Engineering Operations OH water leak: Water leak is located ~ 4.5” into the upper OH lead. Leak 2 o’clock Cooling hole 0.188 in. dia.

Slides:



Advertisements
Similar presentations
Installation. Indoor Unit Installation Typical Installation.
Advertisements

Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
1 ASSEMBLY NOTES 1.Specifications Build according to IPC 6012 class 2 Standards 2.THIS DEVICE IS SUSEPTABLE TO DAMAGE BY ESD – Use appropriate ESD precautions.
Engineering Operations Outage Status: Post-run diagnostic calibrations have been completed and in-vessel work can start on PCHERS, FIDA, MPTS, and the.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
© 2012 Delmar, Cengage Learning Cooling System Service Chapter 21.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
A 2 element 6 Meter Quad Made from PVC pipe and capable
Department of Energy Energy Savers PowerPoint: Save Energy and Money Today 1 of 12.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
NSTX Center Stack Upgrade Workshop Brainstorming on Design Solutions for TF Joint C Neumeyer Jan 22, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
NSTX Upgrade Testing TF Coil Flexible Connector Prototype In-Plane Deflection Test
Office of Aviation Safety Bob Swaim Airworthiness ABX Air Ground Fire.
NCSX NCSX Planar Coil "ASIPP" Presentation 1 December 8-10, 2005 Michael Kalish NCSX TF and PF Coils.
Bearings -Disassembly &Assembly Nizwa College of Technology.
1 Alan Bross MUTAC April 9, 2008 Lithium Hydride Absorber Program A. Bross for C. M. Lei.
Installation. Indoor Unit Installation Typical Installation.
Cooling Systems Purpose: to keep the engine at it’s most efficient operating temperature TOO HOT! TOO COLD! - poor lubrication - excessive heat - seizing.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus February 24, 2010 PF3 Dome Bracket 1/8 inch Weld Stress PF4,5 Stress with 6 Support.
Modular Coil Electrical Joint1 NCSX Peer Review Modular Coil Electrical Joint James Chrzanowski April 24, 2006.
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
TRENTON Casing Filler Presentation
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Engineering Operations FY08 Outage: In-Vessel Work: –BSE Vacuum Vessel Interfaces Completed –Liquid Lithium Divertor Tray trial fit-ups –HHFW Antennas.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
Home Energy Saving Tips Save Money While You Help The Environment.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
Lithium Hydride Absorber Program Update Alan Bross.
Model 12 Intek Horizontal OHV
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
Engineering Operations Outage Schedule Center Stack casing is scheduled to go back in the vessel today Complete NB armor, Diagnostic calibrations, clean/photo/close,
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
FY10 Ops Preparations: Extended vessel bake (to 3 weeks) Additional Physics Operators Spare LITER probes/fill systems fabricated & new staff Run day status/plans.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Cooling Loop Update ATLAS W4 Sheffield Richard French The University of Sheffield + all UK contributors.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
NSTX Team Meeting August 9, 2011 NSTX TF Update Team Meeting August 9, 2011 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
TF Joint Testing Data Acquisition Special Test Equipment Hans Schneider with Robert Marsala (609) Engineering Operations April.
NSTX TF Flag Joint Design Review OVERVIEW C Neumeyer 8/7/3.
Applied Metallurgy EBB440 MECHANICAL ASSEMBLY Prepared by : AAS.
Temperature Test Allows monitoring of temperature changes.
Stator Plan & Schedule Chris Booth 2nd March 2009
Projects Status Report
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
Effect of Using 2 TE units on Same Heat Sink
Auto Upkeep Basic Car Care, Maintenance, and Repair (2nd Edition)
TRENTON Casing Filler Presentation
Insulators and Conductors
Characterization Update
Presentation transcript:

Engineering Operations OH water leak: Water leak is located ~ 4.5” into the upper OH lead. Leak 2 o’clock Cooling hole in. dia.

Engineering Operations OH water leak: Leak first seen between conductor & Insulation

Engineering Operations OH water leak repair preparation: The upper TF hub disassembled to provide access. Repair Area

Engineering Operations OH water leak repair options: The mechanical and leak repairs will be addressed separately. A pin-hole leak can be repaired with a leak sealer. For a crack, the cooling hole will be reamed to a larger diameter to accommodate a cooling sleeve. An O-ring at the end of the sleeve will be compressed at the end of the reamed hole ” 0.394” OH Conductor

Engineering Operations OH stress crack repair (IF REQUIRED): A copper bridge secured to the conductor and lead block using either clamping or a TIG-braze. Stitch TIG- Braze 1/8 “ fillets around support block to lead block TIG- Braze 1/8 “ fillets around support block to conductor Copper support block fits snuggly around conductor and attaches to lead block OH Center

Engineering Operations OH Lead mechanical support: A G-10 block added to support vertical and twisting loads.

Engineering Operations Insulation repair: Epoxy/glass ground wrap around both conductors Turn insulation on lower conductor untouched Kapton insulation added to repaired conductor G-10 spacer between conductors

Engineering Operations Post repair monitoring: Sight tubes added to allow periodic (daily?) inspections w/boroscope. Leads can be brought out to electrically monitor the resistance of the conductor or the flex link A leak divertor with an electronic water monitor is possible.

Engineering Operations LLD Heating: A “house air” heater to heat the 4th LLD plate has been assembled in the VPL and tested to 12CFM at 300C.

Engineering Operations Updated FY10 Schedule: NSTX has completed 2 weeks of the planned 15 week run. We expect to resume operations on May 24th, but could be ready a week earlier based on the scope of the repair. Assuming a maintenance week each month, NSTX will need to run into September this year. Need to determine the scope of the upcoming outage. A timely start to the FY11 run is needed to support an aggressive NSTX upgrade schedule.