MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS

Slides:



Advertisements
Similar presentations
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
Advertisements

SPE Getting the Most out of Networked Drillstring Petersen, Sui, Frøyen, Nybø Center for Integrated Operations in the Petroleum Industry & SINTEF.
DESIGNING A WATERFLOOD Designing a water flood involves both technical and economic consideration. Economic analysis are based on estimates of water.
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
Petroleum Engineering 406
Drilling Engineering – PE311 Circulating System
GUIDING QUESTION:FEB. 22, WHAT WOULD BE A GOOD TITLE FOR THIS PHOTOGRAPH? 2.WRITE A QUESTION THAT YOU WOULD LIKE TO HAVE ANSWERED ABOUT THIS PHOTOGRAPH.
ATMATM PETE 689 UBD ATMATM ATMATMATMATM Lesson 17 Flow Drilling Mudcap Drilling Snub Drilling Closed Systems Read: UDM Chapter pages
Lesson 14 Jet Bit Nozzle Size Selection
Drilling Engineering – PE 311 Drill Bit Optimization
Well Control Gas Solubility.
Auditing Computer Systems
Geothermal Energy Technology and International Development Forum ThermaSource, Inc.: A Drilling Point of View Louis Capuano, Jr Chief Executive Officer.
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
PETE 203 DRILLING ENGINEERING
Integrated Drilling and Logging Program Approach in HPHT Environment: Successful Drilling of Deepwater Oberan Field, Nigeria, ENI Deepest Well in Deep.
Chapter 13: Audit Sampling Spring Overview of Sampling.
PETE 411 Well Drilling Lesson 23 Gas Cut Mud.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
WILLBROS A Good Job On Time Hydrostatic Testing Practices Establishing Verifiable, Traceable, and Accurate Documentation August 20, 2013 Hal Ozanne Willbros.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Quality Assurance in the clinical laboratory
Lesson 3 The Rig - Drilling Equipment
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Lesson 25 Well Control, cont’d
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
Best Cost-Effective Technology Independent and Neutral Company 24/7 Worldwide Technical Support MARCH 2011 TECHNICAL UPDATE The independent.
Drilling operation to get subsurface data. Why subsurface drilling is needed? As we cant look into subsurface directly, drilling is done to bring the.
Codex Guidelines for the Application of HACCP
Lesson 15 Surge and Swab Pressures
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Petroleum Engineering Presented by : Mostafa Khojamli November
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Completing & Producing A Well
NFPA 31 Standard for the installation of Oil- Burning Equipment
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
Procedure Writing Basics Mr. Richard Crisler Spring-2006.
Lesson 26 * Well Control * * Variable Geometry *
Copyright © 2007 Pearson Education Canada 3-1 Marketing Research Marketing research serves many roles. It can: 1.Link companies with customers via information.
Petroleum Engineering 406 Lesson 4 Well Control. Read Well Control Manual –Chapter 9 Homework 2 Due Feb. 3, 1999.
Chapter 5 Job Analysis.
Well Logging/Nuclear Kevin Kapka. Basic History The use of radiation to analyze formations appeared shortly after World War II. The initial application.
Topics Covered: Data processing and its need Data processing and its need Steps in data processing Steps in data processing Objectives of data processing.
16/April/2007© Donovan Brothers Inc. Automated Mudlogging Systems SM Slide 1 of 46 MUDLOGGING UNCONVENTIONAL GAS RESERVOIRS Bill Donovan, PE Donovan Brothers.
Early Offshore Petroleum Development Cost Estimates Using GIS Narmina Lovely, GEOG 596A Advisor: Patrick Kennelly.
Well Log Interpretation Basic Relationships
Fluid Saturation Introduction
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Wellbore Stability in Olmos Formation
Introduction to Well Completions
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
Lecture 10 Production Engineering
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Cementing How it is Done
Dimensional Analysis & Unit Conversions
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Developing Information Systems
It’s not just for breakfast anymore
TWM Basic Steps to Perform Valve Check Load Test.
Process Control: Introduction to Quality Control
Chapter 2 Table of Contents Section 1 Scientific Method
Process Control: Introduction to Quality Control
Process Control: Introduction to Quality Control
Presentation transcript:

MUD LOGGING DEFINITION, THEORY & LAG CALCULATIONS

- Mud logging is a service that qualitatively and quantitatively obtains data from, and makes observations of, drilled rocks, drilling fluids and drilling parameters in order to formulate and display concepts of the optional, in situ characteristics of formations rocks with the primary goal of delineating hydrocarbon “shows” worthy of testing. - The mud logging unit is the information center on the rig site to serve both exploration and drilling.

General Purposes - Optimized drilling efficiency. - Comprehensive formation evaluation. - Improved well site safety.

Role played by Mud Logging Unit the collection of the rock cuttings which is geologically described, examined for any oil shows and then packed. the hydrocarbon & some non hydrocarbone gas monitoring while drilling. the monitoring of the drill fluid volume and to immediately inform the personnel in charge about any change in that volume confirming with the driller about any drilling breaks.

the generation of mud logs and graphs during the drilling of the well, acquisition of the data and producing a final well report. the monitoring of the drilling parameters & informing the personnel in charge about any anomalies. monitoring the trips and updating a trip sheet at a five-stand basis the detection and evaluation of the formation pressure, the hydraulics optimization and the well control.

The mud logging unit is considered the information centre of the rig site as the unit participates in the monitoring of each and every rig operation.

TYPES OF MUD LOGGING UNITS Off-line mud logging units. On-line mud logging units. A- Mud Logging Off-line service features The off line mud logging unit includes a number of separate panels. Each panel works independently and is responsible for measuring a definite parameter. There is no communication between these panels. No automatic calculations can be done and no data storage. All panel calibrations are done manually. The difference between the swabbing action and the piston effect.

TYPES OF MUD LOGGING UNITS B- Mud Logging On-line service features 1-Minimum human interference: - Random errors minimized, i.e best accuracy. - More time for interpretation & More time for monitoring. 2- Fully computerized service: - High speed data processing (possible data transmission) - Better presentation of data & On time decision making. The difference between the swabbing action and the piston effect.

B- Mud Logging On-line service features (continue) 3- Best possible equipment design: - Maximum possible accuracy. - Minimum systematic errors & Minimum down time. 4- Intrinsic safety: - Safety environment - Safety equipment & Efficient warning system. The difference between the swabbing action and the piston effect.

DUTIES & RESPONSIBILITIES Mud Logging Unit Captain. The Unit captain is the senior mud logging engineer on the location. He has primary responsibility for the maintenance, management and provision of service by the logging unit, its equipment and personnel to the client. Mud Logger. He is responsible for the maintenance and correct operation of the equipment. He is responsible for the collation and presentation of the information monitored in accordance with company standard procedures and customer requirements to ensure a high quality service.

The Mud Logging Theory & Lag Calculations The mud logging theory is based on the mud cycle principal. The mud is sucked from the pits (Active Pit) and pumped via the drilling string down to the hole bottom. The mud is then bumped against gravity through the annulus up to the shakers. The time necessary to get the drilled samples to the surface is exactly the time required to pump the mud volume through this passage. This is calculated and is known as Lag time or lag strokes The hydrostatic level drops enough to decrease the hydrostatic head of the mud to a point where the formation pressure exceeds the mud hydrostatic pressure.

Lag Lag Deinitions: Lag time is the time the mud takes to travel inside the hole between two specified depth points. The time taken between the surface to the bottom of the hole is called ”lag down“or“Lag in”. The time taken between the bottom of the hole to the surface is called ”lag-up“ or “bottoms’up”. The surface to surface time is called “Complete cycle” or In/Out time.

Gallons (gal) = Barrels Î 42 Lag Lag Equations: Converting Barrels  Gallons: Gallons (gal) = Barrels Î 42 Converting Gallons  Barrels: Barrels (bbl) = Gallons ¸ 42 Calculating Pipe Volume:

C. Calculating Annular volume D. Calculating Lag in Strks

Lag Equations Calculating lag in minutes:

Lag Equations Converting Meter  Foot: Feet (ft) = Meter x 3.281 Converting Cu. in  Barrels: Barrel (bbl) =9702 cu. in Converting g/cc  ppg: ppg = g/cc x 8.33

Lag Equations Lag Correction: The number of strokes from the surface to the bit inside the pipe. The total number of strokes from starting up the pump until the gas arrives at the surface. Subtract 1 from 2 The resulting number of strokes is the actual lag time. From this it is possible to estimate the amount of washout in the hole.