Ch 6-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating.

Slides:



Advertisements
Similar presentations
Determining How Costs Behave
Advertisements

Chapter 6 Sampling and Sampling Distributions
Regression Analysis Module 3. Regression Regression is the attempt to explain the variation in a dependent variable using the variation in independent.
Propagation of Error Ch En 475 Unit Operations. Quantifying variables (i.e. answering a question with a number) 1. Directly measure the variable. - referred.
Chapter 4 Discrete Random Variables and Probability Distributions
Chapter 10 Simple Regression.
Chapter 12 Multiple Regression
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 5-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ PERTEMUAN 14.
Chapter 13 Forecasting.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Determining How Costs Behave Chapter 10 2/07/05.
Lecture 10 Comparison and Evaluation of Alternative System Designs.
Chapter 5 Continuous Random Variables and Probability Distributions
Chapter 7 Estimation: Single Population
15-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Forecasting Chapter 15.
Slide Copyright © 2010 Pearson Education, Inc. Active Learning Lecture Slides For use with Classroom Response Systems Business Statistics First Edition.
1 Chapter 17: Introduction to Regression. 2 Introduction to Linear Regression The Pearson correlation measures the degree to which a set of data points.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Statistics for Business and Economics 8 th Edition Chapter 6 Sampling and Sampling.
Determining How Costs Behave
Forecasting Chapter 15.
Statistical Methods For Engineers ChE 477 (UO Lab) Larry Baxter & Stan Harding Brigham Young University.
Chapter 11 Simple Regression
3 CHAPTER Cost Behavior 3-1.
LINEAR REGRESSION Introduction Section 0 Lecture 1 Slide 1 Lecture 5 Slide 1 INTRODUCTION TO Modern Physics PHYX 2710 Fall 2004 Intermediate 3870 Fall.
Statistics for Business and Economics 8 th Edition Chapter 11 Simple Regression Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Ch.
Chapter 7 Estimation: Single Population
©2010 Prentice Hall Business Publishing, Auditing 13/e, Arens//Elder/Beasley Audit Sampling for Tests of Details of Balances Chapter 17.
Chapter 15 Correlation and Regression
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
BPS - 3rd Ed. Chapter 211 Inference for Regression.
Copyright © 2003 Pearson Education Canada Inc. Slide Chapter 10 Determining How Costs Behave.
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Slide
© 2014 by Pearson Higher Education, Inc Upper Saddle River, New Jersey All Rights Reserved HLTH 300 Biostatistics for Public Health Practice, Raul.
Ch 3-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
From Theory to Practice: Inference about a Population Mean, Two Sample T Tests, Inference about a Population Proportion Chapters etc.
Ch 1-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Decision making Under Risk & Uncertainty. PAWAN MADUSHANKA MADUSHAN WIJEMANNA.
Ch 9-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
1 Chapter 7 Sampling Distributions. 2 Chapter Outline  Selecting A Sample  Point Estimation  Introduction to Sampling Distributions  Sampling Distribution.
Forecasting Chapter 9. Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Define Forecast.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
15-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Forecasting Chapter 15.
Chapter 4 Introduction This chapter will discuss the concept of risk and how it is measured. Furthermore, this chapter will discuss: Risk aversion Mean.
Propagation of Error Ch En 475 Unit Operations. Quantifying variables (i.e. answering a question with a number) 1. Directly measure the variable. - referred.
Aron, Aron, & Coups, Statistics for the Behavioral and Social Sciences: A Brief Course (3e), © 2005 Prentice Hall Chapter 12 Making Sense of Advanced Statistical.
Statistics Presentation Ch En 475 Unit Operations.
QM Spring 2002 Business Statistics Probability Distributions.
Chapter 4: Variability. Variability Provides a quantitative measure of the degree to which scores in a distribution are spread out or clustered together.
Ch 5-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Ch 2-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
15-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Forecasting Chapter 15.
Ch 10-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating.
Statistics for Business and Economics 8 th Edition Chapter 7 Estimation: Single Population Copyright © 2013 Pearson Education, Inc. Publishing as Prentice.
LESSON 6: REGRESSION 2/21/12 EDUC 502: Introduction to Statistics.
Statistics Presentation Ch En 475 Unit Operations.
Chapter 11 – Introduction to Risk Analysis u Why do individuals, companies, and stockholders take risks?
Statistics for Business and Economics 7 th Edition Chapter 7 Estimation: Single Population Copyright © 2010 Pearson Education, Inc. Publishing as Prentice.
Chapter 19 Monte Carlo Valuation. © 2013 Pearson Education, Inc., publishing as Prentice Hall. All rights reserved.19-2 Monte Carlo Valuation Simulation.
Cost Estimation & Cost Behaviour
Regression Analysis Module 3.
Determining How Costs Behave
Analysis of algorithms
Chapter 11 Simple Regression
Estimating with PROBE II
Statistics Review ChE 477 Winter 2018 Dr. Harding.
Forecasting Chapter 15.
Additional notes on random variables
Additional notes on random variables
Analysis of algorithms
Presentation transcript:

Ch 6-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Cost Analysis and Estimating for Engineering and Management Chapter 6 Estimating Methods

Ch 6-2 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Overview l Introduction l “Non-Analytic” Estimating Methods l Cost & Time Estimating Relationships l Learning Curves l Proportional Relationships l Using Probability and Statistics

Ch 6-3 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management General Estimating Methods l Preliminary Estimates  Limited Information and Time  Compare Alternatives  Decisions (Proceed or Discontinue) l Detailed Estimates  More Quantitative (Solid Information)  Used for Pricing

Ch 6-4 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Other Estimates l Broad Tolerance on Accuracy  ROM  NTE l Effort to Estimate Proportional to Use and Information Available l Estimates Attempt to Forecast Actual Costs

Ch 6-5 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Universal Methods l Opinion  Uses Experience and Judgment l Conference  Collective Opinion l Comparison l Unit

Ch 6-6 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Comparison Method l Bracket Unknown with Known  Known Cost of Similar Product/Project  Find Cost for Upper Bound  Cost for a Lower Bound Is Good, too Eq 6.2

Ch 6-7 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Comparison Example

Ch 6-8 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Unit Method l Identify a Cost Driver l Use Historical Data l Find “Cost per…”  Square ft., pound, kW, hp, etc. l Average Cost l Dependent on Quality of Model

Ch 6-9 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Estimating Relationships l Cost (CER) or Time (TER) l Math Models or Graphs l Function of One or More Independent Variables - Causality l CERs are Considered Preliminary l Best if Used Within Data Range

Ch 6-10 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Performance Time Data l Extends Time Study Standards  Standard Time Good Only for Operation(s) Studied  Not Suitable Directly for Estimating l Use Algorithm to Develop Time Study Data into PTD

Ch 6-11 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management PTD Algorithm l Collect Data l Classify Data into Common Groups l Use Regression l Separate into Constant and Variable l Set Variable into Equation or Table l Complete, Test, Publish, Implement

Ch 6-12 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Data l Many (12 or so) Studies l Process and Arrange Data  Regression Analysis l Determine Variable Elements

Ch 6-13 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Variable Element Test 1 l Is the Element Variable? Establish a Limit - P 1 (%) Check at Extremes of Range ( x ) Use Computed y Values l “Conditionally” Variable if: ^ Eq 6.4

Ch 6-14 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Variable Element Test 2 l Is the Variability of the Element Significant to the Overall Cost? Establish Another Limit P 2 (%) l Exceeds Both Test 1 & 2 = Variable Eq 6.5

Ch 6-15 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Process the Data l Collect and Add All Constant Elements l Provide Equations or Tables for Each Variable Element l Use Rules for Setting Table Divisions l Include PF&D

Ch 6-16 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Example l Independent Values P 1 = 100% and = P 2 10% Elementx min x ave x max

Ch 6-17 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Regression Data Element Regression Equation x x x x x 5

Ch 6-18 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Calculated Values Element

Ch 6-19 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Test Results Element Test 1 OutcomeTest 2Outcome 1212 Variable 9Constant 2960 Variable 12Constant 3396Variable18Variable 42995Variable49Variable 540Constant 

Ch 6-20 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Constant Elements ElementsNormal Time, Min Total STD Min. with PF&D0.872

Ch 6-21 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Estimating Database Set Up 1.2 hr Constant0.87 min Load 3 rd Part L + W + H Time (min) No. SpotsTime (min)

Ch 6-22 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Using the TER Database l Select Set-Up Time l Get Constant Unit Time Determine Value of Independent x l Get Time Value from Equation or Table If x Is Between Table Values  Use Higher Value

Ch 6-23 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Learning l Repetition Improves Performance  Design Improvements  Process Improvements  Operator Efficiency Improvement l Improvement Is Predictable l Improvement Generally Decreases Exponentially

Ch 6-24 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management The Learning Theory l Time/Cost Decreases by a Constant % l Each Time the Quantity Doubles l Finding the “Slope” Element Eq 6.6 Eq 6.7 Eq 6.8 Eq 6.9

Ch 6-25 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management The Learning Curve

Ch 6-26 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Logarithmic Function

Ch 6-27 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Expanding Cumulative Time for N units Average Time per Unit for N units Eq 6.10 Eq 6.12 Eq 6.11

Ch 6-28 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management More Learning Curve Notes Eq 6.12 Works for N > 20 l Finding s from Known Times l Limitations  Not for Small Items or High Production Jobs Eq 6.13

Ch 6-29 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Project Estimating l Power Law and Sizing l Economies of Scale  Correlating Exponent m Eq 6.14 Eq 6.15 Eq 6.16

Ch 6-30 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Other CERs l Caution, Keep Scale within Factor of 5 l Variable and Fixed Components l Multi-Variable Eq 6.17 Eq 6.18 Eq 6.19

Ch 6-31 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Factor Method l Mostly for Major Projects l Summary Model l Uses Separate Factors l Includes Cost Index Eq 6.20 Eq 6.21

Ch 6-32 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Using Probability and Statistics l Expected Value l Range l Percentile l Monte Carlo Simulation

Ch 6-33 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Expected Value l Elements of Uncertainty Assigned Probabilities l Certain Events (NO Other Possibilities) l Mutually Exclusive Events l Probabilities Indicate the Future l Expected Value Eq 6.22

Ch 6-34 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Range l Most Likely Value l Optimistic and Pessimistic Estimates l Expected Cost and Variance Eq 6.23 Eq 6.24

Ch 6-35 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management More on Range l Central Limit Theorem  Mean of the Sum = Sum of Means  Variance = Sum of Variances l Probability Actual Cost Will Exceed Upper Limit Eq 6.27

Ch 6-36 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Percentile l Three Costs  Best Case 10% (1 in 10 Cost Is Lower)  Best Value 50%  Worst Case 90% (1 in 10 Cost Is Higher) l Find the 3 Estimates l Express (10% and 90%) as Differences from 50%

Ch 6-37 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Example Item Percentile Difference 10 th 50 th 90 th (50 – 10)(90 – 50) 1$25$33$44$8$

Ch 6-38 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Square and Sum l Square Root of Sum = Contribution to Uncertainty (50 – 10) 2 Midvalue (90 – 50) 2 $64$33$ Total Square root$9 $11.58

Ch 6-39 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Final Result l 50th Percentile = $50 l 10th Percentile = $41 l 90th Percentile = $61.58

Ch 6-40 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Monte Carlo Simulation l Mathematical Models l Repeatedly Run Using Random Input for Variables l Based on Expected Probabilities l Many Runs (1000s) Gives Cost Distribution

Ch 6-41 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Single Value vs Distribution l Compare A and B l Single Values - Choice is Obvious l Distribution - Choices May Overlap

Ch 6-42 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management A and B with Distributions

Ch 6-43 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Summary l How to Use Non-Analytic Methods l About CERs and TERs l Effects of Learning on Estimating l Various Ways of Using Proportionality l Impact and Uses of Probability and Statistics for Estimates