FUI Stakeholder Group 3rd December 2008 Congestion Management project.

Slides:



Advertisements
Similar presentations
THE EXPERIENCE OF E-PROCUREMENT IN LITHUANIA Rasa Noreikienė Vice-Minister of Economy of the Republic of Lithuania 1.
Advertisements

Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Update on Coordination of long term auctions in the FUI region FUI IG, London, 13 th September.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
Education | Elections | Census Procurement Process for Electoral Equipment Considerations, Timescales, Case Studies.
A case of Armenia: Legal framework for E-procurement in Public Procurement Sector Mr Karen Brutyan, PhD, PFM and PP EBRD Consultant, Wolf Theiss 1-2 December.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Menu of options. Interim Process – ‘September 2007’ oLT nomination of bands of capacity early in D-1 (‘LT’ gate-closure) oUIOSI to resell non-nominated.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Erik Rakhou - Energiekamer 19th Madrid Forum 22 March 2011 Amendment of the Guidelines of Good Practice for Storage System Operators - Capacity allocation.
Exploiting the CRM for B2B Marketing Karen Race Deputy Director, Academic Enterprise.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
6 June 2005Community Sector Funding Policy building our city building our community ACT Government Lee-Anne Aldwell Manager ACT Government Procurement.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Click to add title SABS STANDARDS DIVISION Standards Development Natural Science.
France-UK-Ireland (FUI) Region 5th Stakeholder Group (SG) 26 th November 2007, London Interconnector Operator (ICO) Update Simon McVeigh (NGIL) Jean-Gabriel.
Theresa Ryan Department of Finance Ireland Procurement Management Reform in Ireland EU Learning Lab 4 July 2005.
FUI Stakeholder Group 4 th July 2008 Congestion Management.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG December 2008 John Prime - Claude Perret.
Electronic duty of care Phil De Caux: Partnerships manager WFAA workshop - May 2012.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
Report from balancing workshop Lesley Queripel 1 February 2007.
Achievements and next steps in the Central-South Region Central-South Region 3rd SG meeting Milan, November 16 th 2010.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
Long-Term Congestion Rights (LTCR) Weekly Testing Call January 5, Project Pinnacle.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 Approved Terms of Reference for HAPUA Working Group No.5-ESI Services Project 6 Bilateral Contract Benchmarking.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
East West Interconnector Access Rules 11 th March 2011.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
European Developments Transmission Workgroup 3 rd May 2012.
FUI Stakeholder Meeting BritNed presentation Jan-Paul Dijckmans & Jonathan Maughan 4 November 2009.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
FUI Stakeholder Group 4 th November 2009 Congestion Management.
© 2007 Open Grid Forum Authentication Service Profile Christos Kanellopoulos 14 th EUGridPMA, Lisbon, PT October 7 th, 2008.
Roland Gilbert BSc MRICS; Prince 2 Practitioner
CRE Public Consultation on new exempt interconnectors
SWE Day- Ahead market coupling
Moyle & East West Access Rules Approval
INTERCONNECTION GUIDELINES
Long-Term Auctions & Capacity FUI Coordination Proposals
POC Procedures Working Group (POC-pWG)
EUROPEAN ENERGY MARKET SUMMIT 30 January 2007
Regulators’ update on Congestion Management and Balancing
SG meeting FR/UK/IR region 14 June 2007 Congestion management
Update on European Network Codes
Manish Bhattarai, Director Public Procurement Monitoring Office (PPMO)
Strategic Coordination Group
MTENDER DIGITAL PROCUREMENT - MOLDOVA
Outputs Estimated Tendering Process Timeline (16 – 31 weeks)
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

FUI Stakeholder Group 3rd December 2008 Congestion Management project

Recap National Grid and RTE are progressing the Capacity Management System project to achieve CM Guidelines compliance. Slides presented on 4 July 08 are available at: –

Progress Since 4 July SG we have: 31/7- contract awarded for CMS supplier 7/8- tender launched for Hosting / Managed service 3/10- conducted User & Regulator consultation on commercial aspects 14/10- consultation results shared with Regulators 30/10- provided IFA Users with a summary of certain Access Rules principles 30/11- software design stage completed

CMS Project scope CMS will handle all IFA commercial aspects, including auctions, credit management, nominations across all timescales LT, D-1, Intraday. In addition, CMS project requires National Grid / RTE to modify various internal processes, eg: –IS interfaces: Control Room IS interfaces Market operator interfaces (eg Elexon, RTE) Back office systems ETSO Vista –Documentation: IFA Access Rules Operational procedures SLAs –Processes Control room functions Back office process (credit management / invoicing).

Next Steps in 2009 Jan- award contract for Hosting & Managed service Jan-Feb- consult IFA Users on draft Access Rules Feb- Factory Acceptance Tests (FAT) Apr-May- Site / User Acceptance Tests (SAT / UAT) May- publish IFA Access Rules June- Availability Testing & User Training July- Go Live