4 th Workshop, Amsterdam, 23 - 25 April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone

Slides:



Advertisements
Similar presentations
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Advertisements

1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 The role of human in ATM automation: a key issue Alain Printemps head of DNA/CENA.
Total Airport Management CARE Innovative Study
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Fast-Time Simulation and Prototyping Episode 3 - CAATS II Final Dissemination.
Workshop on Human Factors in Education & Training for Safety Comparing Air Traffic Control and Healthcare Warwick – 8th April, 2008 Simone Pozzi.
1 DLR/EEC Total Airport Management Christoph Meier & Peter Eriksen European Organisation for the Safety of Air Navigation.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Time-Based Sequencing OHA CARE-ASAS Activity 3: ASM Time-Based Sequencing OHA.
Study Continuous Climb Operations
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
EEC-ATI (V2) 1 ATN2002 CONFERENCE LINK2000+ ATN2002 CONFERENCE LINK2000+ LINK2000+ European ATS Provider Benefits Real-time Simulation Results ATN2002.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
1 CoSpace Experimental results on sequencing & merging Karim Zeghal ASAS Thematic Network, Second workshop 6-8, October 2003, Malmö, Sweden.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
Computerised Air Traffic Management Tools - Benefits and Limitations OMAR BASHIR (March 2005)
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS LC&P Applications in Radar Airspace: Operational Scenario Example and Fast-Time Simulation Results.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
1 Airborne spacing in the terminal area: A study of non-nominal situations EUROCONTROL Experimental Centre European Organisation for the Safety of Air.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 NUP II+…results from different areas… …not only CPDLC and S&M Presented by Fredrik Lindblom, LFV
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Glasgow 12 September 20061/22DEEP BLUE CONSULTING AND RESEARCH | CLAUDIA FUSAI ASAS-TN2 Controllers situational awareness issues.
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
4 th Workshop, Amsterdam, April 2007 page 1 ASPA-S&M in Paris ASPA-S&M in Paris: CRISTAL PARIS and PALOMA results Jean-Marc Loscos, DSNA.
Benefits of CDM Within AFI Region Presented by: Mikateko Chabani.
Discussions Summary ASSTAR - Crossing & Passing session.
Episode 3 E3-WP0-MWPM PPT-V th ExCom Slides 1 Episode 3 - Ex-Com Final Report Tools & Validation Dr. Ralph Leemüller R&D Division - DFS.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
MFF is a EC Co-funded Programme  MEDITERRANEAN FREE FLIGHT Flight Trials Report ASAS TN2 1st Workshop | September 2005, Malmö Gennaro GRAZIANO 1/32.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS-SEP Applications Airborne Implementation Overall Architectural Considerations.
M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Impact of Operating Context on the Use of Structure in Air Traffic.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
ASSTAR Overview Jean-Marc Loscos, DSNA
ASAS Thematic Network ASAS Operational Improvements -Dream or Reality:- The Impact on the Controller Anthony Smoker - IFATCA ASAS-TN First Workshop Rome.
Project conclusions and recommendations Thierry Arino (Sofréavia)
Presented by United Arab Emirates
KDC ASAS 2008 project - How could ASAS benefit the NL ATM System
Introduction of TBO within OptiFrame
Chris Shaw, EUROCONTROL Experimental Centre
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
Presentation transcript:

4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone

4 th Workshop, Amsterdam, April 2007 Outline G2G Interest Extent of Validation Results Recommendations Conclusion

4 th Workshop, Amsterdam, April 2007 G2G Objective Objective to focus on possible R&D solutions for ATM improvement from gate to gate ASPA S&M identified as one of the tools able to improve arrival management Interest: ASPA S&M in different operational environments: –Evaluate different technical implementations supported by different tools (e.g. AMAN, D/L, SYSCO) –Compare different developments of working methods and applicability conditions in different scenarios

4 th Workshop, Amsterdam, April 2007 Extent of Validation FTS3 Paris FTS2 Rome RTS3A Rome RTS3B Naples RTS2 Paris RTS4 Rome Validation Strategy & Plan ( ) DSNA ENAV EEC

4 th Workshop, Amsterdam, April 2007 Extent of Validation FTS3 Paris FTS2 Rome RTS3A Rome RTS3B Naples RTS2 Paris RTS4 Rome Validation Strategy & Plan ( ) DSNA ENAV EEC

4 th Workshop, Amsterdam, April 2007 Extent of Validation KPA –Acceptability –Operability –Applicability –Capacity/Efficiency –Safety

4 th Workshop, Amsterdam, April 2007 Results Operational concept Procedures and human factors Systems, HMI & technology Benefits & constraints Safety assessment Transition issues

4 th Workshop, Amsterdam, April 2007 Results – Operational Concept Considering that ASAS application not mandatory and applied when helpful Globally, significant use of ASAS chains both in TMA and E-TMA High usage in dense traffic ASPA S&M is more easily applied where AMAN and D/L are implemented Building and sticking to the AMAN sequence was facilitated by the use of ASAS

4 th Workshop, Amsterdam, April 2007 Results – Procedures and human factors Acceptability differs depending on scenarios and application development from a procedural and technical point of view –Procedures were accepted even if “digested” differently in the different environments –Phraseology still a little bit long Confidence improves with practice, thus reducing complexity perception

4 th Workshop, Amsterdam, April 2007 Results – Procedures and human factors Increased ATCO availability as ASPA S&M reduces: –EXC instructional workload (especially in the approach phase) –EXC monitoring workload (in large spacing conditions) EXC and PLC workload is more evenly distributed applying ASAS Improved strategic control and teamwork Job satisfaction and motivation is not compromised

4 th Workshop, Amsterdam, April 2007 Results - Systems, HMI & technology HMIs were considered usable despite further feedbacks for improvement collected in different degrees according to the maturity of the adopted HMIs Positively accepted: minimum technical interoperability between AMAN and ASPA S&M

4 th Workshop, Amsterdam, April 2007 Results – Benefits and constraints More regular, predictable and efficient spacing is possible when ASPA S&M is used AMAN/ASPA S&M increase punctuality over the IAF - optimising the available airspace capacity Anyway ASPA S&M should not increase runway capacity, benefits more in terms of smoothing and safety

4 th Workshop, Amsterdam, April 2007 Results – Safety Assessment Delegation and automation of sequencing tasks increased safety perception Lowering instructional workload leaves more time to concentrate on monitoring Monitoring also facilitated as ASAS links enable a quick and clear understanding of a/c flows flying in sequence towards the same runways Possible reduction of monitoring due to confidence Situational Awareness is affected by: –ASPA S&M ‘heading and merge’ or ‘heading then remain behind’ applications –Possible ‘Unable delegation’ in heavy traffic

4 th Workshop, Amsterdam, April 2007 Results - Transition In general controllers managed mixed traffic (50- 75%) in an easy way Non-equipped a/c easy to detect

4 th Workshop, Amsterdam, April 2007 Recommendations ASPA S&M requests well-defined procedures and supporting functions to work properly –Phraseology should be optimised –Roles and working methods should be better defined and combined with supporting applications (e.g. AMAN, D/L) –Adequate recovery procedures in case of failure mode or non-nominal situations are required –Further focus on HMI design and development of supporting functions is required Suitable re-designed ATS geography (merging points and holding legs) can increase ASAS benefits

4 th Workshop, Amsterdam, April 2007 Conclusion Operable and useful to set up approach sequences Applicable in the evaluated environments despite of some changes Accepted by controllers especially if used in conjunction with AMAN (planned sequence facilitates ASAS implementation) and D/L (to reduce R/T communication) Benefits should be measured quantitatively, with focus on capacity and environmental impact Target time for implementation: beyond 2015 time horizon

4 th Workshop, Amsterdam, April 2007 Thank You For Your Attention