Cross Border Balancing - 2Hr Product NGET and RTE Paper.

Slides:



Advertisements
Similar presentations
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
Advertisements

Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Balancing Update Stakeholder Group Meeting - 4 November 2009.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG July 2008 Jean-Philippe Paul - John Prime.
Progress with coupling FUI and CWE region
GB Queue The GB Queue – Problems and possible solutions Mark Copley.
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
NGEIR Technical Conference Presentation May 16, 2006.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013.
OSC Meeting April 27, Transmission Cost Allocation Overview.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
1 Operating Margins – Request for Proposals Transmission Workstream 6 th April 2006 Dave Smith, National Grid NTS.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
C O U P L E D NWE Day Ahead Price Coupling Handling of losses in the algorithm IG meeting, December 5 th, 2012, DERA premises, Copenhagen.
Update on IFA Actions Congestion Management Guideline Workshop Thursday 11 th January, CRE Offices, Paris Simon McVeigh, IFA Manager, National Grid Interconnectors.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
Industry Dialogue on xoserve Services 14 th September 2007.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
Real Involvement Statutory guidance for section 242(1B) - the duty to involve.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
European Developments Transmission Workgroup 3 rd May 2012.
SEM & Target Model Update 22 nd FUI Implementation Group Meeting London, 30 September 2011.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
How to avoid blackouts in Europe?
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
Presentation to the BSC Panel
Presentation to the BSC Panel
Distribution Workgroup 24/11/16
Review Group 291- Ofgem Update
Demand Control Field Trials
Regulators’ update on Congestion Management and Balancing
NWE Day-Ahead Price Coupling
SG meeting FR/UK/IR region 14 June 2007 Congestion management
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Trans European Replacement Reserve Exchange
Update on European Network Codes
UNC Modification Proposal 0373
Transmission Workgroup 6th March 2014
Review Group 291- Ofgem Update
Proposed Transitional Gas Exit Arrangements
Options for the Development of a Demand Side Response Mechanism
Presentation transcript:

Cross Border Balancing - 2Hr Product NGET and RTE Paper

Overview  NGET & RTE action at 22 nd March FUI IG meeting to provide a summary paper on 2hr product addressing –  NGET requirement for a 2hr product  Assessment of the impact of BALIT solution without a 2hr product  RTE’s concerns with a 2hr CBB product  Propose Alternative Solution

NGET Requirements for Long Duration (> 1hr) Products  The current CBB Interim arrangements are utilised for Energy, Margin, Contingency and Constraint management considerations  Provisions allow agreement of ‘non-rigid’ transactions which may be > 1hr -  Avoids commitment of alternative high cost actions e.g. additional generation synchs  Allows peak demand points to be efficiently managed  CBB transactions play an important role in managing Southern Network constraints, including London security, due to the strategic location of IFA  Dayahead exchange of data allows CBB to be ‘firmly’ assumed in Operating Plans to offset other contingent actions e.g. warming

NGET Proposal for a 2Hr CBB Product  The BALIT 1 hr arrangements would allow CBB to be utilised against other in-gate BM actions but not against long notice actions or longer duration requirements.  NGET proposed inclusion of a 2 Hr product with a 2 hrs lead time to increase the opportunities for BALIT to be utilised for broader system balancing purposes -  2 hrs duration being generally sufficient to cover most operational requirements  2 hrs Lead time would allow opportunity to avoid commitment of alternative actions

NGET Assessment if no 2hr Provisions Available  Lack of 2Hr Provisions could be managed through reliance on alternative actions but would result in increased costs –  Increased Operating Plan Contingency costs in the form of generation warming  Assessment of 09/10 Plans has highlighted a £6.98m saving through inclusion of CCB as contingency in SOPs  Increased BMU commitment for margin and/or constraint reasons  Assessment of 09/10 Plans substituting CBB with replacement generation, allowing for a typical minimum run time of 3.5, would have increased the full year operating costs by £27m

Concerns of RTE  2hr product in parallel with standard 1hr product would  Jeopardize further extension of standard mechanism to other borders  Lead to over-inflated prices and make standard product offered to other TSOs more scarce  Could lead to sub-optimal operation of Balancing Management in France and, in some particular cases, to endanger the Security of Supply of the French Transmission System

Alternative Solution – ‘BALIT Extension’  New proposal to achieve 2 hr delivery through enhanced obligations around the BALIT arrangements -  TSO to inform as soon as possible if the ‘BALIT Extension’ service is to be withdrawn in keeping with the existing good practices  Acquiring TSO gives notice of intent by no later than 2 hours ahead  Acquiring TSO activates BALIT volume in the first hour  If no BALIT volume in 2 nd hour then Delivering TSO will deliver energy through the ‘BALIT Extension’ service and settle at a pre-agreed Excess Energy price  With these enhanced obligations CBB can be assumed in Operating Plans unless rejected at the requesting stage.  It is proposed to maintain this ‘BALIT Extension’ service until 1 st April 2012  This will allow a detailed review to be undertaken after 1 year  It is proposed that the service will terminate on 1 st April 2012 such that any extension of these arrangements beyond this date would require common agreement between Ofgem, CRE, NGET and RTE

Alternative Solution – ‘BALIT Extension’