Condition

Effect of Pavement Preservation % Poor% Fair% Good% Excellent % of Pavement Network 1994 Base1999 Worst First1999 Preventive

Cost Savings n Most persuasive argument for shifting to preventive maintenance strategies n Forms of cost savings u Less expensive treatments u Longer pavement life u Reduction of user delay costs

n Preventive maintenance: $10,270 n Rehabilitation:$45,570 n Reconstruction: $574,000 Cost Comparison of Options

Use of PMS Information FailedPoorFairGoodExcellent Condition Rating (PCI) Percent of Network Current Year 5

Increased Safety n Safety is the #1 priority of users n Explicit benefits u Improved surface friction u Fewer defects n Implicit benefits u Better pavement condition u Fewer and less disruptive repairs

Additional Benefits n Agencies have a stable budget n Agencies have stable workforce n Contractors have stable workforce n Not affected by upswings and downswings

Current Funding Status n In the past, eligibility for Federal funding required that the pavement be improved structurally n Recent highway bills have changed the way preventive maintenance is funded

Challenges to Implementation n Agencies that have implemented a preventive maintenance program report extremely positive results. n Why isn’t everyone doing it? n Barriers, both real and perceived...

Public Perceptions n Public averse to steering maintenance dollars toward pavements in good condition n Agencies more likely to receive complaints about specific defects than overall network n Need to educate the public about new philosophy

Management Perceptions n Need commitment from management to succeed n Maintenance not traditionally given a high priority n Need to create awareness of benefits n Personnel changes disrupt continuity

Summary n Anticipated benefits u Higher customer satisfaction u Better informed decisions u Improved strategies and techniques u Improved pavement condition u Cost savings u Increased safety u Stability

Summary (cont’d) n Challenges are widespread u Public perception u Management perception

So what is Pavement Management ? n Systematic method for routinely collecting, storing, and retrieving decision-making data needed to make maximum use of limited dollars n It also creates a set of steps or computer routines for quickly accessing the data to arrive at educated decisions

Review n Become familiar with terminology n Distinguish between preventive and reactive repairs n Understand basic pavement management concepts u Monitoring pavement condition u Pavement life cycle

Questions? PMS