CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.

Slides:



Advertisements
Similar presentations
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Advertisements

SIMPLIFIED MODELS OF ILD AND SID DETECTORS: SIMULATIONS AND SCALED TEST ULB: Christophe Collette, David Tschilumba, Lionel SLAC: Marco.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Final Doublet Stability and in-detector Interferometry MONALISA David Urner Oxford University.
Pre-isolator Update 18 th MDI Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist December 17, 2010.
Simulations and measurements of the pre-isolator test set-up WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist November 9, 2010.
Stabilization of the FF quads A.Jeremie B.Bolzon, L.Brunetti, G.Deleglise, N.Geffroy A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Update of the ground motion generator of A. Seryi for ATF2 thanks to ground motion measurements in the ATF2 beam line 1 Benoît BOLZONATF2 software task.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
CLIC MDI Working Group QD0 external reference structure A. Gaddi, H. Gerwig, H. Hervé, N. Siegrist, F. Ramos.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Review of Ground Motion Measurement Program of DESY in Various Sites R. Amirikas, A. Bertolini, W. Bialowons LHC tunnel, CERN HERA tunnel, DESY Ground.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Orbit feedback design for the CLIC ML and BDS Orbit feedback design for the CLIC ML.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
1 ILC Push-Pull : Platform Marco Oriunno, SLAC ILD Workshop, Paris May 24, 2011.
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Guinyun Kim (KNU, Korea) International Linear Collider Workshop 2010 Beijing, China, March 2010 Summary of Machine Detector Interface.
Pre-isolator & QD0 support modeling 5th WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist September 7, 2010.
Draft MDI Action plan Presented by Lau Gatignon 25 September 2009.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
SiD MDI Marco Oriunno, SLAC ALCPG11 Eugene- Oregon, March 2011.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
1 J.Osborne (CERN)
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Welcome to MONALISA A brief introduction. Who we are... David Urner Paul Coe Matthew Warden Armin Reichold Electronics support from CEG Central Electronics.
CLIC Experimental Area Layout Design Considerations & ARUP Study A. Gaddi, H. Gerwig, M. Herdzina, H. Hervé, N. Siegrist, F. D. Ramos.
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
1 FP7 LED Potential program to develop inertial sensors Explore potential to achieve 0.1nm stability scale for the FD above a few Herz A.Jeremie, C.Hauviller.
CARE / ELAN / EUROTeV Active stabilization of a mechanical structure Laurent BRUNETTI LAViSta Team LAPP-IN2P3-CNRS,
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Ground Motion spectra status A.Jeremie on behalf of the DESY EUROTeV group which ceased to exist mid-2008 : R.Amirikas, A.Bertolini and W.Bialowons (et.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
External forces from heat links in cryogenic suspensions D1, ICRR, Univ. Tokyo Takanori Sekiguchi.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
FP7: EuCARD after a year of preparation… A.Jeremie.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
Active Vibration Isolation using a Suspension Point Interferometer Youichi Aso Dept. Physics, University of Tokyo ASPEN Winter Conference on Gravitational.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Vibration issues at Linear Colliders:
on behalf of the CLIC active pre-alignment team
Active isolation Target : a low cost dedicated table
EuroTeV WP7 activities in DESY
Laboratories in Annecy working on Vibration Stabilization
Superattenuator for LF and HF interferometers
Guinyun Kim (KNU, Korea) International Linear Collider Workshop 2010
Presentation transcript:

CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos

Page 2 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Retrospective view. In the first CLIC MDI layout (legacy of ILC MDI), the QD0s were supported by the detector, or by a pillar on the detector moving platform. However it became clear, after the measuring campaign at CMS, that the vibrations generated by the detector itself would make impossible to achieve the stability requirements given for the FF magnets. Measurements done at CMS courtesy EN-MME

Page 3 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Scope of work. Try to attenuate, at its source, ground motion vertical excitations, in the range 1 – 20 Hz, to make life easier to the following stabilization systems. Objective. Stabilize FF magnets to better than 1 nm (rms) at 4 Hz, using an integrated approach of three systems, each one with its dynamic range and frequency response:  Passive pre-isolator  Active mechanical stabilization  Beam-based stabilization

Page 4 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Pre-isolator – How does it work? Low dynamic stiffness mount natural frequency around 1 Hz Acts as a low-pass filter for the ground motion (w) Large mass 50 to 200 tons Provides the inertia necessary to withstand the external disturbances (F a ), such as air flow, acoustic pressure, etc.) +

Page 5 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Transfer function of an ideal (*) pre-Isolator with first frequency at 1Hz (*) massless spring k=118 kN/m, QD0 + support tube total mass 3 tons. Tunable frequencies plots by F. Ramos

Page 6 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation RMS vertical displacement reduced by a factor >10 from 4 Hz. plots by F. Ramos

Page 7 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Where does it fit ? Ideally located at the end of the machine tunnel, just in front of the detector, on both sides. drawing by N. Siegrist

Page 8 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation How can it be realized ? QF1 QD0 Mass Elastic support Walk- on-floor QD0 support tube conceptual design

Page 9 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Experimental set-up – Why ? How will it react to different noise sources, else than micro-seism ? Is the system’s performance amplitude dependent ? What about energy loss mechanisms (friction...) ? What performance can we expect ? We plan to build a prototype to try to answer to these questions. The idea is promising, but...

Page 10 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Experimental set-up – How ? The prototype needs to be: Simple to design/build/assemble Easy to “debug” & tune Cheap Proposal: 40 ton mass supported by 4 structural beams acting as flexural springs

Page 11 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Experimental set-up – Expected performance Performance in ideal conditions (ground motion only). TransmissibilityDisplacement P.S.D Integrated R.M.S. Displacement floor 0.15 isolator 15x plots by F. Ramos

Page 12 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Future plans. A passive low-frequency pre-isolator has been proposed as a support for the FF magnets. It can be integrated at the interface between the machine tunnel and the detector cavern. This pre-isolator will constitute the first “layer” of the stabilization chain. This concept has already been used in other industrial and research facilities. Experimental tests should be performed to understand how the system behaves in “real life” conditions (no simulation can accurately take into account all these effects). A simple and relatively inexpensive experimental set-up has been conceived and proposed. Further studies are necessary to integrate the pre-isolator with the civil- engineering and the other MDI systems (pre-alignement, FF magnets, forward detector region, beam-pipe, etc…)

Page 13 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Back-up slides.

Page 14 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Example of pre-isolator application in industry Vibration isolation system at the Centre for Metrology and Accreditation – Helsinki, Finland 4 independent seismic masses (3x70 ton + 1x140 ton) 0.8 Hz pneumatic vibration isolators (“air springs”)

Page 15 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Further considerations. Supporting the FF quads (and in particular QD0) from the tunnel sets some parameters that seem to be difficult to be met with a conventional design of the tunnel-experiment cavern interface, specially for what concerns the civil engineering. What counts to maximize machine luminosity is the relative alignment of the two QD0s, rather than their absolute position. We shall profit of the relatively short distance between QD0s, to try to mechanically link them through a rigid structure that bridges the gap between the two tunnel ends. This would also increase the coherence of low frequency seismic waves across the UX cavern.

Page 16 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Coherence of seismic vibration important for QD0 relative displacement. Relative (nm) 3m4m5m7m509m10mAbs (nm) ATF212.3 (/10)15.6 (/8.2)24.6 (/5.2)34.7 (/3.7)42.0 (/3.1)37.0 (/3.5)128.4 LHC1.0 (/12.5)1.3 (/9.6)1.8 (/6.9)2.6 (/4.8)2.8 (/4.5)3.1 (/4.0)12.5 LAPP0.4 (/7.5)=========0.7 (/4.3)1.0 (/3.0) 0.9 (/3.3)3 Integrated RMS (nm) of relative and absolute motion above 1Hz with a rigid fixation. B.Bolzon, march 2009 Measurements have been planned at CMS site, where a 2.25m thick reinforced concret slab, long several tens of meters, and supported by pillars with foundations into the rock, would be the design reference. We aim to understand if a similar design, in the CLIC experiment cavern, would be beneficial for the FF stabilization at low frequency.

Page 17 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Conceptual design: the Quads’ bridge. The design has evolved from a first sketch, aiming to provide the same foundations for the couple of FFQ, to a more complex design that includes a low-frequency vertical pre-isolator. Main linac Pre-alignment & stabilization FFQ stabilization & alignment Quads-bridge Tunnel floor

Page 18 May 2010, A. Gaddi, Physics Dept. CERN Vibration attenuation via passive pre-isolation Conceptual design: the Quads’ bridge + the pre-isolator. Main linac Pre-alignment & stabilization FFQ stabilization FFQ pre-isolation & alignment Quads-bridge Tunnel floor The main linac elements are aligned and stabilized on their girders. The FF quads are mounted inside a supporting tube, the stabilization is located inside the support tube. The FF quads pre-alignment is done by positioning the support tube, via the low frequency pre-isolator. The FF bridge has the function of extending the tunnel concrete slab from one side to the other of the experimental cavern.