LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.

Slides:



Advertisements
Similar presentations
WP2: Data Management Gavin McCance University of Glasgow November 5, 2001.
Advertisements

Andrew McNab - Manchester HEP - 17 September 2002 Putting Existing Farms on the Testbed Manchester DZero/Atlas and BaBar farms are available via the Testbed.
LHCb Bologna Workshop Glenn Patrick1 Backbone Analysis Grid A Skeleton for LHCb? LHCb Grid Meeting Bologna, 14th June 2001 Glenn Patrick (RAL)
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
LHCb(UK) Meeting Glenn Patrick1 LHCb Grid Activities in UK LHCb(UK) Meeting Cambridge, 10th January 2001 Glenn Patrick (RAL)
LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
Andrew McNab - Manchester HEP - 2 May 2002 Testbed and Authorisation EU DataGrid Testbed 1 Job Lifecycle Software releases Authorisation at your site Grid/Web.
CERN LCG Overview & Scaling challenges David Smith For LCG Deployment Group CERN HEPiX 2003, Vancouver.
NIKHEF Testbed 1 Plans for the coming three months.
Status of SICB and Monte Carlo productions Eric van Herwijnen Friday, 2 march 2001.
GRID workload management system and CMS fall production Massimo Sgaravatto INFN Padova.
Production Planning Eric van Herwijnen Thursday, 20 june 2002.
GRID Workload Management System Massimo Sgaravatto INFN Padova.
K.Harrison CERN, 23rd October 2002 HOW TO COMMISSION A NEW CENTRE FOR LHCb PRODUCTION - Overview of LHCb distributed production system - Configuration.
11 Dec 2000F Harris Datagrid Testbed meeting at Milan 1 LHCb ‘use-case’ - distributed MC production
Exploiting the Grid to Simulate and Design the LHCb Experiment K Harrison 1, N Brook 2, G Patrick 3, E van Herwijnen 4, on behalf of the LHCb Grid Group.
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
Admin Tool June 11, Admin Tool Overview Architecture Implementation Dependencies Futures 2.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
STAR scheduling future directions Gabriele Carcassi 9 September 2002.
LHCb Applications and GRID Integration Domenico Galli Catania, April 9, st INFN-GRID Workshop.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
RLS Tier-1 Deployment James Casey, PPARC-LCG Fellow, CERN 10 th GridPP Meeting, CERN, 3 rd June 2004.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
VOX Project Status T. Levshina. Talk Overview VOX Status –Registration –Globus callouts/Plug-ins –LRAS –SAZ Collaboration with VOMS EDG team Preparation.
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
Cosener’s House – 30 th Jan’031 LHCb Progress & Plans Nick Brook University of Bristol News & User Plans Technical Progress Review of deliverables.
Nick Brook Current status Future Collaboration Plans Future UK plans.
Nadia LAJILI User Interface User Interface 4 Février 2002.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
WP8 Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid WP8 Meeting, 16th November 2000 Glenn Patrick (RAL)
28 March 2001F Harris LHCb Software Week1 Overview of GGF1 (Global Grid Forum) and Datagrid meeting, NIKHEF, Mar 5-9 F Harris(Oxford)
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
Dave Newbold, University of Bristol8/3/2001 UK Testbed 0 Sites Sites that have committed to TB0: RAL (R) Birmingham (Q) Bristol (Q) Edinburgh (Q) Imperial.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Stephen Childs Trinity College Dublin &
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
Portal Update Plan Ashok Adiga (512)
Jens G Jensen RAL, EDG WP5 Storage Element Overview DataGrid Project Conference Heidelberg, 26 Sep-01 Oct 2003.
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
German Cancio – WP4 developments Partner Logo WP4-install progress CERN, 19/6/2002 for WP4-install.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
LHCb Data Challenge in 2002 A.Tsaregorodtsev, CPPM, Marseille DataGRID France meeting, Lyon, 18 April 2002.
LHCb GRID Meeting 11/12 Sept Sept LHCb-GRID T. Bowcock 2 AGENDA 9:30 LHCb MC Production –Points SICB Processing Req. Data Storage Data Transfer.
CLRC Grid Team Glenn Patrick LHCb GRID Plans Glenn Patrick LHCb has formed a GRID technical working group to co-ordinate practical Grid.
Plans for D7.7 The Security Report on the Final Project Release Linda Cornwall, RAL.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
1 DIRAC Project Status A.Tsaregorodtsev, CPPM-IN2P3-CNRS, Marseille 10 March, DIRAC Developer meeting.
WP8 & WP10 Requirements for Testbed1 Ingo Augustin CERN WP6 CERN.
Dave Newbold, University of Bristol21/3/2001 (Short) WP6 Update Where are we? Testbed 0 going (ish); some UK sites being tried out for production (mostly.
LHCb computing model and the planned exploitation of the GRID Eric van Herwijnen, Frank Harris Monday, 17 July 2000.
The EDG Testbed Deployment Details
Moving the LHCb Monte Carlo production system to the GRID
Gridifying the LHCb Monte Carlo simulation system
Leanne Guy EGEE JRA1 Test Team Manager
Gridifying the LHCb Monte Carlo production system
First attempt at using WIRED
Status and plans for bookkeeping system and production tools
Short to middle term GRID deployment plan for LHCb
Presentation transcript:

LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001

Overview  Information & organization  Testbed0  Procedure for participating institutes: Planning of tests: admin Planning of tests: what to test Planning of tests: how to do it  Status so far  Timescale

Information and organization Mailing list:  CVS repository:  to get Java production tools: cvs -d $NEWCVSROOT co GRID/productiontools  to get the DataGRID LHCb installation kits: cvs -d $NEWCVSROOT co GRID/installationkits  to get sample script and.dat files: cvs -d $NEWCVSROOT co GRID/scripts

Testbed0  Objective: deploy basic Globus services and test them

Procedure for participating institutes  CERN, Lyon, Marseille, RAL, INFN Bologna, Liverpool, Edinburgh, Imperial, Nikhef  others interested please contact me

Planning of tests: admin  Complete your entry in previous table and contact me (find out exactly what your local testbed0 is from local WP6 contact)  Decide which tests you want to do (e.g. Submit jobs from Bologna to Liverpool)  Get a national Grid certificate following the procedure on  Get local accounts on the testbeds that you want to test  WP6 will add people to Grid map files

Planning of tests: what to test  Objective: run bb-bar inclusive generation and reconstruction job via Globus if possible send data to CERN update the bookkeeping database  For sites wishing to become part of LHCb production: installation of java production tools automate file transfer to CERN

Planning of tests: how to do it  Check out GRID files from cvs repository  uncompress (gunzip *.tar.z) and untar (tar -xvf *.tar) the installation kits  run the bbincl.job script, modify it until it works (don’t worry about java to start with)  when it works, do e.g.: globus-job-submit csflnx01.rl.ac.uk/jobmanager-pbs bbincl.job  try to recover output with other globus commands or ftp by hand  to install production tools (requires servlet runner) contact me

Status so far  RAL CSF and CERN testbed0 integrated with LHCb production tools  Jobs with 5 events run fine  Larger jobs can be run one at a time, problems with gass_cache under investigation  Problems interfacing to pbs (jobs always end up in M queue)  Problems with using sh or csh

Timescale  Tests of testbed0 should be done before september 2001 (testbed1 release)  LHCb Grid meeting Bologna june 2001 progress on testbed0 tests security issues for testbed1 LHCb analysis model