J. Alessi Overview EBIS Project Technical Review 1/27/05 An EBIS-based RHIC Preinjector - Overview Jim Alessi Preinjector Group Collider-Accelerator Department.

Slides:



Advertisements
Similar presentations
Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
Advertisements

Ion Accelerator Complex for MEIC January 28, 2010.
Preinjector Group Collider-Accelerator Department
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
ALPHA Storage Ring Indiana University Xiaoying Pang.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Carbon Injector for FFAG
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
E. Beebe Test EBIS Results EBIS Project Technical Review 1/27/2005 An EBIS-based RHIC Preinjector - Test EBIS Results Ed Beebe Preinjector Group Collider-Accelerator.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
Brookhaven EBIS program: operation and development
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
J. Alessi RF Structures EBIS Project Technical Review 1/27/05 RF Structures J. Alessi Some general thoughts on what our approach will be.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
A mass-purification method for REX beams
11 Brookhaven National Laboratory RHIC – Highly flexible and only US Hadron Collider NSLS II – One of the world's most advanced synchrotron light sources.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
D. Raparia2005/01/27-28 MAC Review EBIS Injector Linac Optics I I D.Raparia EBIS Review 2005/01/27-28 HEBT Booster Injection.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Beam Preparation, Task 9 Department of Physics, University of Jyväskylä.
1 RHIC NSRL LINAC Booster AGS Tandems STAR 6:00 o’clock PHENIX 8:00 o’clock 10:00 o’clock Polarized Jet Target 12:00 o’clock RF 4:00 o’clock (AnDY, CeC)
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
NICA injection complex status
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
JLEIC ion source: specifications, design, and R&D prospects
A. Martynov on behalf of accelerator division.
Progress in the Multi-Ion Injector Linac Design
How to run ions in the future?
A. Plastun¹, B. Mustapha, Z. Conway and P. Ostroumov
EffiCAS Efficient Facility for Ions at CAS
ELIC Injector Working Group High-P, high-I source issues (DC)
Pulsed Ion Linac for EIC
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Physics Design on Injector I
(Beam) Commissioning Plan
Status of the JLEIC Injector Linac Design
Ion bunch formation options for 400GeV JLEIC
JLEIC 200 GeV ion beam formation options
Multi-Ion Injector Linac Design – Progress Summary
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
RF system for MEIC Ion Linac: SRF and Warm Options
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

J. Alessi Overview EBIS Project Technical Review 1/27/05 An EBIS-based RHIC Preinjector - Overview Jim Alessi Preinjector Group Collider-Accelerator Department Motivation Requirements Intensity, species, q/m, energy, operating modes, … General comments on design choices Project status

J. Alessi Overview EBIS Project Technical Review 1/27/05 EBIS - Overview Presently, one or two ~35-year old Tandem Van de Graaff accelerators are used for RHIC pre-injection, but the recent advances in the state of the art in EBIS performance by more than an order of magnitude now make it possible to meet RHIC requirements with a modern linac-based preinjector. BNL now has DOE CD0 approval for new pre-injector for RHIC based on the Laboratory’s development of an advanced Electron Beam Ion Source (EBIS). The new preinjector would consist of an EBIS high charge state ion source, a Radio Frequency Quadrupole (RFQ) accelerator, and a short linac.

J. Alessi Overview EBIS Project Technical Review 1/27/05 Two Tandems presently serve as RHIC preinjectors

J. Alessi Overview EBIS Project Technical Review 1/27/05

J. Alessi Overview EBIS Project Technical Review 1/27/05 EBIS Tandem to Booster transport line is 860 m long. 44 quadrupoles 71 steering dipoles 6 large dipoles 25 multiwires 20 Faraday cups Dozens each of pumps, vacuum valves, vacuum gauges, etc. The transport from the EBIS to the Booster will be only 30 m long!

J. Alessi Overview EBIS Project Technical Review 1/27/05 Heavy Ion Preinjector for RHIC The Tandem Van de Graaff is the present RHIC preinjector. Until our recent EBIS development, it was the only option which could meet RHIC requirements, and while presently it is quite reliable, it has disadvantages m transport line to Booster Stripping foils at terminal and high energy lead to intensity & energy spread variations Injection over > 40 turns is required Limitations on ion species (must start with negative ions) High maintenance, manpower Obsolete equipment requires upgrading

J. Alessi Overview EBIS Project Technical Review 1/27/05 MODEPREINJECTOR OPERATION Dedicated RHIC running; same species in both rings 5 Hz, 4 pulses every ~3 seconds; single Tandem Dedicated RHIC running; two species5 Hz, 4 pulses every ~3 seconds; 2 minute switching time between species; two Tandems Dedicated NSRL running~0.3 Hz; single Tandem RHIC single species & NSRL same species, energy, charge state 5 Hz, 4+1 pulses every ~3 seconds; single Tandem RHIC single species; NSRL different species of same magnetic rigidity 4 pulses at 5 Hz, ~1.5 second switching, then 1 NSRL pulse; two Tandems RHIC single species; NSRL different species of different rigidity ~2 minute switching; two Tandems To improve upon the present Tandem performance, it is desirable for the preinjector to be able to switch both species and transport line rigidity in ~1 second, so that there are no restrictions on compatibility between RHIC and NSRL operations. REQUIREMENTS Requirement for RHIC (one example) : 1.7 emA of Au 32+, 10 µs; 5 Hz plus….NSRL (NASA Space Radiation Laboratory) – interleaved second beam at 5 Hz: He 2+, C 6+, O 8+, Si 14+, Ti 18+, Fe 21+, Cu 22+, all at ~2-3 emA, ~ 10 µs --- short pulses, fast beam changes, any species

J. Alessi Overview EBIS Project Technical Review 1/27/05 The present control system supports “pulse-to-pulse modulation” The setpoint of any device can be changed pulse-to-pulse, depending on the “user”. So, within 1 second: the source (EBIS) has to change species, the RFQ and linac have to change gradient (amplitude) transport line elements have to switch to new values

J. Alessi Overview EBIS Project Technical Review 1/27/05 Intensity required at injection into the Booster, for RHIC: Au 32+ : 2.7 x 10 9 ions per pulse. (8.6 x charges/pulse). Sufficient to achieve 1.2 x 10 9 ions per bunch in RHIC. D : 2.5 x ions/pulse. (will be produced from a plasma source, for convenience). Cu 11+ : 1.4 x ions/pulse. (1.5 x charges/pulse) SpeciesQIons/pulseCharges/pulse (Booster output) C5+1.2 x x O8+4 x x Si13+3 x x Ti18+8 x x Fe20+1 x x Beams for NSRL With a present efficiency from Booster injection to extraction of ≥ 60% (EBIS should be better), one needs ≤ charges/pulse in all cases for NSRL. With a trap capacity in the EBIS of charges, these intensities should be readily achievable.

J. Alessi Overview EBIS Project Technical Review 1/27/05 SpeciesHe to U Intensity in desired charge state≥ 1 x charges/pulse Charge-to-mass ratio, Q/m≥ 1/6 Repetition rate5 Hz Pulse width10 – 40 µs Switching time between species1 second Output energy2 MeV/amu Emittance (full beam, normalized)≤ 1.4 π mm mrad Momentum spread, dp/p≤ ± 0.05% Summary of Performance Specifications Injection energy: 2 MeV/amu. Present tandem injection is at 0.92 MeV/amu for Au. At this energy, there is a significant beam loss due to electron capture during Booster injection. By raising the injection energy to 2 MeV/amu, the capture cross section is reduced by a factor of In addition, the higher energy reduces the space charge tune shift at injection, which might be important at these higher peak currents. At even higher injection energies one would approach the voltage limit of the inflector, and losses due to ionization would begin to become important.

J. Alessi Overview EBIS Project Technical Review 1/27/05 12 MV LINAC The EBIS preinjector offers the following benefits: Improvements in reliability, setup time, and stability should lead to increased integrated luminosity in RHIC Reduced operating costs, and avoidance of ~ 9 M$ in reliability-driven investments in the tandems Elimination of two stripping stages and an 860 m long transport line, leading to improved performance Simplification of Booster injection (few turn vs. present 40 turn) Increased flexibility to handle the multiple simultaneous needs of RHIC, NSRL, and AGS Capability to provide ions not presently available, such as noble gas ions (for NSRL), uranium (RHIC), or, with additional enhancements, polarized 3 He (eRHIC) (the Tandems must start with negative ions) Simpler technology, robust, more modern (Tandem replacement parts becoming difficult to get)

J. Alessi Overview EBIS Project Technical Review 1/27/05 4 m 4.3 m RFQ: keV/u; 100 MHz Linac: MeV/u; 100 MHz Proposed Linac–Based RHIC Preinjector

J. Alessi Overview EBIS Project Technical Review 1/27/05 Linac-based Preinjector - Source “requirements” 1. Intensity for 1 x 10 9 Au ions/bunch in RHIC : ~ 3.4 x 10 9 Au 32+ ions/pulse from the source 2. No stripping before Booster injection : q/m > 0.16 (Au 32+, Si 14+, Fe 21+ ) turn injection into Booster : pulse width  s (Note - 1 & 3 result in a Au 32+ current of mA) 4. Rep rate : ~ 5 Hz 5. Emittance :  0.2  mm mrad, normalized, rms (for low loss at Booster injection)

J. Alessi Overview EBIS Project Technical Review 1/27/05 Radial trapping of ions by the space charge of the electron beam. Axial trapping by applied electrode electrostatic potentials. Ion output per pulse is proportional to the trap length and electron current. Ion charge state increases with increasing confinement time. Charge per pulse (or electrical current) ~ independent of species or charge state! EBIS

J. Alessi Overview EBIS Project Technical Review 1/27/05 Ions are extracted from an EBIS in pulses of constant charge; one has control over the pulse width Charge state is selected by choosing the confinement time of ions in the trap

J. Alessi Overview EBIS Project Technical Review 1/27/05 EBIS Test Stand

J. Alessi Overview EBIS Project Technical Review 1/27/05

J. Alessi Overview EBIS Project Technical Review 1/27/05 RHIC EBIS Design changes relative to the Test EBIS, needed to meet RHIC requirements: 1. Longer SC solenoid and ion trap region 2. Collector design for higher average power Improvements to increase operational reliability and safety margin: 3. Collector design for higher peak power 4. Electron gun capable of 20 A operation 5. Increases to the solenoid bore and maximum field

J. Alessi Overview EBIS Project Technical Review 1/27/05

J. Alessi Overview EBIS Project Technical Review 1/27/05 ECR Features, advantages ~ the only choice for high current, high Q, dc applications Reliable; lots of operating ECRs, lots of experience Technologies SC magnets; At high freq's, need SC sol and SC hexapole 28 GHz VENUS - 4 T injection field, 2 T hexapole at plasma chamber RF power source - 28 GHz gyrotron, kW; plus sometimes multiple frequencies Questions, issues? Broad charge state distribution, so one has to extract & transport a high total current Performance depends on species, favoring gases and low melting point solids “Memory” effects, slower beam switching times

J. Alessi Overview EBIS Project Technical Review 1/27/05 LIS Features, advantages Produces high currents, short pulses Technologies High power laser – 100 J, CO 2, ns Optics Targets – 3 x W/cm 2 on the target Questions, issues? Laser reliability, rep rate Pulse-to-pulse current fluctuations Target erosion; coating of optics by target material Species ~ limited to solid targets, high melting point solids are best

J. Alessi Overview EBIS Project Technical Review 1/27/05 EBIS at different pulse widths ECR LIS, short pulses Comment (qualitative) ….

J. Alessi Overview EBIS Project Technical Review 1/27/05 RFQ: 100 MHz, 4 rod design is conventional. Very similar to GSI, CERN, etc. Deepak’s talk – 17 keV/u injection energy chosen to reduce space charge problems in LEBT. LINAC: IH structure chosen, very similar to CERN Pb linac. (conventional baseline design). SCL was considered, but abandoned since it is not required to meet design requirements, it has higher cost, and the technology is less familiar in Collider-Accelerator, so would increase operational burden.

J. Alessi Overview EBIS Project Technical Review 1/27/05 Planned location at the end of the 200 MeV linac

J. Alessi Overview EBIS Project Technical Review 1/27/05 The EBIS, operating with a 10 A electron beam, will produce in excess of 5 x charges/pulse, for any desired species. For heavy ions, ~20% of these ions will be in the desired single charge state, while for light ions this fraction can reach ~ 50%. In addition, key components (electron gun and collector) will be designed with the capability of operating at up to 20 A electron beam current, so one will have the potential of a factor of 1.6 improvement with further developments.

J. Alessi Overview EBIS Project Technical Review 1/27/05 EBIS RFQ LINAC BOOSTER STRIPPER FOIL AGS Au 32+ Au keV/u3.4 x 10 9 ions 300 keV/u3.0 x 10 9 ions 2 MeV/u2.7 x 10 9 ions 70 MeV/u2.3 x 10 9 ions 70 MeV/u1.4 x 10 9 ions 9 GeV/u1.2 x 10 9 ions STRIPPER FOIL RHIC Au 77+ Au % 85% 60% 90% 100% 9 GeV/u1.2 x 10 9 ions (=8.6e10 charges) (=1e11 charges)

J. Alessi Overview EBIS Project Technical Review 1/27/05 Intensity required at injection into the Booster, for RHIC: Au 32+ : 2.7 x 10 9 ions per pulse. (8.6 x charges/pulse). Sufficient to achieve 1.2 x 10 9 ions per bunch in RHIC. (met, as shown in previous slide) D : 2.5 x ions/pulse. (4 x charges = 4 x ions/pulse from EBIS, but will be produced from a plasma source, for convenience). Cu 11+ : 1.4 x ions/pulse. (1.5 x charges/pulse) 5e11 charges x 81% x 27% in Cu 11+ = 1.1e11 charges/pulse  need 70% neutralization, or ~15A electron beam SpeciesQIons/pulse (Booster output) as run EBIS (see note) C5+12 x x 10 9 O8+4 x x 10 9 Si13+3 x x 10 9 Ti x x 10 9 Fe20+1 x x 10 9 He2+172 x 10 9 Beams for NSRL Note – assumption is 10A electron beam, 80% EBIS to Booster input, 85% Booster input to output. All NSRL requirements can be met.

J. Alessi Overview EBIS Project Technical Review 1/27/05 Project Status DOE gave CD0 approval (“mission need”) in August, Preparing all documents required for CD1 – (“alternative selection and cost range”)

J. Alessi Overview EBIS Project Technical Review 1/27/05 We are here!“Begin operations”

J. Alessi Overview EBIS Project Technical Review 1/27/05

J. Alessi Overview EBIS Project Technical Review 1/27/05 SUMMARY The EBIS initiative, a linac-based preinjector, is based on a modern technology, which will be simpler to operate and easier to maintain than the Tandems and will have the potential for future performance improvements. It will provide a robust and stable preinjector, which is important for the successful operation of the injectors. The RHIC EBIS design has been verified by the present EBIS operating at BNL (next talk). No significant improvement in performance is required, other than the straightforward scaling of ion output with an increase in trap length. The RFQ and linac are very similar to devices already operating at other labs.