7 Apr 2010Paul Dauncey1 Tech Board: DECAL beam test at DESY, March 2010 Paul Dauncey.

Slides:



Advertisements
Similar presentations
Monolithic Active Pixel Sensor for aTera-Pixel ECAL at the ILC J.P. Crooks Y. Mikami, O. Miller, V. Rajovic, N.K. Watson, J.A. Wilson University of Birmingham.
Advertisements

J.A. Ballin, P.D. Dauncey, A.-M. Magnan, M. Noy
23 Jul 2008Paul Dauncey1 TPAC 1.1 vs TPAC2.0 vs TPAC2.1 Paul Dauncey.
SPIDER Silicon Pixel Detector R&D  Birmingham University (N. Watson, J. Wilson, R. Staley), Bristol University (J. Goldstein, D. Cussans, R. Head, S.
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
Jaap Velthuis, University of Bristol SPiDeR SPiDeR (Silicon Pixel Detector Research) at EUDET Telescope Sensor overview with lab results –TPAC –FORTIS.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
10 Nov 2004Paul Dauncey1 MAPS for an ILC Si-W ECAL Paul Dauncey Imperial College London.
9 Sep 2005MAPS - Paul Dauncey1 Monolithic Active Pixel Sensors Paul Dauncey Imperial College London.
Slide 1 Diamonds in Flash Steve Schnetzer Rd42 Collaboration Meeting May 14.
17 May 2007LCWS analysis1 LCWS physics analysis work Paul Dauncey.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
CLIC Collaboration Working Meeting: Work packages November 3, 2011 R&D on Detectors for CLIC Beam Monitoring at LBNL and UCSC/SCIPP Marco Battaglia.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
SPiDeR  First beam test results of the FORTIS sensor FORTIS 4T MAPS Deep PWell Testbeam results CHERWELL Summary J.J. Velthuis.
PASI 2013, 3 rd – 5 th April 2013, RAL 03-Apr-2013Fergus Wilson, STFC/RAL1 UK Silicon Digital Calorimetry.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
First Results from Cherwell, a CMOS sensor for Particle Physics By James Mylroie-Smith
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
15 Dec 2010 CERN Sept 2010 beam test: Sensor response study Chris Walmsley and Sam Leveridge (presented by Paul Dauncey) 1Paul Dauncey.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
26 Jan 2010Paul Dauncey1 DESY beam test preparations Paul Dauncey.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
Lepton Collider Increased interest in high energy e + e - collider (Japan, CERN, China) STFC funded us for £75k/year travel money in 2015 and 2016 to re-
First tests of CHERWELL, a Monolithic Active Pixel Sensor. A CMOS Image Sensor (CIS) using 180 nm technology James Mylroie-Smith Queen Mary, University.
18 Sep 2008Paul Dauncey1 The UK MAPS/DECAL Project Paul Dauncey for the CALICE-UK MAPS group.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
16 Sep 2009Paul Dauncey1 DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups: Birmingham, Bristol, Imperial, Oxford, RAL.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
21 Jun 2010Paul Dauncey1 First look at FNAL tracking chamber alignment Paul Dauncey, with lots of help from Daniel and Angela.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Advanced Pixel Architectures for Scientific Image Sensors Rebecca Coath, Jamie Crooks, Adam Godbeer, Matthew Wilson, Renato Turchetta CMOS Sensor Design.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 2 Paul Dauncey Imperial College London.
21 Sep 2009Paul Dauncey1 Status of Imperial tasks Paul Dauncey.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 3 Paul Dauncey, Imperial College London.
26 Jan 2010Paul Dauncey1 TPAC papers Paul Dauncey.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
Rutherford Appleton Laboratory Particle Physics Department G. Villani CALICE MAPS Siena October th Topical Seminar on Innovative Particle and.
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
4 Jun 2008Paul Dauncey1 Crosstalk and laser results Paul Dauncey, Anne-Marie Magnan, Matt Noy.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
18 Sep 2008Paul Dauncey 1 DECAL: Motivation Hence, number of charged particles is an intrinsically better measure than the energy deposited Clearest with.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
9 Sep 2008Paul Dauncey1 MAPS/DECAL Status Paul Dauncey for the CALICE-UK MAPS group.
Advanced Monolithic Active Pixel Sensors with full CMOS capability for tracking, vertexing and calorimetry Marcel Stanitzki STFC-Rutherford Appleton Laboratory.
SPiDeR  Status of SPIDER Status/Funding Sensor overview with first results –TPAC –FORTIS –CHERWELL Beam test 09 Future.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford Ringberg Workshop, 8 April 2008 Pixels with Internal Storage: ISIS by LCFI.
Analysis of LumiCal data from the 2010 testbeam
for the SPiDeR collaboration (slides from M. Stanitski, Pixel2010)
FCAL R&D towards a prototype of very compact calorimeter
Update on DECAL studies for future experiments
DESY contributions to MAPS DESY testbeam
First Testbeam results
The Beam Test at Fermilab:
DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups:
CALICE: Major Items Since September
Charge diffusion model (again)
Presentation transcript:

7 Apr 2010Paul Dauncey1 Tech Board: DECAL beam test at DESY, March 2010 Paul Dauncey

7 Apr 2010Paul Dauncey 2 Main aims (Tech Board 3 Feb) SPiDeR had to be more generic than just ILC Certainly more than just ILC DECAL DECAL sensor (TPAC) not the only sensor being tested Fortis and Cherwell sensors for studying tracking applications Two main strands DECAL performance General performance of CMOS MAPS For DECAL Realistic resolution depends on charged particle density in EM shower core Predicted by simulation to be O(100/mm 2 ) but not verified at 50  m granularity Main aim this year is to measure real shower density with electrons

7 Apr 2010Paul Dauncey 3 MAPS variants (Tech Board 3 Feb) Deep P-well vs non-deep P-well Expect deep P-well to have higher collection efficiency High-resistivity vs standard silicon Collection by diffusion, so slow; O(100ns) With high-resistivity, can have electric field to suck out charge; faster, more efficient and probably more radiation hard Epitaxial layer depth; 5 vs 12 vs 18  m Changes amount of signal charge generated

7 Apr 2010Paul Dauncey 4 DESY beam test (Tech Board 3 Feb) Three weeks as main user, limited to 1-6GeV electrons Most of March; overlaps UTA collaboration meeting and LCWS10 Technically, close to a repeat of CERN beam test so “straightforward” Use EUDET telescope; DAQ integration ongoing Measure efficiency of all sensors variants available for “MIPs” Compare with CERN results with pions to check for non-MIP effects Measure shower core densities in EM showers As a function of energy and of tungsten converter depth Need accurate tracking to locate shower centre

7 Apr 2010Paul Dauncey 5 SPiDeR shifters University of Birmingham H. Bansil, T. McLaughlan, T. Price, N.Watson University of Bristol D. Cussans, J. Goldstein, R. Page, J. Velthuis University of Edinburgh H. Tabassam Imperial College London P. Dauncey University of Oxford R. Gao Rutherford Laboratory M. Stanitzki, J. Strube, G. Zhang Total: 14 people for three weeks = 54 shifts (72 person-shifts)

7 Apr 2010Paul Dauncey 6 Complete TPAC system DAQ PC USB_DAQ master Sensor mechanical support CAEN power supply USB_DAQ readout

7 Apr 2010Paul Dauncey 7 Data-taking overview 47M bunch trains × 3.2ms/bunch train = 150k sec live time = 42 hours Corresponds to 8% duty cycle overall Mainly due to DAQ rate; 40Hz bunch train rate gives 13% duty cycle Roughly 65% running, averaged over whole three weeks Accelerator maintenance period

7 Apr 2010Paul Dauncey 8 Temperature Temperature was significant issue at CERN last summer High temperatures ~40C meant sensors could lose their configuration Always below 30C at DESY Much more stable operation Jumps due to changes of mode of operation, i.e. layout of sensors in stack Hi-tech ( ) air blower

7 Apr 2010Paul Dauncey 9 EUDET telescope Not as useful as we had hoped for DECAL work Had not been run continuously since being installed at DESY Operation was rather variable for the first two weeks Heroic efforts from Ingrid and (particularly) Igor Rubinsky helped to fix it DECAL stack could not get closer than ~1m from the last telescope plane Low momentum beam so completely multiple scattering limited Resolution at DECAL sensors ~  m » sensor pixel size

7 Apr 2010Paul Dauncey 10 Tracking mode Four standard sensors in outer layers Construct tracks using these only; no need for EUDET telescope Two sensors-under-test in the inner two layers Project track to these to measure efficiency Identical method (and analysis) to CERN

7 Apr 2010Paul Dauncey 11 Tracking mode II Used adapted version of George’s semi-online monitoring E.g. number of sensor pixels firing vs pixel time difference from PMT hits All standard sensors One non-deep p-well sensor

7 Apr 2010Paul Dauncey 12 Tracking mode III Hi-res Standard CERN TypeNumber tested Standard4 Non-deep p-well2 12  m hi-res 3 18  m hi-res 2 Only fully tested two of the four variants at CERN Did all four with at least two sensors each at DESY Threshold scan for all cases

7 Apr 2010Paul Dauncey 13 Shower mode Inserted differing numbers of tungsten sheets between sensors Each sheet was 3mm, corresponding to 3/3.5mm = 0.86X 0 Fallback due to uncertainty of EUDET telescope operation Use four TPAC sensors for pre-tungsten tracking

7 Apr 2010Paul Dauncey 14 Shower mode II Sensor hit correlations for layer 3 (before tungsten) and layer 4 (after tungsten) Both vs hits in layer 0

7 Apr 2010Paul Dauncey 15 Shower mode III Also did copper (and a very small amount of iron and lead) Radiation length of copper =14.3mm (c.f. tungsten = 3.5mm) Limited for copper in number of X 0 which would fit into stack MaterialTungstenCopper 0.44X 0 0.9X 0 1.7X 0 3.4X 0 5.1X 0 6.9X 0 8.6X X 0 All done at 1, 2, 3, 4 and 5 GeV No 6 GeV beam as DESY2 only running at 6.3GeV

7 Apr 2010Paul Dauncey 16 CERN beam test, May/Sep 2010 Requested two weeks as main user, GeV electrons, 120GeV pions Also requested EUDET telescope so identical DAQ to DESY Now know it is not essential for TPAC (but is for other SPiDeR tests) Extend shower density measurements up to 100GeV Much bigger level arm; 1-100GeV rather than 1-5GeV Better check of simulation New idea: if EUDET telescope performing well Cross-check density measurements using telescope stand-alone Place tungsten between the two arms and measure hits in downstream arm Cross-check any MIP efficiencies if any variants look odd Using pions (in parallel with other SPiDeR tests) But still very limited effort available Probably can just about cover shifts Main problem would be analysis, particularly towards the end of 2010 Have a meeting in two weeks to decide if we will go ahead with beam runs