Wideband Delphi Technique George Ukkuru. Introduction Consensus based approach for estimation Developed in the 1940’s at Rand Corporation Team of experts.

Slides:



Advertisements
Similar presentations
A method for addressing any large problem. Carefully consider the problem. Define the problem. Ask yourself the following questions: What is it that I.
Advertisements

Creative Thinking.
Iteration Planning.
Planning at CMM level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements Engineering.
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Team & Teamwork. More Than Meets The Eyes! 3 Design Group  Engineering projects require diverse skills  This creates a need for group (team) work 
Applied Software Project Management Estimation
Project Planning Dr. Jane Dong Electrical and Computer Engineering.
Heuristic Evaluation IS 485, Professor Matt Thatcher.
Software project management Module 1 -Introduction to process management Teaching unit 1 – Introduction Ernesto Damiani Free University of Bozen-Bolzano.
SE 555 Software Requirements & Specification Requirements Validation.
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
TOGETHER EVERYONE ACHIEVES MORE
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Brainstorming Steve Chenoweth & Chandan Rupakheti RHIT Chapters 12 & 13, Requirements Text, Brainstorming Techniques document Brainstorming involves generating.
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
1 1 Slide © 2009 South-Western, a part of Cengage Learning Chapter 6 Forecasting n Quantitative Approaches to Forecasting n Components of a Time Series.
Slides by John Loucks St. Edward’s University.
Client Logo LEAN ENTERPRISE Implementation Workshop.
Teamwork and Consensus Leadership. 1.____________ ____________  asks questions, looks for new ideas, willing to research, open to new ideas 2._____________.
Needs Analysis Gentry Chapter 2 Summary Regina Smith.
Project Management Life Cycle Katy Koenen 05/07/2013.
For Transportation Projects Niyi Olumide Stuart Anderson Texas A & M University A Delphi Study.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Information Technology Project Management
This document is proprietary to Project Consulting Group, Inc. and contains confidential information which is solely the property of Project Consulting.
1 Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Task Order Competition (TOC) Process.
Work Breakdown Structure (WBS) The WBS represents a logical decomposition of the work to be performed and focuses on how the product, service, or result.
Estimation Chapter 3 Applied Software Project Management, Stellman & Greene.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Software Project Planning Chapter 2 Applied Software Project Management, Stellman & Greene.
SacProNet An Overview of Project Management Techniques.
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
Oklahoma State University DelphiDr. Camille DeYongSlide 1 Expert Opinion Three circumstances –No historical data –Impact of external factors is more important.
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
Applied Software Project Management LESSON 3: ESTIMATION Applied Software Project Management 12:02:37 PM 1.
Quality Software Project Management Software Size and Reuse Estimating.
Applied Software Project Management
© Pearson Education Limited 2004 OHT 9.1 Cadle and Yeates: Project Management for Information Systems, 4th edition IS estimating issues Unique projects.
Software Measurement and Analysis Team Assignment 13 Team 04.
Develop Project Charter
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
Project Estimation techniques Estimation of various project parameters is a basic project planning activity. The important project parameters that are.
Estimating Schedule Durations Using MS Project PERT Analysis Tool Presented by Harry Smith MPUG St. Louis Chapter Member February 9,
ENGLISH PROGRAM Make A Difference Vision.  1 year vision = IMPACT  3 year Vision = QUALITY  5 year vision = QUALITY & QUANTITY.
Communicating for Results Seventh Edition Cheryl Hamilton, Ph.D.
Introduction to Requirements Eng. Copyright, 2001 © Jerzy R. Nawrocki Requirements.
Requirements Engineering Processes. Syllabus l Definition of Requirement engineering process (REP) l Phases of Requirements Engineering Process: Requirements.
Project Management.
Projects and Activities Defining activities some assumptions that will be relevant when we start to produce an activity plan. Activities must be defined.
Monoj Kumar Majumder Dept. of Agricultural Economics SAU, Dhaka.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Cost Estimation Cost Estimation “The most unsuccessful three years in the education of cost estimators appears to be fifth-grade arithmetic. »Norman.
Viking Estimation Team Assignment 13 Team 2-1. Content 1/ Introduction 2 / Wideband Delphi & COCOMO II 3 / The assemble task formula 4 / Wideband Delphi.
Leadership Skills. Team Meetings Set the agenda by defining goals and desired outcomes Set the agenda by defining goals and desired outcomes Keep the.
(6) Estimating Computer’s efficiency Software Estimation The objective of Software Estimation is to provide the skills needed to accurately predict the.
Module 3: Managing People Topic 6 Spring Groups and Organizations Groups are collections of two or more people who work with one another regularly.
Lecture 6 Title: Project Cost Management MIS 434.
The Project Management Process Groups
1 Framework Agreements Blended Rates, Invoicing & Variations – Commissioning
Creating a Work Breakdown Structure with Microsoft Project.
Planning Poker-Agile Estimation for Dummies S.INFANTA PRINCY, M.E II YEAR. ANNA UNIVERSITY, TRICHY.
Work Breakdown Structure (WBS)
10 Stages Of the Engineering Design Process
Chapter 8: Making decisions in the educational Arena
Work Breakdown Structure (WBS)
Software Cost estimation
A Design Process.
Presentation transcript:

Wideband Delphi Technique George Ukkuru

Introduction Consensus based approach for estimation Developed in the 1940’s at Rand Corporation Team of experts prepare individual estimates.

Benefits Build a complete task list or work breakdown structure for major activities. Consensus approach helps eliminate bias in estimates. Eliminate hidden agendas or divergent objectives for inexperienced estimators or influential individuals. Does not require historical data to prepare the estimates. Straightforward and Repeatable process

Process Planning Kickoff Meeting Individual Estimation Estimation Meeting Assemble Tasks & Review Results

Planning Project Manager selects a team and a moderator Team consists of 3-7 team members Representation from all groups like development, testing etc Moderator to be familiar with the Delphi process Ideal to have the Project Manager as a part of estimation team Project Manager should not be the moderator as he will have stake in the outcome of the estimation

Kickoff Meeting Explain the Delphi process Read the vision and scope document or any supporting documents [Pre-requisites] Review the goals of the estimation session Brainstorm and note down the assumptions Generate the initial WBS Decide upon the unit for estimation

Individual Estimation Estimate the time required for each task Add any additional tasks to the WBS Add any missing assumptions

Estimation Meeting Moderator shares the estimates so that estimators can see the range of estimates Individual estimates are not shared Team members revises estimates based on group discussions Estimates are revised until no estimator wants to changes his/her estimates. Estimators agree that the estimates are acceptable.

Wide Band Delphi Example There estimators A,B and C are told to prepare the time required to prepare test scenarios for a project The initial estimations provided were A – 18 Hours B – 38 Hours C – 58 Hours The moderator then Calculates average estimate as 38 hours Returns this with their original estimates to the estimators

Wide Band Delphi Example The estimators then meet and discuss the estimates The initial estimations provided were A – 31 Hours B – 32 Hours C – 33 Hours The moderator then Calculates average estimate as 32 hours Asks the estimators if they agree with this as the estimate

Iterations in Estimations Round 2 XX Round 1 X X X

Assemble Tasks & Review Results Project Manager works with the team and collects the estimates from team members Compiles the final WBS, estimations and assumptions Reviews the final estimates with the estimation team

Ground Rules All estimation sessions must be performed individually with no group interaction Estimators must indicate factors affecting their estimates Estimators will ignore holidays, vacations and other similar factors Anonymity must be observed during the whole estimation process Estimation sessions should have a predefined time limit

Assumptions Assume that one person will perform all tasks Assume all tasks will be performed sequentially Assume that you can devote uninterrupted time to each task

About the Author George Ukkuru is working as a test manager UST Global Trivandrum. He is having more than 10 years of experience in the field of software testing. He holds various certifications like PMP,CAPM,CSTE etc. He can be reached at