Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.

Slides:



Advertisements
Similar presentations
DIS 2008, London Transverse Spin Physics at PHENIX Douglas Fields (University of New Mexico) For the PHENIX Collaboration 4/9/20081 Douglas Fields for.
Advertisements

Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
PHENIX local RUN9 RHIC meeting Manabu Togawa for the PHENIX 1.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
1 The Forward Silicon Vertex Detector Upgrade for the PHENIX Experiment at RHIC Douglas Fields University of New Mexico Feb. 12, 2011 Douglas Fields, WWND11,
1 The CMS Heavy Ion Program Michael Murray Kansas.
Mar. 17, 2006 Imran Younus Probing Gluon Polarization with Longitudinally Polarized p+p Collisions at  s = 200 GeV.
RHIC/AGS User’s Meeting PHENIX Run-15 Goals and Status Douglas Fields University of New Mexico For the PHENIX Collaboration.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
Xiaodong Jiang Gluon spin with longitudinal asymmetries at RHIC. Parton angular motion - transverse spin asymmetries. Spin at RHIC : p+p. Spin at JLab:
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
R CP Measurement with Hadron Decay Muons in Au+Au Collisions at √s NN =200 GeV WooJin Park Korea University For the PHENIX Collaboration.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Spin Physics with PHENIX (an overview, but mainly  G) Abhay Deshpande Stony Brook University RIKEN BNL Research Center July 28, 2011.
What can we learn from η production in proton-proton collisions? Joe Seele MIT and University of Colorado.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Measurements of Transverse Spin Effects with the Forward Pion Detector of STAR Larisa Nogach Institute of High Energy Physics, Protvino for the STAR collaboration.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
1 PHENIX Status Ed O’Brien for John Haggerty Brookhaven National Laboratory June 23, 2009.
MPC-EX hardware design and capability The MPC-EX detector system is an extension of the existing Muon Piston Calorimeters (MPCs) of the PHENIX experiment.
Measurement of the Double Longitudinal Spin Asymmetry in Inclusive Jet Production in Polarized p+p Collisions at 200 GeV Outline Introduction RHIC.
1 NCC CDR prep and Physics strategy Richard Seto UCR DC Upgrades meeting Feb 8, 2006.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Oct. 12, 2007 Imran Younus k T Asymmetry in Longitudinally Polarized p +p Collisions at PHENIX.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
October 22, 2004 Single Spin Asymmetries at RHIC 1 F.Videbaek Physics Department, Brookhaven National.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Spin Physics with PHENIX (an overview, but mainly  G) Abhay Deshpande Stony Brook University RIKEN BNL Research Center PANIC’11 at MIT July 28, 2011.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
K. Barish UC Riverside 7 Oct Spin PHYSICS at PHENIX with a Central Arm Trigger Kenneth N. Barish For the PHENIX Collaboration UC Riverside DNP’2000,
Overview of the sea quark polarization measurements of PHENIX at RHIC DIS April 12, Rusty Towell Abilene Christian University on behalf of the PHENIX.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
Reduction of background in observation of W – decay using FVTX tracker Abraham Meles New Mexico State University DNP2012 – Newport Beach, CA. Oct 25, 2012.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Brett Fadem of Muhlenberg College for the PHENIX Collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
BUP Discussion Input John Koster, Sasha Bazilevsky, Itaru Nakagawa Spin PWG 2013/04/03 1.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN16 Status Y. Akiba (RIKEN/RBRC) 2016/05/27 Radiation lab meeting.
Recent Results on Proton Helicity Structure Studies from PHENIX
Larisa Nogach Institute of High Energy Physics, Protvino
Heavy Ion Physics in RUN14-16
Transverse Spin Physics at PHENIX
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
Y. Akiba (RIKEN/RBRC) 2016/04/21 Radiation lab meeting
Y. Akiba (RIKEN/RBRC) Radiation Lab meeting 2016/06/30
APS/JPS Second Joint Meeting Sep. 19, 2005
Presentation transcript:

Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico

Time Meeting FVTX High Multiplicity trigger 04/21/2015Douglas Fields 2

Time Meeting MPCEX update 04/21/2015Douglas Fields 3 Detector running well, taking data Offline analysis working on calibrations: – High/Low gain ratio calibrations working – MIP calibration of MPC-EX minipad gains making progress – MPC calibration underway (complicated) High/Low Channel Calibration Double-Landau fit to MIPs in minipads:

Time Meeting Local Polarimeter Determination of Polarization Loss 04/21/2015Douglas Fields 4 Slope of Local Pol. Asymmetry Loss Time

Time Meeting PHENIX Efficiency 04/21/2015Douglas Fields 5

Time Meeting Luminosity Progress RHIC projections ( gave Run- 12 achieved delivered luminosity as 9.3 pb −1 /week and 22 pb −1 /week max expected in Run-15 (after 5 weeks running). Converting to our recorded luminosity: 4.5 pb −1 /week and 10.1 pb −1 /week (for the |z| < 40cm program) and 1.6 pb −1 /week and 3.85 pb −1 /week (for the |z| < 10cm program) 04/21/2015Douglas Fields 6

Time Meeting FOM Progress RHIC projections ( gave Run- 12 achieved delivered luminosity as 9.3 pb −1 /week and 22 pb −1 /week max expected in Run-15 (after 5 weeks running). Converting to our recorded luminosity: 4.5 pb −1 /week and 10.1 pb −1 /week (for the |z| < 40cm program) and 1.6 pb −1 /week and 3.85 pb −1 /week (for the |z| < 10cm program) 04/21/2015Douglas Fields 7

Time Meeting PHENIX FOM Progress 04/21/2015Douglas Fields 8

Time Meeting Summary Taking physics data for HF in Muon and Central arms. MPC-EX continues taking physics data and offline analysis ongoing. High Multiplicity trigger approaching >400M triggered events. 04/21/2015Douglas Fields 9

Time Meeting Backup 04/21/2015Douglas Fields 10

Time Meeting Progress Towards Physics Goals (p+p) Two physics programs: – Forward direct gamma physics with the MPC-EX 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 50 pb −1 recorded within |z| = 60%] – Heavy Flavor physics using the F/VTX 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 21 pb −1 recorded within |z| = 60%] In our BUP, ( &materialId=0&confId=764) we state that we assume PHENIX uptime 70%, fraction of events within +/- 10 cm (25%) and +/- 40 cm (70%). &materialId=0&confId=764 04/21/2015Douglas Fields 11