Quality Improvement James Pappas, MD, MBA The speaker does not have any relevant financial relationships with any commercial interests.

Slides:



Advertisements
Similar presentations
Standard Work Making the “new way” become the standard way
Advertisements

The information contained in this presentation, the source code and underlying program are protected by copyright owned by PlusDelta Technologies, LLC.
Understanding the Current Condition
And Learning TEAL Consulting Limited a a Meeting Customer Demand in Challenging Times July 2010.
The Model for Improvement Introducing Process Mapping.
Benefits of the new EAM release QAD West Coast Users Group Presenter: Kate Fenello EAM 12.8.
An Introduction to Cost Terms and Purposes
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
Introduction to software project management. What is a project? One definition ‘a specific design or plan’ ‘a specific design or plan’ Key elements non-routine.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© 2009 Public Health Informatics Institute Multi-State Learning Collaborative September 17, 2009.
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Scott D. Duncan, MD, MHA, FAAP. Science of Safety We cannot improve quality and safety of healthcare until we view the everyday delivery of healthcare.
Page 1 Copyright Jill M. Forrester This work is the intellectual property of the author. Permission is granted for this material to be shared for.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
VALUE STREAM MAPPING WORKSHOPS Purpose: To restructure the process for designing and permitting California hospitals in order to generate more value for.
Business Process Re-engineering: A Critical Success Factor in Implementation of Enterprise Resource Planning Presented by: Jasmin S. Ponce.
© 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© Mahindra Satyam 2009 Project Metrics QMS Training.
4.04 Understand marketing- research activities to show command of their nature and scope.
CMMI Technology Conference and User Group November 2003 Experiences with Leveraging Six Sigma to Implement CMMI Levels 4 and 5 Jeff Facemire & Hortensia.
Seattle Area Software Quality Assurance Group Release and Configuration Management, The Acceleration of Change and Its Contribution To Software Quality.
LeanSigma ® Facilitator Training Module 5 – Waste.
Course: Government Process Re-engineering Day 3 Session 5: Key Learning, Feedback and Training course wrap-up.
Systems Development Lifecycle Project Identification & Selection Project Initiation & Planning Analysis Logical Design Physical Design Implementation Maintenance.
[Facility Name] [Presenter Name] [Date]. Objectives 2 After this session, you will be able to 1. describe Root Cause Analysis (RCA) and Plan-Do-Study-Act.
Extreme programming overview Agenda  Extreme programming goals  Extreme programming values  Extreme programming practices  The Extreme programming.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Advancing Productivity, Innovation, and Competitive Success The Association for Operations Management Achieving Inventory Accuracy G.L. (Jerry) Kilty,
Chapter 4 Performance Management and Appraisal
The Traditional Accounting Information System Architecture
Baseline Data Measure Kaizen Facilitation. Objectives Define data types and purpose Explain concepts of efficiency and effectiveness Provide tips on establishing.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Lean Office Training YOU to Recreate Your World Course Agenda »Lean office overview »Definition of waste »Implementing lean tools »Next steps.
Chapter 8 Problem-Solving Using Define, Measure, Analyze, Improve, Control.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Cost Accounting Dr. Baldwin University of Arkansas – Fort Smith Fall 2010.
December 21, 2015Prof. Vivek Kumar1 Six Sigma Tools for Measure.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
QI Tools to Diagnose HPV Vaccine Delivery Concerns in Your Practice
Traditional Economic Model of Quality of Conformance
/0904 © Business & Legal Reports, Inc. BLR’s Training Presentations Creative Problem-Solving.
SOFTWARE PROCESS IMPROVEMENT
Advances In Software Inspection
1 Lean Office - Value Streams
By the end of this module, you will be able to... Recognize opportunities for improvement and generate creative ideas for change Develop and test an idea.
PARTICIPANT CONFERENCE CALL INFORMAL PROCESS IMPROVEMENT.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
MAJOR SOFTWARE FAILURES, WHY THEY FAILED AND LESSONS LEARNED BY AKPABIO UWANA.
Version 1.5 – 07/11/08 5S Housekeeping April 13 th 2010 Cohort 1 - Day 4 April 13 th 2010 Cohort 1 - Day 4 NHS MILTON KEYNES QUALITY IMPROVEMENT MODEL.
1 Design and evaluation methods: Objectives n Design life cycle: HF input and neglect n Levels of system design: Going beyond the interface n Sources of.
© 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
© 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
MODERN ERP SELECT, IMPLEMENT & USE TODAY’S ADVANCED BUSINESS SYSTEMS
Introduction To DBMS.
Inventory Management, Just-in-Time, and Quality Costing
TechStambha PMP Certification Training
ServiceNow Implementation Knowledge Management
Classical Waterfall Model
4.00 Understand promotion and intermediate uses of marketing-information Understand marketing-research activities to show command of their nature.
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
in Construction Industry
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Presentation transcript:

Quality Improvement James Pappas, MD, MBA The speaker does not have any relevant financial relationships with any commercial interests

AIMA3

What is Root Cause? Injury Poor building design caused by Root Cause is the lowest point in the cause and effect chain that we can affect within our span of control or sphere of influence. SPAN OF CONTROL (Full authority) SPAN OF CONTROL (Full authority) SPHERE OF INFLUENCE (Influence or persuasion only) SPHERE OF INFLUENCE (Influence or persuasion only) OUTSIDE, UNCONTROLLED ENVIRONMENT Electrical cords on floor caused by Fall caused by Lack of electrical outlets caused by AIM Tripping hazard caused by Root Cause

Draw the initial process map then walk Flow volumes/rates Cycle (rework/delays) Value (value-add/non-value-add) Costs: COPQ & operating Handoffs Quality (DPMO, Capability) Action Triggers Automated vs. Manual Steps Data (Sources & Uses) whatwhy  Physically follow the process as documented from beginning to end. The purpose is to understand what is being done and why it is being done.  Gather information about existing problems and roadblocks. Include data regarding: MAP

Looking at each process step for: Bottlenecks or constraints Sources of delay Extra handling Errors being fixed instead of prevented (rework) Role ambiguity (don’t know who…) Redundancy Duplications Unnecessary steps, waste Cycle time MAP

VERSIONS OF A MAP AT LEAST THREE This is what we Need! What You Think It Is... What You Would Like... What It Actually Is... MAP

Measurement’s Role 1.You can’t manage what you can’t measure! 2.What gets measured gets done. 3.Measurement impacts behavior. © 2012 The Quality Group - All Rights Reserved v5.0 MEASURE

Performance Measurement customer’s problem  Integral to measuring the extent of the “customer’s problem” baseline  Measure how well your process is performing before you start your improvement effort – baseline. goal  Measure your process after your improvement effort – Did you achieve your goal? Measure System Analysis  Measure how good the results are – Measure System Analysis 1.Select what to measure Hint: think Y=f(X) 2.Develop operational definitions 3.Identify data source 4.Prepare collection and sample plan 5.Implement and refine measurement MEASURE

P D S A C y c l I n g Plan Objectives, predictions, plan the cycle, plan for data collection Do Test the plan, Document the results and record data; begin analysis of the data Study Complete the analysis of data, compare to predictions, summarize learning's Act What changes are to be made? Adjust the plan for the next cycle PDSA