Bill Hellinghausen EDF Trading North America

Slides:



Advertisements
Similar presentations
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Advertisements

Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
Seasonal Adjustment Factor Mark Ruane Credit Work Group ERCOT Public July 23, 2014.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Reload PFV September 12, Reload PFV  Concern that need to be addressed:  The RC need to have an option in PFV to allow gradual reload of markets.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Matt Tozer ERCOT Manager, Settlements & Billing 9/4/2013 ERCOT Update Management of the Balancing Account CMWG.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
CMWG Update WMS September 2015 Meeting. CRR Balancing Account Fund Discussion The CRR Balancing Account fund appears to be working as expected The cap.
Market Credit Working Group Update to WMS Wed. Sept 16, 2009.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
January 7, 2011 Review Nodal Exposure / Collateral as of end of December, 2010 Cheryl Yager.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
Temperature Assumptions for Dynamic Ratings in ERCOT CRR Auctions Proposal to differentiate between Day (PeakWD & PeakWE) and Night (Off-peak) October.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
WMS 1/9/20131 Priority Power Management, LLC Proposed Changes to Holistic Solution WMS January 9, 2013 James Z. Brazell Law Office of James Z. Brazell.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
CMWG Update to WMS Report of CMWG Meeting of
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
September 23, 2011 Report On ERCOT Action Items From September 6, 2011 RTDF Meeting John Dumas ERCOT.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
WMS – Nodal Credit Integration Start Up May 19,
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Texas Congestion Management Work Group Update For WMS Marguerite Wagner, PSEG Texas.
Market Continuity WMS June 8, PUBLIC What is Market Continuity? The processes by which ERCOT market-related systems and activities are returned.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
Valley Import Constraint Resmi Surendran. Valley Import Constraint Range of SFs – to in valley area – 0.03 to outside valley area Not.
CRR Deration and NPRR821 WMS 09/06/2017.
Market Trials Update NATF March 2,
LCRA Comments regarding NPRR 821
Market Continuity Update to TAC Joel Mickey
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Review of Abnormal MCPEs
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
DMM 2017 Q1 Report Highlights
Day-ahead market coupling
Market Pricing Issues: Update
Presentation transcript:

Bill Hellinghausen EDF Trading North America

Proposed Comments on STEC Presentation focusing on CRR Auction Revenues

CRR Revenue reduces the Cost of Congestion STEC calculated the congestion cost based upon Real Time prices. CRR Revenues need to be determined to calculate the true cost of congestion. Certain assumptions have to be made in order to determine CRR Revenues This analysis uses STEC’s assumptions in determining congestion (others have expressed issue with those assumptions) This analysis uses data from Jan 1, 2011 through Sept 30, 2011

Real Time Congestion for the South Zone Subtract the average of the North, West and Houston Load Zones real time prices from the South LZ real time price $3.62/MWhr South Load Zone average load Jan-Sep is 5,219 MW Total congestion load weighted was $141,000,000 CRR revenues through OCT Auction are approx $280,000,000 South LZ is 11.4% of total load Total CRR Rev to South LZ is 11.4% x $280,000,000 $31,932,008 Net Congestion = $141,000,000 - $31,932,008 $109,542,734 This provides a reference of actual numbers using STEC’s assumptions for congestion

Constraint Management STEC assumes in their calculations that the Valley constraint is active in SCED for all hours that the constraint is binding. ERCOT stated in the October 6, 2011 TAC meeting that they intended to leave constraints active in SCED when constraints are binding Given the above the analysis assumes that the DAM will converge with RT Market will purchase CRRs at least at the same percentages that they have to date.

Day Ahead Analysis The DAM should represent the congestion cost. See previous slide. Subtract the average of the North, West and Houston Load Zones day ahead prices from the South LZ day ahead price $1.48/MWhr South Load Zone average load Jan-Sep is 5,219 MW Total Day Ahead congestion load weighted was $45,000,000 Compare this to the $141MM of RT, indicates non-convergence Consistent with management of congestion outside of SCED

Day Ahead Analysis CRR revenues through OCT Auction are approx $280,000,000 South LZ is 11.4% of total load Total CRR Rev to South LZ is 11.4% x $280,000,000 $31,932,008 Net Congestion = $45,000,000 - $31,932,008 $13,067,778 Therefore assuming DAM and RT convergence given the Holistic Solution and CRR participation at least equal to what has been observed to date we would expect that CRR revenues would be 71% of congestion. $32MM/$45MM

Chart Adjusted for CRR Revenue The chart below applies a 71% CRR revenue adjustment to the values determined by STEC This addresses the single issue of CRR revenues netting against congestion costs. No Action WMS Proposal - $5,000 reset WMS Proposal $2,000 reset WMS Proposal - No Reset ERCOT Proposal $161,266,249 $62,776,657 $30,422,542 $322,532,499 $125,553,314 $121,780,527 $73,627,854 $36,215,681 $483,798,748 $188,329,971 $180,784,398 $84,479,051 $42,008,819 $645,064,997 $251,106,629 $239,788,268 $95,330,247 $47,801,958