06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.

Slides:



Advertisements
Similar presentations
Thermal Tests Analysis of transient response Elena Daskalaki Alex Vamvakas Athanasios Zelios.
Advertisements

Two Beam Module Thermo-mechanical tests Elena Daskalaki Alex Vamvakas Athanasios Zelios.
Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
LCWS12, 25/10/ CLIC two-beam module development Status and future plans G. Riddone Outlook Short introduction CLIC Module Validation program Future.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
TMM of the CLIC Two-Beam Module T0 in the LAB – Proceedings to structural FEA Riku Raatikainen
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Gy. Bognár 1, P. Fürjes 2, V. Székely 1, M. Rencz 3 TRANSIENT THERMAL CHARACTERISATION OF HOT PLATES &of MEMS MOEMS MicReD Ltd., Budapest, Hungary.
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
«BE-RF-PM» Updates on thermal tests for CLIC prototype module type 0 Ioannis Kossyvakis, Roberto Mondello, Fabrizio Rossi.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
1 Updates on thermal tests Updates on thermal tests F. Rossi September 5, 2012.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1 04-December-2013 BE-RF-PM CLIC MODULE Procedure for the thermal and alignment testing of CLIC duty cycles Written by: Elena Daskalaki Checked by: Alexander.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
CLIC Prototype Test Module 0 Super Accelerating Structure Thermal Simulation Introduction Theoretical background on water and air cooling FEA Model Conclusions.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning G. Riddone, F. Rossi Introduction Thermal tests 1.Environment 2.Heating and.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
Updated Thermo-Mechanical Model of the CLIC Two-Beam Module Riku Raatikainen
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
«BE-RF-PM» CLIC prototype two-beam modules Thermal test planning Fabrizio Rossi.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
CLIC activity of R.Raatikainen Feb 20121R.Raatikainen BE-RF-PM Main tasks  Thermo-mechanical modeling of the CLIC/LAB two-beam modules 
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
1 12-February-2014 BE-RF-PM CLIC MODULE Preparation for the duty cycles Written by: Elena Daskalaki Checked by: Alexander Samochkine Approved by: Germana.
«BE-RF-PM» 1 Wire Ø0.08mm CLIC TBM Booth Posters Modules Line (1:10) AS and PETS samples RF components, vacuum equipment Supporting, magnets,
Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
Proportional and Servo Valves
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
19-SEP-2012 «BE-RF-PM» Modelling of hydraulic system of CLIC prototype module type 0 Shoaib Azhar.
Two-beam module layout
CLIC Parameter Working Group Two Beam Module Design
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
F. Audinet, C. Martel : Cern GS-SE-HE
CLIC module working group
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Module roadmap to end of 2017
Thermal review of CLIC module
TBM thermal modelling status
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
Experimental program for module array
Motor-CAD Software General Presentation
Thermal test (lab modules)
Presentation transcript:

06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R. Mondello, F. Rossi

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 2 CONTENT Introduction, aim and strategy Test stand Experimental results

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 3 Introduction

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 4 CLIC Test Modules TBM Lab Demonstration of the two-beam module design This implies: -the assembly and integration of all components and technical systems, such as RF, magnet, vacuum, alignment and stabilization, in the very compact 2-m long two-beam module -validation of the thermal and mechanical module behavior Two-beam test stand (PETS and ac. structures) TBM CLEX Demonstration of the two-beam acceleration with one PETS and one accelerating structure at nominal parameters in CLEX Demonstration of the two-beam acceleration with two-beam modules in CLEX Address other feasibility issues in an integrated approach

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 5 CLIC Test Modules TM0#1 1) Under test 3) Components under procurement and assembly 4) Last module – few components under procurements TM1 TM0#2 TM4 2) Under assembly and installation

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 6 Aim Temperature o Map in the module o Variations with operating modes and environmental conditions o Simulation of the real tunnel environment (e.g. air flow, ambient temperature) o Time constants Functionality of the cooling system

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 7 Thermal test steps Temperature and alignment measurements to debug the system and to investigate the thermo-mechanical behaviour: o Heating of single components o Heating of all systems Simulation of CLIC duty cycles Comparison with FEA model Parameters which can be varied: o Ambient temperature o Air speed o Heat power

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 8 Thermal test program STEP 0 - WPS MEASURING SYSTEM TEST Air speed: from 0.3 to 0.8 m/s STEP 1 - ENVIRONMENTAL HEATING Ambient temperature: 20, 30 and 40 °C STEP 2 - HEATING ACCELERATING STRUCTURES AND LOADS Ambient temperature: 20 and 40 °C Air speed: 0.4 and 0.8 m/s Heat power variation STEP 3 - HEATING PETS, RF NETWORK AND DBQ Ambient temperature: 20 and 40 °C Air speed: 0.4 and 0.8 m/s Heat power variation STEP 4 - HEATING ALL MODULE Ambient temperature: 20 and 40 °C Air speed: 0.4 and 0.8 m/s Heat power variation 1. STEPS (alignment and temperature measurements) 2. CLIC duty cycle simulation CLIC nominal operation mode scenarios Failure scenarios (ex. accelerating structures breakdown) infrared camera

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 9 Test Stand

06-November-2013 Thermo-Mechanical Tests BE-RF-PM TEST STAND: heating system The heat power dissipation is reproduced by using electric heaters DBQ cartridge heaters Load heating jackets AS straight tubular heater Max heat power dissipation [7.58 kW] componentheat power (W) AS410 PETS110 DBQ150 CL178

06-November-2013 Thermo-Mechanical Tests BE-RF-PM TEST STAND: cooling system CL = Compact Load CV = Control Valve FT = Flow Transducer HV = Hand Valve PRV = Pressure Regulating Valve SAS = Super Accelerating Structure WG = RF network waveguide PETS are cooled in series with the RF network waveguides and the hybrid loads. Each super accelerating structure is cooled in series with the corresponding loads; the 4 super accelerating structures are cooled in parallel. The cooling system for DBQ is not present in this first test. Possibility to integrate it in the future.

06-November-2013 Thermo-Mechanical Tests BE-RF-PM TEST STAND: temperature sensors TS1 TS2TS3TS4TS5TS6 TS7 TS29.C TS29.ATS29.B TS29.D TS29.E Accelerating Structure and compact loads RTD sensor PT 100 (4-wire resistance) Accuracy = ± 0.1 °C

06-November-2013 Thermo-Mechanical Tests BE-RF-PM TEST STAND: temperature sensors TS23 TS17 TS18 TS19 TS20 TS21 TS22 TS24 TS25 TS26 TS36 TS35 TS34 TS33 TS33.E PETS and RF network

06-November-2013 Thermo-Mechanical Tests BE-RF-PM TEST STAND: temperature sensors TS39 TS41 TS38 TS40 TS TS43 TS45 TS44 TS38 TS40 TS39 TS48 TS50 TS49 AIR TEMPERATURE MEASUREMENT AROUND THE MODULE 3 cross sections 5 thermocouples for each cross section

06-November-2013 Thermo-Mechanical Tests BE-RF-PM TEST STAND: layout AS heater PETS heater Temperature sensors SUPPORTING FRAME FOR COOLING SYSTEM COMPONENTS WATER CHILLER ELECTRONICS FOR HEATING AND COOLING SYSTEM POWER SOCKET Max. 64 A POWER SOCKET Max. 64 A POWER SOCKET Max. 32 A POWER SOCKET Max. 32 A ELECTRIC NETWORK AUL SYSTEM

06-November-2013 Thermo-Mechanical Tests BE-RF-PM TEST STAND: HVAC AIR FLOW Cooling coils Heating coils AIR CIRCULATION Air speed sensors installed in the middle of the room Air speed sensors transport test The ceiling is movable for the transport test Range for air temperature and speed:  T air = °C  v air = m/s

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 17 Experimental results

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS Temperature measurements by varying: heat power ambient temperature air speed In total about 30 measurements (analysis still under way)

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS: power variation at 20 °C Surface temperature o Average: 28.0 °C o Max: 28.6 °C Average water temperature increase per SAS: +3 °C T amb = 20 °C, v air = 0.4 m/s, V SAS = m 3 /h Heat power: 50% Heat power: 100% Surface temperature o Average: 31.4 °C o Max: 32.1 °C Average water temperature increase per SAS : +6.3 °C Transient time from 50% to 100%: ~ 20'

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS: power variation at 20 °C T amb = 20 °C, v air = 0.4 m/s, V PETS = m 3 /h Heat power: 50% Heat power: 100% Surface temperature o Average: 26.4 °C o Max: 27.2 °C Water temperature increase after PETS: +2.2 °C Surface temperature o Average: 29.0 °C o Max: 30.7 °C Water temperature increase after PETS: +5.8 °C Transient time from 50% to 100%: ~ 40'

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS: power variation at 20 °C For the SAS: o The thermal response is linear with the heat power o The transient time to reach the steady-state conditions is about 20' o At full power the temperature gradient along the SAS is about 3 °C o The temperature is increasing from the first SAS to the last one o Part of the heat power generated inside the module is dissipated into the air For the PETS: o The transient time to reach steady-state conditions is about 40' o The temperature is increasing from the first PETS unit to the second one o Part of the heat power generated inside the module is dissipated into the air

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS: power variation at 40 °C Surface temperature o Average: 29.0 °C o Max: 29.9 °C Average water temperature increase per SAS: +4.8 °C Surface temperature o Average: 32.0 °C o Max: 32.7 °C Average water temperature increase per SAS: +8.2 °C T amb = 40 °C, v air = 0.4 m/s, V SAS = m 3 /h Heat power: 50% Heat power: 100%

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS: power variation at 40 °C T amb = 40 °C, v air = 0.4 m/s, V PETS = m 3 /h Heat power: 50% Heat power: 100% Surface temperature o Average: 32.2 °C o Max: 34.0 °C Water temperature increase after PETS: +5.4 °C Surface temperature o Average: 34.7 °C o Max: 37.1 °C Water temperature increase after PETS : +8.4 °C

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS: power variation at 40 °C At T amb = 40 °C the heat is flowing from the ambient to the structures. The measured temperatures at T amb = 40 °C are higher than at T amb = 20 °C o SAS surface temperature (at full power): °C o PETS surface temperature (at full power): °C

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS: validation of the numerical modelling Central vacuum tank (shell elements) Cooling channel (linear element) SAS (solid elements) Bellow (spring elements) Finite elements modelling of CLIC prototype module type 0 The thermo-mechanical modelling takes into account: o Heat loads o Cooling system o Heat transfer to air o Gravity o Vacuum

06-November-2013 Thermo-Mechanical Tests BE-RF-PM EXPERIMENTAL RESULTS: validation of the numerical modelling FEA INPUT 1.Inlet temperature of water 2.Water flow rate 3.Ambient temperature 4.Air speed 5.Heat power for SAS, PETS, CL and DBQ 1.Discrete temperature 2.Beams axis misalignments (comparison with SU measurements) OUTPUT surface temperaturewater temperaturebeam axis misalignments

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 27 CONCLUSIONS The module has been successfully tested at 100% of the total heat power. The experimental results show that:  The influence of the air speed on the resulting temperatures is less than 1 °C for the two air speeds considered.  Part of the heat power generated inside the module is dissipated into the air (detailed analysis under way).  At T amb = 20 °C the heat power is flowing from the structure into the air, it is the opposite at T amb = 40 °C. The validation of the numerical modelling is currently in progress. The preliminary comparison with the experimental results shows a slight overall discrepancy of ~2 °C between the predicted and measured temperatures. Next step: simulation of CLIC duty cycles, as defined at the CMWG on Sept. 18, From nominal operation mode to failure scenarios:  Accelerating structure breakdown  PETS breakdown

06-November-2013 Thermo-Mechanical Tests BE-RF-PM 28 LINKS List of documents available in EDMS (CLIC Technical design -> Thermal Test program): An analytical model to describe the experimental results ( Temperature measurements for MB and DB ( Simulation of CLIC Duty Cycles (Nick Gazis, CLIC Test Module Meeting on Sept. 18, 2013)