International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Global ATM Operational Concept
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
System of Systems (DRAFT) To be approved by the ICAO Council
Global Air Navigation System ~ Planning Mechanisms ~ H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Information Management The ICAO Perspective
International Civil Aviation Organization Hands-on Exercises Performance Based Planning and use of IFSET SIP/ASBU/Bangkok/2012-WP/32B Workshop on preparations.
International Civil Aviation Organization Performance Framework for Efficiency H. Sudarshan SIP/ASBU/2012 -WP/5 Workshop on preparations for ANConf/12.
Page 1 Coordination Mechanism Between PIRGs ICAORD Dakar PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-4 PIRGs Agenda.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Economic issues Formulation of Business cases H. Sudarshan SIP/ASBU/2012-WP/30 WORKSHOP ON PREPARATIONS FOR AN.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Introduction to PBN Seminar ICAO PBN Implementation 1.
SIP/2012/ASBU/Nairobi-WP/6
International Civil Aviation Organization Measurement of environmental benefits Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
Page 1 A brief on MIDANPIRG Hamad Alaoufi (Chair MIDANPIRG) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-2 MIDANPIRG.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Performance Framework for Efficiency H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Economic issues Formulation of Business cases H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
System of Systems (DRAFT) To be approved by the ICAO Council
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Global Air Navigation System ~ Planning Mechanisms ~
Workshop on preparations for ANConf/12 − ASBU methodology
Performance Framework for Efficiency H. Sudarshan
SIP/2012/ASBU/Nairobi-WP/7
Workshop on preparations for ANConf/12 − ASBU methodology
Global ATM Operational Concept
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Trajectory-Based Operations(TBO) Saulo Da Silva
Measurement of environmental benefits Saulo Da Silva
ANConf/12 – Agenda H. Sudarshan
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Hands-on Exercises Performance Based Planning and use of IFSET
Workshop on preparations for ANConf/12 − ASBU methodology
AIM Global Strategy Air Navigation Procedures for AIM Seminar
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop on preparations for ANConf/12 − ASBU methodology (Nairobi, August 2012)

Outline Planning mechanisms Development of revised GANP What is new in the revised GANP What are the policy changes International agreement at the ANConf/12 ICAO SIP ASBU workshop 2

Partners Planning Levels DeliverablesGuidance ICAOGlobalGlobal planICAO policy Regional planning groups RegionalRegional planGlobal plan Subregional/ or Multinational groups Subregional or Multinational Subregional plan or Multinational Regional plan StatesNationalNational planRegional plan Planning Mechanisms…

4 Partners Planning Levels DeliverablesGuidance Airspace usersRegional, national User-driven plan Regional and national plans Service providers Global, regional, national Service- provider plan Global, regional and national plans IndustryGlobal, regional, national Manufacturer plan Global, regional and national plans Planning Mechanisms ICAO SIP ASBU workshop

5 STATES General Planning Principles Online Interactive Planning Tools National Plans GLOBALANP Volume I Basic part of Air Navigation Plan Volume II Facilities and Services Implementation Document REGIONALANP Action Contribution line Harmonization PIRGS ROs ROs ICAO HQ Global Plan, Regional Plans and National plans ICAO SIP ASBU workshop

6 What is Global Plan? Strategic Document for regional and national planning for air navigation infrastructure Serves as global guidance for PIRGs Maturity process – First developed as global coordinated plan for CNS/ATM Systems in 1992 – In 1998 the Global Plan for CNS/ATM systems released – In 2006, the Global Plan for Air Navigation Systems was developed – In 2012, revised Global Plan will be presented during 12 ANConf that will contain ASBU methodology Refers to five major disciplines – ATM, CNS, MET, AIM and AGA ICAO SIP ASBU workshop

7

8 GANP- Contents (DOC 9750) Global Air Navigation Plan -Outline EXCUTIVE VIEW Chapter 1: Global Air Navigation Policy Chapter 2: Near Term Standardization – ASBU Block 0 and 1 Chapter 3: Continuing Strategic Planning – ASBU Blocks 2 and 3 Chapter 4. Implementation-Turning ideas into action Chapter 5: Aviation System Performance: Analysis and Reporting Appendices: 1. GANP Ownership, Overview and Evolution; 2. Hyperlinked Online Support Documentation; 3. Technology Roadmaps; and 4. SARPs Development Planning. ICAO SIP ASBU workshop

End: Validate and monitor Start: review user needs (e.g. capacity, delays, routes, etc.) Identify homogenous areas/traffic flows/terminal areas/aerodromes List States/FIRs Consider current/foreseen traffic population. Consider forecasts of average and peak aircraft movements. Survey Aerodrome characteristics, ATM Infrastructure including Human Resource availability Consider civil/military access and SUA requirements Assess costs & revenue parameters Review National Plans requirements Set Performance Objectives Elaborate/refine scenarios Perform/integrate initial CBA/ sensitivity analysis Evaluate acceptance by users Estimate human resources requirements Estimate new economic parameters Develop implementation mechanisms Develop consensus with users Amend Regional Plans Develop human resources plan Perform implementation tasks End: Validate and monitor ASBUs ManageAssessElaborateEstimateImplement Review IDENTIFY GAPS Performance Metrics Air Navigation Reports Flow chart for regional and national planning

10 Mapping of the hyperlinked technical content supporting the Block Upgrade Modules and Technology Roadmaps ICAO SIP ASBU workshop

11 Safety Tools ICAO SIP ASBU workshop

International Civil Aviation Organization What is new in the revised Global Plan? NoCurrent version (Nov 2006) Upcoming revised version (Nov 2012) 1Scope covers only ground equipment for ANSPs Scope extends to airspace users and regulators involving Airlines and CAAs 2P (paper)–basedE (electronic)–based ICAO SIP ASBU workshop

International Civil Aviation Organization What is new in the revised Global Plan? NoCurrent version (Nov 2006) Upcoming revised version (Nov 2012) 3Does not support planning tools for its implementation Detailed guidance available online on the related website 4Addresses individual improvements through GPIs Addresses a package of improvements through ASBU Modules encompassing all GPIs ICAO SIP ASBU workshop

International Civil Aviation Organization What is new in the revised Global Plan? NoCurrent version (Nov 2006) Upcoming revised version (Nov 2012) 5No individual roadmap for enablers Separate technology roadmaps for C, N, S and IM 6Aircraft equipage not specified Avionics roadmap included ICAO SIP ASBU workshop

International Civil Aviation Organization What is new in the revised Global Plan? NoCurrent version (Nov 2006) Upcoming revised version (Nov 2012) 9Global plan was not presented to Industry forum Global Plan reviewed by GANIS 10Implementation was based on near term and medium terms Implementation is based on near, medium and long terms through Blocks 0, 1, 2 and 3 timeframes ICAO SIP ASBU workshop

International Civil Aviation Organization What is new in the revised Global Plan? NoCurrent version (Nov 2006) Upcoming revised version (Nov 2012) 11Supported by paper based Regional ANPs Supported by web based Regional ANPs, called eANPs 12Quantification of fuel savings and corresponding environmental benefits are not available ICAO Fuel Savings Estimation Tool (IFSET) will be a part of the revised global plan ICAO SIP ASBU workshop

17 Regional Agreement Regulators will now be part of regional and national air navigation planning process by supporting required regulatory needs for ASBU modules Regional agreement for the implementation of ASBUs will be reflected in the respective regional air navigation plans through PIRG process National planning will also follow ASBU methodology thus deriving all benefits for all the entities The FASID part of the regional plans is now needed to reflect ground systems as well as avionics to implement the respective ASBU modules. This process ensures commitment by all States, Users and ANS providers for the implementation work programme. ICAO SIP ASBU workshop

18 Revised GANP -International Agreement at AN-Conf/12 AN-Conf/12 in Montréal, November 2012 AN-Conf/12 in Montréal, November 2012 Global Air Navigation Plan (Global ANP) revision – Available on ICAO Website: ANConf/12-WP3 – First Global Air Navigation Report planned for 2014 Regional Air Navigation Plan (online format known as eANP) revision – 2012 – ICAO is progressing towards development of online version of Regional Plans, called e-ANPs for all the regions and will include ASBU methodology. The Regional e-ANPs will be an online interactive plan with access rights to States, International organizations and Regional offices and will be made available at the AN-Conf/12. ICAO SIP 2012-ASBU workshops

19 Synergies between GANP and GASP ICAO SIP 2012-ASBU workshops  Combined Synergies between GANP and Global Aviation Safety Plan (GASP)  A 4 page document describes System of systems  Explains development of Safety and Air Navigation Reports  Informs update process for both GANP and GASP

20 ICAO SIP ASBU workshop