Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 6 December 2011.

Slides:



Advertisements
Similar presentations
LHC monojet measurements and interpretations David Berge, CERN, ATLAS Measurements by ATLAS and CMS ADD interpretations WIMP interpretations.
Advertisements

Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 11 October 2011.
Effect of b-tagging Scale Factors on M bb invariant mass distribution Ricardo Gonçalo.
Recent Results on the Possibility of Observing a Standard Model Higgs Boson Decaying to WW (*) Majid Hashemi University of Antwerp, Belgium.
ZH ➝ ννbb news & plans Ricardo Gonçalo ZH->ννbb phone meeting – 24/1/2012.
HSG5: work towards Moriond H->bb paper for Moriond: – WH->lνbb and ZH->llbb: – Analysis seems ready. See status here:
Top Turns Ten March 2 nd, Measurement of the Top Quark Mass The Low Bias Template Method using Lepton + jets events Kevin Black, Meenakshi Narain.
Kevin Black Meenakshi Narain Boston University
H->bb Winter Note Ricardo Gonçalo (RHUL) HSG5 H->bb Winter Note Meeting, 12 January 2011.
VH (H->bb) Cut Flow Status. Introduction Hoping to start the mini-ntuple etc production now Some push over last few days but still not as much as would.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 2 August 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 30 August 2011.
Data results for inclusive all-hadronic (RA  with 318 nb -1 SUSY Hadronic/GMSB Meeting [C. Rogan et al.] Data Plots Towards.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 18 October 2011.
A. Martyniuk a, P. Miyagawa b, M. Owen c, O. Trifis c, V. Chavda c, and U.K. Yang c a: University of Victoria b: University of Sheffield c: University.
Associated top Higgs search: with ttH (H  bb) Chris Collins-Tooth, 17 June 2008.
Trigger Menus Invisible Higgs input to trigger menus for initial running 4/9/2007 Invisible Higgs CSC Note meeting Ricardo Goncalo, RHUL.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 5 April 2011.
Introduction Ricardo Goncalo ATLAS-UK Higgs Meeting, 3 November 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 3 May 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 26 April 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 25 October 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 10 May 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 22 November 2011.
Commissioning Studies Top Physics Group M. Cobal – University of Udine ATLAS Week, Prague, Sep 2003.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 8 March 2012.
H ➝ bb search and b-tagging Ricardo Gonçalo on behalf of the Higgs subgroup 5.
BANG H ➞ bb Searches in ATLAS Ricardo Gonçalo – Royal Holloway Chicago 2012 Workshop of LHC Physics in the Higgs Era University of Chicago 14 th November.
Search for the Standard Model Higgs boson produced in association with a vector boson and decaying to a b-quark pair with the ATLAS detector at the LHC.
Sensitivity Prospects for Light Charged Higgs at 7 TeV J.L. Lane, P.S. Miyagawa, U.K. Yang (Manchester) M. Klemetti, C.T. Potter (McGill) P. Mal (Arizona)
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 9 March 2011.
QCD and Top backgrounds in W+jets and Rjets Alessandro Tricoli (CERN) on behalf of W+jets and Rjets groups 3 rd May 2013 W+jets and Rjets EB Meeting.
News from Jet/Etmiss Monica. Jet/Etmiss meeting yesterday (25/5) at P&P week – Mostly review of conf notes for ICHEP10 – Good review to check where we.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 23 August 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 31 May 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 29 March 2011.
Timescale The nominal dates for SM approvals for EPS are June 30 and July 7 for the Plenary meetings, with availability of a draft supporting note to the.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 8 February 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 8 November 2011.
First ed. board for CERN Council note Ed.board meeting on Friday:
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 March 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 7 June 2011.
1 TOP MASS MEASUREMENT WITH ATLAS A.-I. Etienvre, for the ATLAS Collaboration.
H->bb Note Schedule Ricardo Gonçalo (RHUL) HSG5 H->bb WH/ZH note meeting with Editorial Board, 28 June 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
H ➝ bb Note Meeting Malachi Schram, McGill Ricardo Gonçalo, RHUL H->bb 7TeV meeting, 5/11/2011.
HSG5 Report: ongoing activity and 2012 plans Ricardo Gonçalo (RHUL) Higgs Working Group Meeting – 10 May 2012.
Status and news 1 Z.Liang. MC11 requests According to Joao, MC11 production are almost done According to Joao, MC11 production are almost done There is.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 15 November 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 February 2011.
Searching for the Higgs boson in the VH and VBF channels at ATLAS and CMS Dr. Adrian Buzatu Research Associate.
Introduction Malachi Schram (McGill), Ricardo Gonçalo (RHUL) H->bb Note Meeting, 15 December 2010.
H->bb Status Ricardo Gonçalo (RHUL) on behalf of the H->bb analysis team HSG5 Meeting, 16 February 2011.
HSG5 Status Paper/note circulation: Reading of draft 1on 24 th April: – Talks by Giacinto and Pippa Inputs for combination: separated WH/ZH for vvbb next.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 25 October 2011.
La Thuile, March, 15 th, 2003 f Makoto Tomoto ( FNAL ) Prospects for Higgs Searches at DØ Makoto Tomoto Fermi National Accelerator Laboratory (For the.
Mass measurement of the Higgs boson Mykhailo DALCHENKO (on behalf of the ATLAS and CMS collaborations)
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 15 February 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
TtH(H->bb) searches in ATLAS and CMS Ricardo Gonçalo Collider Cross Talk, 18 October 2012.
Introduction Ricardo Gonçalo HSG5 weekly meeting – 3 February 2012.
News from H->bb Ricardo Gonçalo on behalf of H->bb Note group HSG5 Meeting – 3 Dec
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 16 August 2011.
Photon Physics activities Higgs activities ATLAS LPNHE group meeting, 2011, Nov. 8th.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 21 June 2011.
Presentation transcript:

Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 6 December 2011

Plan for WH/ZH paper Following plan by Phys.Coor. and Higgs convenors, CONF notes changed to papers – Only results from papers accepted for ATLAS combination to be released end of January – To be released at same time as CMS results Same CONF note editors: – Andy Mehta, Giacinto Piacquadio and Paul Thompson Editorial Board will need another element - 4 members for paper editorial boards Aiming for analysis approval in Higgs meeting Thursday next week (15 December) – Should have enough time for interactions with Ed.Board in January Links: – COM note (ATL-COM-PHYS ): – SVN area for note: TL_COM_PHYS_2011_ TL_COM_PHYS_2011_1648 Ricardo GoncaloHSG5 H->bb Weekly Meeting - 06/12/20112

Plan for WH/ZH paper To-do list: Paul, Andy, Carl, Benedict: – Look into constraining JES using the M(W->jj) in tt->blv bjj – Establish procedure to get the Wbb shape in WH Michiel, Giacinto: – Acceptance uncertainty from theory – Theory uncertainty on signal shape and effect on p T H bins In parallel (Jonas, anyone else?): – Cross-check analyses if ready – Anything else? Would be happy if we can split tasks to converge in this timescale (see today’s talks) Next steps: Freeze cuts today – discussion after talk by Paul Final dress-rehearsal in next week’s meeting Ricardo GoncaloHSG5 H->bb Weekly Meeting - 06/12/20113

B-tagging uncertainty Meeting yesterday with b-tagging convenors Plan is to use preliminary (MC11a) scale factors for now and replace asap with MC11b factors – smaller MC statistical uncertainty B-tagging convenors will revisit safety factor of 2x enhancement in errors of highest p T jet bin (>140GeV) Will get new scale factors by end of January – Will include more MC stats for pTrel templates – Will include combined results from pTrel and ttbar – Not for current paper! Ricardo GoncaloHSG5 H->bb Weekly Meeting - 06/12/20114

Other analyses Boosted VH: – COM note (ATL-COM-PHYS ): – SVN: ysics/Higgs/HSG5/data_7TeV/ATL_COM_PHYS_2011_1 638https://svnweb.cern.ch/trac/atlasgrp/browser/Ph ysics/Higgs/HSG5/data_7TeV/ATL_COM_PHYS_2011_1 638 – Placeholder for intermediate results – I suggest we do the same for other analyses! ZH->ννbb, VBF, ttH Ricardo GoncaloHSG5 H->bb Weekly Meeting - 06/12/20115

Time of the HSG5 wekly meeting Doodle poll: So far… Thursday 2pm is ahead, but 8 people cannot make it Ricardo GoncaloHSG5 H->bb Weekly Meeting - 06/12/20116

My to-do list Ask Ed.Board members to continue for paper Make SVN area for COM for other analyses Follow up on MC requests for ZH->ννbb, ttH, VBF/ggF Try to find better time slot for HSG5 meeting Anything else? Remember ATLAS and CMS Higgs seminar: main auditorium on 13 December at 14:00 Ricardo GoncaloHSG5 H->bb Weekly Meeting - 06/12/20117

Backup Ricardo GoncaloHSG5 H->bb Weekly Meeting - 06/12/20118

December Note(?) First editorial board meeting – introduced issue Not yet done: – Run on all 2011 data (missed part of period M and some other data files) – Run on MC11b datasets – status? – Move to METRefFinal done in analysis software but unchecked – Apply recommended electron fudge factors (appeared on Friday – see text file attached to agenda) – Treatment of inefficiency due to bad muon trigger region in period L (trigger muon scale factors appeared on Saturday – attached to agenda) Points of concern/to follow up – Availability of MC11b datasets – Vertex multiplicity/MET/pile-up due to pythia 8 minbias events in mc11 (ongoing) – Data/MC agreement in 0-jet bin of WH analysis (note analysis cut on Njet>2) – b-tagging scale factors - p T -dependence may sculpt signal, especially due to bin edges – Jet systematics – recommendations? Reminder of timeline: – Higgs approval: aim for 25, but no margin! – Circulation to ATLAS for 1 week for comments (up to 2 Dec. at latest) Can be reduced to 3 days if we find a nice peak at 115 GeV, confirmed by H->γγ – Public presentation plus 1 week for last comments (9 Dec. at latest) – CERN Council meeting starts 12 December Ricardo GoncaloHSG5 H->bb Weekly Meeting - 06/12/20119