October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
April 16, 2010 Regional Planning Group RMR Exit for Spencer 5 – Remedial Action Plans Chris Ngai Jay Teixeira.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
ERCOT PUBLIC 5/20/ RTP July 22, ERCOT PUBLIC 5/20/ Outline  Updates to 2014 RTP  RTP Next steps.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
ERCOT Independent Review
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
CREZ - Voltage Profiles on Series Compensated Lines Prepared by Paul Hassink with AEPSC ERCOT RPG, 11/11/11.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
Houston Import Study Update
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2009 Five-Year Transmission Plan Update
Entergy Integration Study Update
Warren Lasher Manager, Long-Term Planning and Policy
RMR Exit for Spencer 5 – Remedial Action Plans
Presentation transcript:

October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo

2 RPG MeetingOctober 16, Five-Year Transmission Plan: Where we’re at Conditioned Case N-X Analysis G-1 + N-X Analysis TO/ MP Input Reliability Project Backout Reliability AC Case Economic Analysis AC Case with All Upgrades = Complete= In Process= Not Started

3 RPG MeetingOctober 16, Five-Year Transmission Plan Reliability Analysis Two significant project changes since last update –Changed Alliance 345/138-kV autotransformer project to Hicks 345/138-kV autotransformer project –Changed addition of second 345/138-kV autotransformer to Mustang 345-kV station and autotransformer project Miscellaneous reliability project changes since last update based on comments from Transmission Owners

4 RPG MeetingOctober 16, 2009 Hicks 345/138-kV autotransformer project Reliability Issue: One Roanoke 345/138 kV autotransformer overloads for the loss of the other Roanoke 345/138 kV autotransformer in 2013 and 2014 Not feasible to replace both Roanoke autotransformers or add a third autotransformer Additional need to add transmission southwest of Roanoke for load growth needs

5 RPG MeetingOctober 16, 2009 Hicks 345/138-kV autotransformer project Two options studied: 1.Build new 345/138 kV station near Alliance; construct double circuit 138 kV line from new station to new load serving stations to Elizabeth Creek Cost = $21.5M + cost of new 138 kV double circuit 2.Construct a 138 kV bus at the new Hicks CREZ station and install a 345/138 kV autotransformer, construct double circuit 138 kV line from Hicks to new load serving stations to Elizabeth Creek Cost = $11.0 M + cost of new 138 kV double circuit –Length of new 138 kV double circuit roughly the same for both options so cost assumed to be the same Both options tested in 5YTP 2014 economic case with and without CREZ generation –Hicks option resulted in production cost savings of $2.12M in 2014 economic benchmark case –Hicks option resulted in production cost savings of $3.75M in 2014 economic case with CREZ generation –Savings resulted from reduction in congestion on the Hicks-Alliance 345 kV line for the contingency of Hicks-Roanoke 345 kV line Option 2 (Hicks) recommended as preferred option

6 RPG MeetingOctober 16, 2009 Mustang 345 kV station project 2014 Reliability Issues: –Collin 345/138 kV autotransformer overloads for the contingency loss of Collin-Carrollton Northwest 345 kV line –Low voltages on Kruegerville-Frisco 138 kV line for the contingency loss of Collin-Frisco 138 kV line –Existing series reactor at Collin (SPS) does not relieve overload in 2014

7 RPG MeetingOctober 16, 2009 Mustang 345 kV station project Two options studied 1.Add second 345/138 kV autotransformer at Collin, install shunt capacitors on Kruegerville-Frisco line –Existing stations on Kruegerville-Frisco line not sized for capacitor bank additions –Cost ~ $11-12M 2.Create a 345 kV bus at Mustang, loop one circuit the Anna-Krum West 345 kV CREZ line into Mustang, install a 345/138 kV autotransformer at Mustang –Cost ~ $18.5M Other considerations –High load growth area –Mustang option (Option 2) provides support to east side of Denton loop Mitigates the need to reconductor Pockrus-Denton Steam 138-kV line (<$1M) Option 2 recommended as preferred option

8 RPG MeetingOctober 16, Five-Year Transmission Plan Economic Analysis 2014 Economic Projects

9 RPG MeetingOctober 16, Five-Year Transmission Plan Economic Analysis 2014 Changes since August RPG Meeting –Various model corrections and updates (see posted spreadsheet: “2009 5YTP Economics 2014 Project Set xls”) –Changed Horse Hollow 3 to inject into Kendall (via NextEra private 345 kV line) To relieve congestion due to contingency loss of one Bluff Creek 345/138 kV autotransformer overloading the other Bluff Creek autotransformer Not economic to switch more Horse Hollow generation to Kendall due to congestion near Kendall –Ten economic projects: Upgrade the Alvin Tie Sw Station (39015) – Alvin Sub (39030) and the Hastings Sub (39010) – Friendswood Sub (38980) – Seminole Sub (38990) - Magnolia Sub (38950) 138 kV lines from 190/190/190 to 326/326/326 MVA Add a 345/138 kV autotransformer at Panhandle A_D (99104) and rebuild Matador-Spur as a double circuit line with one side operated at 138 kV and the other side operated at 69 kV. Connect McAdoo and Whirlwind to the 345/138 kV autotransformer via 138 kV lines. The 138 kV circuit will not be connected to the load serving system. The 69-kV circuit will be connected only to the load serving system. Add a second circuit to Oasis (43035) – South Alvin (43030), 345 kV Upgrade the 345/138 kV autotransformer at Greens Bayou from 400 to 600 MVA Upgrade the Midland East (1023) – Stanton West (1326) 138 kV line from 84/84/84 to 394/394/394 MVA Build a second Kenedy Switching Station #1 (8184) – Kenedy (8188) 69 kV with a different right of way Upgrade the Round Rock (3668) – Round Rock Northeast (3670) 138 kV line from 214/214/214 to 326/326/326 MVA Upgrade the Seagoville (3076) – Kleberg Tap (3077) 138 kV line from 214/214/214 to 326/326/326 MVA Upgrade the Hidalgo (8963)-Monte Cristo (8708)-Aderhold Substation (8754) 138 kV line to 365/365/365 MVA Add a 1.2-ohm series reactor at the terminal of the South McAllen (8371) – Las Milpas Substation (8758) 138 kV line

10 RPG MeetingOctober 16, Five-Year Transmission Plan 2014 Economic Analysis Select Projects

11 RPG MeetingOctober 16, 2009 Alvin area projects New 345/138 kV station and autotransformer scheduled to be constructed at Meadow (formerly South Alvin) in May 2010 Congestion expected on 138 kV lines exiting Meadow towards the east for contingency loss of Meadow-PH Robinson 345 kV line Congestion expected on Oasis-Meadow-PH Robinson 345 kV line for contingency loss of Cedar Bayou-Chambers/ Cedar Bayou-North Belt 345 kV double circuit and n-0

12 RPG MeetingOctober 16, 2009 Alvin area projects CenterPoint has TPIT project to uprate Oasis-PH Robinson 345 kV line by end of YTP economic recommendations: –Add second circuit to Oasis-Meadow 345 kV line Cost = $4.9M 2014 PC Savings = $2.8M Ratio = 1.75 < 6 –Upgrade Alvin Tie (Meadow)-Alvin and Alvin Tie (Meadow)-Hastings- Friendswood-Seminole-Magnolia Cost = $21.2M 2011 PC Savings = $5.2M Ratio = 4.08 < 6 *Alvin Tie (Meadow)-Hastings 138 kV line upgrade is a reliability project in 2014

13 RPG MeetingOctober 16, 2009 Lower Panhandle Project Congestion on lines exiting the Whirlwind and McAdoo wind generation plants –Daily Operations –5YTP models Whirlwind – 60 MW McAdoo – 150 MW

14 RPG MeetingOctober 16, 2009 Whirlwind Spur Matador Lower Panhandle Project 5YTP Solution – Construct project to separate wind power from load serving system and instead inject to CREZ system Waiting for cost estimates to determine if economic ~ ~ Cottonwood (Pan A-D) McAdoo

15 RPG MeetingOctober 16, YTP Next Steps Finish Analysis by October 30 Report First Draft by November 13

16 RPG MeetingOctober 16, 2009 Questions?