REFCONS CASE AT WASTE INCINERATION PLANT Country:Denmark Plant name:AffaldPlus, Næstved Boiler Type:Steam Power Capacity:- Main equipment supplier:Babcock.

Slides:



Advertisements
Similar presentations
Repair Procedure for Heat Exchanger Coil. Repair Procedure Items to Prepare: –Repair kit provided by SK METAL – Filler Metal + SKA CP-70 Flux –Heat shields.
Advertisements

ACTIVE LEARNING PROCESS
Schmidt & Danielsen a/s –Establised in 1964 mainly as a service company in the refractory business without technical support. –In 1985 Søren Danielsen.
VORTEX FINDERS (DIP TUBES, IMMERSION TUBES)
ACTIVE LEARNING PROCESS
Preventing Equipment Failures
Power Plant Engineering
Control calculations Heat Engines & Boilers.
HVAC523 Heat Sources.
Injection Molding Dr.Apiwat Muttamara.
Training Presentation
Boilers Dept. of Mech & Mfg. Engg..
ADX 150 – Engine Repair ADX 170 – Climate Controls
Click on this image to open the full PDF document.
BUNSEN BURNER BASICS. General Information Bunsen burners are used to provide a safe heat source during many laboratory experiments. Before using a Bunsen.
5 critical areas in Cement plants
Electrical Repair Soldering and Crimping By Fernando Martinez And Rudy.
 All matter is made of _________________ that are always _________________.  Particles are all ___________________ › Solid: _______________________________.
Applying Understanding: Conduction and Convection
Evaporation & Condensation Noadswood Science, 2011.
Steam Boilers UNIT-VI.
AIR DISTRIBUTION & LOCALIZED EXHAUST INTRODUCTION AIR DISTRIBUTION LOCALIZED EXHAUST SAMPLE QUESTIONS.
Coal Burning System.
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Pp Plants get energy for photosynthesis from sunlight. Animals get energy from food, including plants. Over time plant and animal remains changed.
Boiler Tubes.
Storage and Distribution Radiant heating uses a series of tubes to distribute heated water throughout the main hut and cabins. However, the boiler isn't.
 On average, home heating uses more energy than any other system in a home  About 45% of total energy use  More than half of homes use natural gas.
Objective The student will be able to: solve inequalities using multiplication and division.
Introduction of jet engine
Best Practices in HVAC Design/Retrofit
INTRODUCTION Definition:
The WW 90°C Project of Biochemie Kundl, Tirol, Austria.
TAKS PREP. If an animal has to depend on another animal for its housing and east the other animal, what happens to its population when there isn’t many.
HYDRO POWER PLANT
ALTERNATIVE and RENEWABLE ENERGY n CO-GENERATION n WIND ENERGY n GEOTHERMAL ENERGY n SOLAR ENERGY n CONSERVATION.
Estimation of the heat evolution during the hydration of concrete, mix design of hot concrete, drying and coating of concrete structures Exercise 6.
 On average, home heating uses more energy than any other system in a home  About 45% of total energy use  More than half of homes use natural gas.
Nuclear Thermal Hydraulic System Experiment
Air Movement and Natural Ventilation
Earth: From Core to Crust Chapter 2. Reading the Geologic Record The difference between geologist and historians is that historians think of history over.
WEATHER Watching BY: Joshua Shoderu Class:709. Problem Question Can I predict the weather based on the weather temperatures recently?
STEAM POWER PLANTS.
What is a Cryocar? It is a liquid nitrogen powered vehicle. Propulsion systems are cryogenic heat engines in which a cryogenic substance is used as a.
 “High fire” glazes are fired in the large brick kiln to a temperature of 2380° Fahrenheit.  It takes about 24 hours to reach that temperature.
Allister James – November 19, 2015
“The atomic bomb made the prospect of future war unendurable. It has led us up those last few steps to the mountain pass; and beyond there is a different.
CASE STUDY - BURNER PIPE AT CUSTOMER IN INDIA COMPANY OVERVIEW : The customer is a 50 years old well known Cement producer of South India. 5 advanced production.
Presentation of HASLE Refractories A/S Ceramic Diptube Case Story at a plant in Thailand
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Science 7 – Unit C: Heat and Temperature Topic 5: The Particle Model and Changes of State.
Using Heat Part 2. Science Journal Entry 32 Explain the advantages and disadvantages of thermal expansion.
Refrigerant system of Inverter R-410A. denki.co.th Model type Model : Stand Model : Duct Model : Cassette Model : Wall mount Model : Wall and.
Forming techniques – blow moulding The process is similar to injection moulding and extrusion. 1. The plastic is fed in granular form into a 'hopper' that.
Maria’s Restaurant Chapter 2 Section 7
DETERMINING PROCEDURE AND PRICE REPAIR
Sources of Energy pp
BUILDING HEATING AND COOLING
Always with appliances V= 230V
Bell work Predict whether leaving the refrigerator door open on a hot summer day will help to cool the kitchen.
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
Mandatory Design Requirements
Circuits Current and Resistance
Thermal behavior of the LHCb PS VFE Board
Maria’s Restaurant Chapter 2 Section 7
Mechanical Properties of Metals - I
Sources of Energy pp
Presentation transcript:

REFCONS CASE AT WASTE INCINERATION PLANT Country:Denmark Plant name:AffaldPlus, Næstved Boiler Type:Steam Power Capacity:- Main equipment supplier:Babcock & Wilcox Vølund ApS Number of boilers:2 Main Fuel:Waste.

REFCONS CASE AT THE WASTE INCINERATIONS PLANT AffaldPlus History: The Waste incinerator lines no. 2 and no. 3 were build by Vølund back in the 1994 as a furnace with 3 grates and a system of pre-casted plates with holes for cooling of the sidewall, the primary air inlet comes through the grates and the secondary air inlet came through tubes in the sidewalls. See drawing

Furnace as it was build in 1994

REFCONS CASE AT THE WASTE INCINERATIONS PLANT AffaldPlus History: The furnaces were upgraded in November 2009 by Vølund. As it is done in many furnaces in Denmark the wear zones above the grates were replaced with cooled tube wall in the burning zone. At the same time the secondary air inlet were moved from the sidewalls to the ceiling and the pre-casted plates were removed. Still the primary air inlet comes through the grates. The sidewalls above the new cooled wear zone still remain with a 520 mm thickness. See drawing B and B.

Upgraded furnace build in 2009

Construction of side wall to boiler, buttom 1st. pass.

REFCONS CASE AT THE WASTE INCINERATIONS PLANT AffaldPlus Problem: After the upgrade of the furnaces in 2009, the new secondary air inlet through the ceiling, consists of 2 tubes that guide the air in the wanted direction, the air blows at a speed of m/sec. The construction generates very high temperature, I don’t have an exact measurement from the area, but the clinker is flowing down the wall and my guess would be a temperature about °C. The walls were renewed and casted in Hasles D65TA back in the summer 2010, at the same time the tubes in the ceiling were redirected by Vølund, but after 9 months of operation the walls were very damaged and needed a quick temporary repair with gunning mass – just to operate 1 more month before the summer stop. See Photo sheet 1, 2, 3 and 4.

Photo sheet 1: Upper left wall before and after 9 months operation

Photo sheet 2: Mid left wall before and after 9 months operation. The damaged area is in line of the secondary air inlet direction.

Photo sheet 3: Mid left wall before and after 9 months operation. The damaged area is in line of the secondary air inlet direction.

Photo sheet 4: Mid right wall before and after 9 months operation. The damaged area is in line of the secondary air inlet direction.

REFCONS CASE AT THE WASTE INCINERATIONS PLANT AffaldPlus Problem: This summer 2011, Refcon renewed the walls again, casted in D65TA and Vølund has done some changes in the air inlet speed. There was an inspection after 6 weeks of operation, and it still seems that there is very high temperature in the area – and I fear that the walls will need to be renewed again next summer. The same problem is seen on other waste incineration plants in Denmark, the solution has so far been casting in the D65TA, which has given the best resistance to the flowing clinker problem, but clearly for Refcon and AffaldPlus a lifetime of 9 months isn’t good enough. See Photo sheet 5, 6 and 7.

Photo sheet 5: Mid left wall renewed this summer 2011 and after 6 weeks operation.

Photo sheet 6: Mid right wall renewed this summer 2011 and after 6 weeks operation.

Photo sheet 7: Mid right wall renewed this summer 2011 and chicane wall after 6 weeks operation.

REFCONS CASE AT THE WASTE INCINERATIONS PLANT AffaldPlus Refcons wishes for this case: It would be nice if Vølund would build a furnace that causes lower temperature in the furnace room. I can have my doubt if that is a realistic wish as Vølund already have done some changes to the secondary air inlet – but clearly we still have a very high temperature. It is the believe of Vølund that the problem comes from the diffusion of flowing clinker into the casted wall, that cause the wall to kind of “melt” away at lower temperature than the mass would without the pollution of clinker. And it would be nice if Hasle would design a mass that better can resist flowing clinker at high temperature.