Summary of the meeting T. Higo This meeting was originally born as a collaboration meeting among three laboratories, CERN, SLAC and KEK, but the attendee.

Slides:



Advertisements
Similar presentations
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Advertisements

CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
Managed by UT-Battelle for the Department of Energy Open XAL Open Development of the XAL Accelerator Application Framework Christopher K. Allen Tom Pelaia.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
日米協力 US/Japan cooperation Research of High Gradient Acceleration Technology for Future Accelerators progress report New proposal 7.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
040220LCPAC 2004 Structure (T. Higo)1 X-band accelerator Structure LCPAC Feb. 20, 2004 T. Higo KEK.
Statistical analysis of RF conditioning and breakdowns Jorge GINER NAVARRO CLIC Workshop /01/2015 J. Giner Navarro - CLIC WS20151.
ICFA Report to Lepton-Photon 2015 July 2014 to August 2015 J. Mnich (DESY) August 21, 2015.
Fabrication of accelerator structures for CLIC study CLIC Workshop Oct , CERN T. Higo, KEK.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Yasser El-Wazir, MBBCh, PhD Director of quality Center, SCU Professor of Physiology Faculty of Medicine, Suez Canal University.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
EuCARD is co-funded by the European Commission within the Framework Programme 7 under Grant Agreement no Reach of NC and SC Technologies, 50 …
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
X-Band: test stand and structure program
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Recent High-gradient test result at KEK Linear Collider Workshop 2012 Arlington, Texas (WebEx) 25 October, 2012 Toshi Higo and X-band group of KEK.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
J.P.Delahaye Introduction to the X Band Workshop X Band Accelerating Structure Design and Test Program Workshop WELCOME CIEMAT/Spain, CEA SACLAY/France,
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
Atsuto Suzuki (KEK), Chair ICFA Report from ICFA ICFA mission and membershipICFA PanelICFA Activity.
44th ICFA Workshop under the sponsorship of the ICFA BD Panel, Cockcroft Inst., 1-4 Dec 2008 Welcome and Introduction to the Workshop Roger M. Jones Cockcroft.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
Report to C-II Committee on 32 nd International Conference on High Energy Physics HeSheng Chen Inst. of High Energy Physics, Beijing.
Nextef results CLIC09, Oct T. Higo (KEK). Contents Quadrant high gradient test status – Initial processing and power limit – VAC characteristics.
Global Design Effort September 20-22, 2006 MAC Review R&D Programme (Tools) Eckhard Elsen GDE DESY.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
W. Wuensch CLIC project meeting High-power rf structure testing.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Title 2 nd X-band Accelerator Structure Design and Test-Program Collaboration Meeting Discussion with WebEx on March 17 between CERN and KEK W. Wuensch,
Nextef results & status International Workshop on Breakdown Science and High Gradient Technology KEK, Japan 18 April 2012 Toshi Higo.
CLIC/CTF3 collaboration Board J.P.Delahaye 1 CERN, October 2007 CLIC Workshop 07 CLIC'07 provides a forum to review all aspects related.
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
Organizational Issues Coordinators: Ralph Assmann (CERN/EuCARD) Jens Osterhoff (U. Hamburg/DESY) Henri Videau (ecole Polytechnique) Scientific secretary:
US Accelerator Industry- Small Business Perspective April 30,2013 US-Japan Advance Science and Technology Symposium Science Projects Homeland Security.
Welcome to The 2 nd Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 13-15, 2008 Seminar Hall in 4 th Build. Announcement.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
The European Strategy for Particle Physics
Effort to identify the critical issues for high gradient
CTF3 Collaboration Technical Meeting January 2008
(Muon Ionization Cooling Experiment)
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Summary of WG4 Normal Conducting RF
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Asian Cooperation in KEK
Introduction to HEPiX Helge Meinhard, CERN-IT
Michael Bieler, Chair of the IPC Petra Schütt, Chair of the LOC
Participatory way of life in cohousing communities:
EFFRiN European Fluvial Flood Risk Network Origin:
The 13th International Workshop on Accelerator Alignment (IWAA 2014) Institute of High Energy Physics (IHEP), Chinese Academy of Sciences October
SLAC National Accelerator Laboratory ROB A/B room (Bldg. 48)
5th X-Band Structure Collaboration Meeting
Presentation transcript:

Summary of the meeting T. Higo This meeting was originally born as a collaboration meeting among three laboratories, CERN, SLAC and KEK, but the attendee this time came from more wider area, institutes in France, UK, Finland and many companies from Europe and Japan. This is a very useful occasion for the extensive discussions made among three continents, Europe, Asia and America. Extension of this meeting in practical issues are to be made in such conference as WebEx, which was already established between among three laboratories, SLAC, CERN and KEK. Wider people are welcome to be involved. Next meeting was discussed to be held at US or at UK in May next year.

There were two goals in the meeting as for high gradient. One is to obtain a way to show a feasible gradient for actual accelerator such as CLIC. Another is to extend the basic study toward ultimate gradient and to understand the physics behind. There were active discussions along these two directions. One of the typical outcome of the collaboration is shown in an excellent result on high gradient performance of the structure, CLIC_VG1, designed by CERN, made by KEK, bonded and baked by SLAC. It made us foresee the operation of 100MV/m range in a practical operation. The importance of the cross checking of the results among different places are discussed and actually it is being performed. We discussed that the testing with stand-alone power device is needed even for CLIC research. We understand the collaboration in this area is also very crucial for the further advance.

KEK is on the way to establish the high power in its X-band high power facility, Nextef. The discussions in the meeting and during the tour provide KEK with very useful input for establishing the facility. Collaboration with not only the exchange of information but also mutual help in such as exchange of high power components is very beneficial among each other. KEK thinks this sort of meeting very effective for pushing its management layer to support the X-band activity of KEK. We hope to see you in the next meeting with any progress in results and understandings of the X-band accelerator structure in its design for LC and its high gradient performance. Thank you for valuable discussions, Toshi Higo