FCC Spectrum Auction Process and Automated Auction System FM Broadcast — Auction No. 37 Craig Bomberger, Associate Chief Auctions and Spectrum Access Division.

Slides:



Advertisements
Similar presentations
New Entrant Bidding Credit 4 Unique to broadcast auctions 4 Will be offered in FM Auction No. 37.
Advertisements

3/7/07 Pre - Auction Procedures Broadband PCS Auction (Auction No. 71) Lisa Stover Auctions Marketing Specialist FCC Wireless Telecommunications.
Applications to Participate: Required Information Broadband Radio Service Auction (Auction 86) Sayuri Rajapakse, Attorney, ASAD.
Auction 79 Seminar FM Broadcast Construction Permits Wire Transfer & Payment Process.
700 MHz Band Licenses Auctions 73 & 76. Disclaimer Nothing herein is intended to supersede any provision of the Commission's rules or public notices.
Tribal Lands Bidding Credits Extending Wireless Services to Tribal Lands Michael Connelly Attorney Advisor Mobility Division, Wireless Telecommunications.
Tribal Lands Bidding Credit Extending Wireless Services to Tribal Lands Phase II 220 MHz Service (Auction No. 72) Allen Barna Senior Attorney, Mobility.
FCC Spectrum Auction Process and Automated Auction System Broadband PCS — Auction No. 58 Craig Bomberger Auctions and Spectrum Access Division November.
FM BROADCAST CONSTRUCTION PERMITS AUCTION #37. Disclaimer These slides are provided by Bureau staff for informational purposes only. Nothing herein is.
BroadBand PCS Auction No. 58 Post-Auction Overview Erin McGrath Assistant Chief Mobility Division.
Overview of Service Rules: Technical and Licensing Issues Keith Harper Electronics Engineer, Mobility Division, WTB November 29, GHz Band Auction.
LOW POWER TELEVISION CONSTRUCTION PERMITS AUCTION #81 LOW POWER TELEVISION CONSTRUCTION PERMITS AUCTION #81.
Pre - Auction Process AWS-1 and Broadband PCS (Auction 78) Kathy Hostetter Deputy Division Chief FCC Wireless Telecommunications.
Exhibits for the Auction No. 55 Short-Form Application and Related Issues.
(MVDDS) Multichannel Video Distribution and Data Service Auction #53.
Tribal Lands Bidding Credits Extending Wireless Services to Tribal Lands Michael E Connelly Attorney Advisor, Mobility Division November 20, MHz.
Auction No. 69: 1.4 GHz Bands Spectrum Auction Process and Integrated Spectrum Auction System Auction No GHz Bands Roy Knowles, Auctions Analyst,
Spectrum Auction Process and Integrated Spectrum Auction System Auction No. 62 FM Broadcast Craig Bomberger, Associate Chief Auctions and Spectrum Access.
Overview of Service Rules and Due Diligence Dwain Livingston Senior Engineer Mobility Division, WTB November 1, – 1990 MHz BROADBAND PCS Auction.
MULTICHANNEL VIDEO DISTRIBUTION AND DATA SERVICE AUCTION #63.
Auction 78 Seminar AWS-1 and Broadband PCS Wire Transfer & Payment Process.
BUILDING A SPECTRUM AUCTION SYSTEM. N O N P A C K A G E B I D D I N G 1995 FIRST AUCTION BID ENTRY CHANGES NEW BID INCREMENT CALCS WEB BASED BIDDING.
MAS Auction # 59 Incumbent Licenses Due Diligence.
PHASE II 220 MHz SERVICE (AUCTION #72) Gail Glasser Auctions Accounting Group Office of Managing Director (202) Wire Transfer.
Form 175 and Overview of Auction Rules 700 MHz Band (Auctions 73 and 76) Lisa Stover, Auctions Marketing Specialist, ASAD Howard Davenport, Attorney, ASAD.
Auction Process & FCC Auction System Auction 86 Broadband Radio Service Debbie Smith Auctions and Spectrum Access Division August 5, 2009.
Tribal Lands Bidding Credits Extending Wireless Services to Tribal Lands Michael Connelly Attorney Advisor Mobility Division, Wireless Telecommunications.
Overview of Due Diligence and Post-Auction Process Michael E Connelly Attorney Advisor Mobility Division Wireless Telecommunications Bureau December 3,
LPTV and TV Translator Digital Companion Channels Auction 85 Lynne Milne, Senior Attorney Auctions and Spectrum Access Division Auction Anti-Collusion.
Exhibits for the Auction No. 59 Short-Form Application and Related Issues.
FM BROADCAST AUCTION 79 Due Diligence: Doing Your Homework.
AMTS - Auction No Federal Communications Commission Overview of Auction Process & FCC Auction System July 1, 2004 Automated Maritime Telecommunications.
Spectrum Auction Process and Integrated Spectrum Auction System Auctions 73 and MHz Band Craig Bomberger Auctions and Spectrum Access Division November.
Broadband PCS Developments Auction No. 58 Seminar.
Pre - Auction Procedures Broadband Radio Service Auction (Auction 86) Lisa Stover Auctions Marketing Specialist FCC Wireless Telecommunications.
Form 175 and Overview of Radio Service and Auction Rules Broadband PCS Auction (Auction No. 71) Lisa Stover, Auctions Marketing Specialist, ASAD Stephen.
Pre - Auction Procedures 700 MHz Band (Auctions 73 and 76) Kathy Hostetter Deputy Division Chief FCC Wireless Telecommunications.
Spectrum Auction Process and FCC’s Auction System Auction 85 LPTV and TV Translator Digital Companion Channels Roy Knowles, Wireless Telecommunications.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
Spectrum Auction Process and Integrated Spectrum Auction System Phase II 220 MHz Service (Auction No. 72) Debbie Smith, Auctions Analyst.
Licensing Matters Licensing Matters Phase II 220 MHz Service (Auction No. 72) Allen Barna Senior Attorney, Mobility Division Wireless.
Form 175 and Overview of Radio Service and Auction Rules FM Broadcast Auction (Auction 79) Lisa Stover, Auctions Marketing Specialist, ASAD Lisa Scanlan,
Auction Process & FCC Auction System Auction 79 FM Broadcast Debbie Smith Auctions and Spectrum Access Division June 16, 2009.
AUTOMATED MARITIME TELECOMMUNICATIONS SYSTEM (AMTS) AUCTION #57.
Bidder Registration Process
Post - Auction Procedures LPTV and TV Translator Digital Companion Channels (Auction 85) Linda Sanderson, Auctions Marketing Specialist FCC Wireless Telecommunications.
Wire Transfer & Payment Process Broadband Radio Service (BRS) Auction 86 Tim Dates, Financial Analyst, OMD.
Pre - Auction Process LPTV and TV Translator Digital Companion Channels (Auction 85) Linda Sanderson Auctions Marketing Specialist.
BROADBAND PCS SPECTRUM AUCTION #58 BROADBAND PCS SPECTRUM AUCTION #58.
12/6/2006 Post - Auction Procedures FM Broadcast Auction (Auction No. 70) Lisa Stover Auctions Marketing Specialist, ASAD Thomas Nessinger, Attorney Advisor,
Spectrum Auctions Spectrum Auctions Margaret Wiener Chief, Auctions & Spectrum Access Division Wireless Telecommunications Bureau April 30, 2008.
June 16, 2009 Pre - Auction Procedures FM Broadcast Auction (Auction 79) Linda Sanderson Auctions Marketing Specialist FCC Wireless.
Overview of Auction Process & Integrated Spectrum Auction System (ISAS) Low Power Television (LPTV) Auction No. 81 Jeff Crooks Auctions.
Overview of Auction Process & Integrated Spectrum Auction System (ISAS) Automated Maritime Telecommunications System (AMTS) Auction No. 61 Roy Knowles.
Overview of Auction Process & FCC Auction System Auction 78 Overview of Auction Process & FCC Auction System Auction 78 AWS-1 and Broadband PCS Roy Knowles.
Spectrum Auction Process and Integrated Spectrum Auction System Auction No MHz Air-Ground Radiotelephone Service Jeff Crooks, Auctions Analyst.
AUTOMATED MARITIME TELECOMMUNICATIONS SYSTEM LICENSES AUCTION #61 AUTOMATED MARITIME TELECOMMUNICATIONS SYSTEM LICENSES AUCTION #61.
Exhibits for the Auction No. 53 Short-Form Application and Related Issues.
12/6/2006 Pre - Auction Procedures FM Broadcast Auction (Auction No. 70) Linda Sanderson Auctions Marketing Specialist FCC Wireless.
Short-Form Application Exhibits and Related Issues.
Spectrum Auction Process and Integrated Spectrum Auction System Auction No. 70 FM Broadcast Jeff Crooks, Wireless Telecommunications Analyst, Auctions.
Columbia Gas of Ohio, Inc. Supplier Bidding Instructions | January 13 th, 2016.
Overview of Auction Process & FCC Automated Auction System February 23, 2005 Multiple Address Spectrum (MAS) Auction No. 59 Roy Knowles
4/24/2006 Form 175 and Overview of Radio Service and Auction Rules Advanced Wireless Services Auction (AWS-1) (Auction No. 66) Lisa Stover, Auctions Marketing.
Overview of Service Rules: Technical Issues Gary Devlin Engineer Mobility Division, WTB December 3, MHz SMR Auction No. 55 Seminar.
Reverse Auction (Auction 1001) Initial Commitment Workshop March 11, 2016.
Reverse Auction (Auction 1001) Initial Commitment Workshop Clock Phase: Sneak Peek of the Bidding System March 11, 2016.
900 MHz SMR - Auction No Federal Communications Commission Overview of Auction Process & FCC Automated Auction System December 3, MHz SMR.
Presentation transcript:

FCC Spectrum Auction Process and Automated Auction System FM Broadcast — Auction No. 37 Craig Bomberger, Associate Chief Auctions and Spectrum Access Division July 22, 2004

Nothing herein is intended to supersede any provision of the Commission’s rules or public notices. These slides should not be used as a substitute for a prospective applicant’s review of the Commission’s relevant orders, rules, and public notices. Prospective applicants must familiarize themselves thoroughly and remain current with the Commission’s rules relating to FM Broadcast service, rules relating to application and auction procedures, and the procedures, terms and conditions contained in the Auction No. 37 public notices. Disclaimer

Simultaneous Multiple Round (SMR) Auction Design Simultaneous — All construction permits are offered at the same time.Simultaneous — All construction permits are offered at the same time. Multiple Round — There are multiple discrete bidding rounds.Multiple Round — There are multiple discrete bidding rounds. −How many rounds? That’s determined by the auction. Bidding continues until there is one round in which nothing happens.Bidding continues until there is one round in which nothing happens. −No new bids, withdrawals, or proactive waivers.

Auction Design (continued) Bidding is confidential during a round.Bidding is confidential during a round. When a round ends, results are processed and made public.When a round ends, results are processed and made public.

Auction Design (continued) Web-Based Bidding SystemWeb-Based Bidding System −Options for telephonic bidding and connecting directly to our WAN. Click-Box BiddingClick-Box Bidding −When placing a bid, a bidder selects from bid amounts in the bidding system.

Auction Design (continued) Activity Requirements — Bidders must generally bid throughout the auction.Activity Requirements — Bidders must generally bid throughout the auction. Activity — A bidder’s new bids placed in a round and its standing high bids from prior rounds define its activity, as measured in bidding units.Activity — A bidder’s new bids placed in a round and its standing high bids from prior rounds define its activity, as measured in bidding units.

A fixed number of bidding units is assigned to each construction permit in the auction.A fixed number of bidding units is assigned to each construction permit in the auction. The bidding units for each construction permit are listed in Attachment A to the procedures public notice.The bidding units for each construction permit are listed in Attachment A to the procedures public notice. Bidding units are used to measure bidders’ activity and eligibility.Bidding units are used to measure bidders’ activity and eligibility. Bidding Units

Bidding Units and Activity In the current round we place a bid on FM042, Bayfield, CO. That gives us 10,000 bidding units of activity.In the current round we place a bid on FM042, Bayfield, CO. That gives us 10,000 bidding units of activity.

Bidding Units and Activity In the current round we place a bid on FM042, Bayfield, CO. That gives us 10,000 bidding units of activity.In the current round we place a bid on FM042, Bayfield, CO. That gives us 10,000 bidding units of activity. We also have a standing high bid on FM044, Carbondale, CO, which gives us 25,000 bidding units of activity.We also have a standing high bid on FM044, Carbondale, CO, which gives us 25,000 bidding units of activity.

Bidding Units and Activity In the current round we place a bid on FM042, Bayfield, CO. That gives us 10,000 bidding units of activity.In the current round we place a bid on FM042, Bayfield, CO. That gives us 10,000 bidding units of activity. We also have a standing high bid on FM044, Carbondale, CO, which gives us 25,000 bidding units of activity.We also have a standing high bid on FM044, Carbondale, CO, which gives us 25,000 bidding units of activity. Our current activity is 35,000 bidding units.Our current activity is 35,000 bidding units.

Eligibility — The maximum number of bidding units a bidder can bid on. A bidder establishes its eligibility with its upfront payment.A bidder establishes its eligibility with its upfront payment. Eligibility cannot be increased.Eligibility cannot be increased. Eligibility is not specific to certain construction permits. A bidder may use its eligibility on any of a number of construction permits it has selected on its 175 application.Eligibility is not specific to certain construction permits. A bidder may use its eligibility on any of a number of construction permits it has selected on its 175 application. Bidding Units and Eligibility

We select these three construction permits on our 175 and submit an upfront payment of $35,000.We select these three construction permits on our 175 and submit an upfront payment of $35,000. That gives us 35,000 bidding units of eligibility.That gives us 35,000 bidding units of eligibility. What can we bid on?What can we bid on?

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility. With 35,000 bidding units of eligibility, we can bid on any one of these construction permits.With 35,000 bidding units of eligibility, we can bid on any one of these construction permits.

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility. With 35,000 bidding units of eligibility, we can bid on any one of these construction permits.With 35,000 bidding units of eligibility, we can bid on any one of these construction permits.

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility. With 35,000 bidding units of eligibility, we can bid on any one of these construction permits.With 35,000 bidding units of eligibility, we can bid on any one of these construction permits.

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility. With 35,000 bidding units of eligibility, we can bid on any one of these construction permits.With 35,000 bidding units of eligibility, we can bid on any one of these construction permits.

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility. With 35,000 bidding units of eligibility, we can bid on more than one of these construction permits.With 35,000 bidding units of eligibility, we can bid on more than one of these construction permits.

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility. With 35,000 bidding units of eligibility, we can bid on more than one of these construction permits.With 35,000 bidding units of eligibility, we can bid on more than one of these construction permits. Placing a bid on Bayfield and a bid on Carbondale would give us 35,000 bidding units of activity.Placing a bid on Bayfield and a bid on Carbondale would give us 35,000 bidding units of activity.

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility. With 35,000 bidding units of eligibility, we can bid on more than one of these construction permits.With 35,000 bidding units of eligibility, we can bid on more than one of these construction permits. Placing a bid on Bayfield and a bid on Center would give us 25,000 bidding units of activity.Placing a bid on Bayfield and a bid on Center would give us 25,000 bidding units of activity.

Bidding Units and Eligibility We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility.We can bid on any construction permits we have selected on our 175 as long as our activity does not exceed our current eligibility. With 35,000 bidding units of eligibility, we can bid on more than one of these construction permits.With 35,000 bidding units of eligibility, we can bid on more than one of these construction permits. We cannot bid on both Carbondale and Center. That would give us 40,000 bidding units of activity.We cannot bid on both Carbondale and Center. That would give us 40,000 bidding units of activity.

Activity Requirement The activity requirement is the minimum number of bidding units a bidder must be active on.The activity requirement is the minimum number of bidding units a bidder must be active on. “In each round of the auction, a bidder… is required to be active on construction permits representing 100% of its current eligibility.”“In each round of the auction, a bidder… is required to be active on construction permits representing 100% of its current eligibility.” (DA , page 27)

Activity Requirement What if you do not meet the activity requirement? One of two things will happen: You will use an activity rule waiver.You will use an activity rule waiver.or Your eligibility will be reduced.Your eligibility will be reduced.

Activity Rule Waivers Each bidder will be provided five activity rule waivers.Each bidder will be provided five activity rule waivers. Use of an activity rule waiver preserves a bidder’s current eligibility despite the bidder’s activity in the current round being below the required level.Use of an activity rule waiver preserves a bidder’s current eligibility despite the bidder’s activity in the current round being below the required level. When a bidder uses an activity rule waiver, the waiver applies to that round of bidding, not to a particular construction permit.When a bidder uses an activity rule waiver, the waiver applies to that round of bidding, not to a particular construction permit.

Automatic Waivers The system will automatically apply a waiver for a bidder at the end of any round in which the bidder’s activity is below the required level unless: The bidder has no more activity rule waivers.The bidder has no more activity rule waivers.or The bidder reduces eligibility.The bidder reduces eligibility. (More on this in a few minutes.)

Automatic Waivers We have 35,000 bidding units of eligibility.We have 35,000 bidding units of eligibility.

Automatic Waivers We have 35,000 bidding units of eligibility.We have 35,000 bidding units of eligibility. We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units.We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units.

Automatic Waivers We have 35,000 bidding units of eligibility.We have 35,000 bidding units of eligibility. We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units.We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units. At the end of the round, the system automatically applies one of our activity rule waivers.At the end of the round, the system automatically applies one of our activity rule waivers.

Proactive Waivers Bidders can apply activity rule waivers proactively.Bidders can apply activity rule waivers proactively. The important difference between an automatic waiver and a proactive waiver is that a proactive waiver keeps the auction open.The important difference between an automatic waiver and a proactive waiver is that a proactive waiver keeps the auction open. Bidding continues until there is one round in which nothing happens.Bidding continues until there is one round in which nothing happens. −No new bids, withdrawals, or proactive waivers.

Eligibility Reduction What if a bidder does not meet the activity requirement and does not have any waivers left? The bidder’s current eligibility will be permanently reduced, possibly eliminating the bidder from further bidding in the auction.

Eligibility Reduction We have 35,000 bidding units of eligibility and no waivers.We have 35,000 bidding units of eligibility and no waivers.

Eligibility Reduction We have 35,000 bidding units of eligibility and no waivers.We have 35,000 bidding units of eligibility and no waivers. We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units.We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units.

Eligibility Reduction We have 35,000 bidding units of eligibility and no waivers.We have 35,000 bidding units of eligibility and no waivers. We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units.We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units. At the end of the round, the system reduces our eligibility to 15,000 bidding units.At the end of the round, the system reduces our eligibility to 15,000 bidding units.

Eligibility Reduction We have 35,000 bidding units of eligibility and no waivers.We have 35,000 bidding units of eligibility and no waivers. We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units.We place a bid on the construction permit for Center, CO, and we do not have any standing high bids. Our activity for the round is 15,000 bidding units. At the end of the round, the system reduces our eligibility to 15,000 bidding units.At the end of the round, the system reduces our eligibility to 15,000 bidding units. We no longer have enough eligibility to bid on Carbondale.We no longer have enough eligibility to bid on Carbondale.

Side Note on Bid Amounts

For activity and eligibility, the dollar amount of a bid does not matter.For activity and eligibility, the dollar amount of a bid does not matter. How much can you bid? Any one of nine pre-defined dollar amounts.How much can you bid? Any one of nine pre-defined dollar amounts. The upfront payment does not constrain how much you may bid for a construction permit.The upfront payment does not constrain how much you may bid for a construction permit.

What if you change your mind? You can remove a bid you placed during the current round. If you place a bid during a round and then remove that bid before the end of the round, it’s as if it never happened.You can remove a bid you placed during the current round. If you place a bid during a round and then remove that bid before the end of the round, it’s as if it never happened. You can withdraw standing high bids from prior rounds. Bid withdrawals have limits and consequences:You can withdraw standing high bids from prior rounds. Bid withdrawals have limits and consequences: −Each bidder is limited to withdrawals in no more than two rounds. −Withdrawals are subject to the bid withdrawal payments specified in 47 C.F.R. § (g).

For a Positive Auction Experience Do your homework. Read the public notices related to this auction.Read the public notices related to this auction. Participate in the mock auction. Test backup bidding arrangements and activate all of your SecurID cards. Use telephonic to ask “what if” questions.Test backup bidding arrangements and activate all of your SecurID cards. Use telephonic to ask “what if” questions. Check for and read all announcements. Bidding schedule changesBidding schedule changes Bid early! Print bid confirmations.Print bid confirmations.

Agenda for Software Demonstration 1.Public screens: Home, Results 2.Log in 3.Additional screens: Bidding, Admin 4.Bid 5.Remove Bid 6.Withdraw Bid 7.Reduce Eligibility 8.Proactive Waiver 9.Submit Suggestion (and other communications)

The SecurID Card Multiple cards sent to all bidders. Random number refreshes every 60 seconds. Includes a countdown indicator. Please return to the FCC for recycling.