Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director,

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
Concerns with RUC Capacity Short Charge and Energy Trades.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Loads Acting as a Resource Relationships with QSEs and LSEs
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
An Approach to Adjust ERCOT’s Long-Term Load Forecast for Utility Energy Efficiency Programs Jay Zarnikau Frontier Associates LLC June 10, 2013.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
ERCOT Strategic Plan H.B. “Trip” Doggett President and Chief Executive Officer Technical Advisory Committee ERCOT Public December 3, 2013.
2007 ERCOT SOM Report Recommendations Dan L. Jones Vice President Director, ERCOT IMM Potomac Economics ERCOT Wholesale Market Subcommittee Austin, Texas.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
EILS Cost Comparison WMS Jan. 28, Background ERCOT procures Emergency Interruptible Load Service three times annually by Contract Period –February-May.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
Discuss Options to Improve Market Visibility to RTBES Presented by: Matt Mereness Friday, October 27, 2006.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
1 TAC Report to the ERCOT Board February 16, 2005.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
PRR Impact Analysis Update Steve Wallace Program Management Office October Board Meeting.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
1 TAC Report to the ERCOT Board January 17, 2006.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
1 TAC Report to the ERCOT Board November 14, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Report to WMS September 19, 2007.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
1 WMS Report To TAC October In Brief One Working Group Report One Working Group Report One Task Force Report One Task Force Report Three Staff.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Bad Moon Rising in ERCOT RMR 1. “So you're going to be talking in a minute about an RMR contract in Houston, and that should concern you.” “…what other.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
TAC Report to the ERCOT Board
Appeal of PRS Rejection of NPRR 667
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
GENESYS Redevelopment Strawman Proposal
Sixth Power Plan Setting Conservation Targets and Implementation Strategies Jill Steiner, Snohomish Public Utility District Northwest Power and Conservation.
Market Pricing Initiatives Update September 9th, 2003
Presentation transcript:

Review of Proposed Zonal Market Improvements ERCOT Board of Directors Meeting February 17, 2009 Dan L. Jones Potomac Economics Vice President Director, ERCOT IMM

Background Given the delay in the implementation of the nodal market, Potomac initiated in Q a review of potential zonal market improvements More than a dozen potential improvements were identified, many of which would involve substantial system modifications Three recommendations with potentially low system impact and significant market efficiency improvements were presented to WMS  More efficient pricing during non-spinning reserve deployments (PRR 776)  More efficient pricing during system shortage conditions (PRR 791)  Improved dispatch efficiency by better ramp rate utilization (PRR 601)

PRRs 601, 776 and 791 Each of these PRRs will improve market efficiency  PRRs 601 and 776 will reduce the frequency of inefficient price spikes during non-shortage conditions  PRR 791 will increase the probability of efficient price spikes during shortage conditions (relative to actual market performance, but not relative to the expectations in P.U.C. Subst. R ) Each of these PRRs will enhance system reliability  PRR 601 will: reduce the frequency of portfolio ramp rate violations increase the availability of dispatchable energy during times of system stress  PRR 776 will: provide more timely access to non-spinning reserves facilitate increased participation in the NSRS market by load resources (historical load participation in NSRS has been essentially zero) provide ex ante pricing during NSRS deployments that will better facilitate supply and demand response (currently MCPEs during NSRS deployments are re-calculated and posted 1-3 days following the operating day)  PRR 791 will: reliably produce prices during shortage conditions that provide incentives for supply and demand supporting short- and long-term reliability reliably produce prices during shortage conditions as anticipated and within the bounds of the parameters established in P.U.C. Subst. R

IMM Position Ideally, PRRs 601, 776 and 791 should all be implemented as soon as possible to capture the associated efficiency improvements and reliability enhancements for the duration of zonal market operations Significant effort has been devoted to PRRs 776 and 791 to minimize implementation costs and system impacts PRR 601 may be more challenging from a system impact perspective – for both ERCOT and QSE systems If a decision is made to forego implementation of PRR 601, PRRs 776 and 791 should still be implemented