Bill SahrEVLA Advisory Committee Meeting May 8-9, 2006 1 EVLA Monitor & Control.

Slides:



Advertisements
Similar presentations
BY MAULIK PATEL CED, GPERI Computing Architecture.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 Alerts Rich Moeser.
Software for Science Support Systems EVLA Advisory Committee Meeting, March 19-20, 2009 David M. Harland & Bryan Butler.
Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
5-6 Dec, 2006EVLA M&C Critical Design ReviewRich Moeser 1 User Interfaces Rich Moeser.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Software Status Sonja Vrcic Socorro,
14 June 2004System-wide Services: User InterfaceRich Moeser 1 EVLA Overall Software Design Final Internal Review System-wide Services: User Interface.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
EVLA Monitor & Control Transition System Software
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Output Formats Part I Bryan Butler NRAO Oct-31EVLA Correlator f2f2 Overview 2 types of data: –Monitor data - of interest to engineers and system.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
System/SDWG Update Management Council Face-to-Face Flagstaff, AZ August 22-23, 2011 Sean Hardman.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
Bill SahrEVLA Advisory Committee Meeting September 8-9, EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
Copyright © Texas Education Agency, All rights reserved. Images and other multimedia content used with permission. 1 LEARNING HOW TO USE VARIOUS.
Software Overview Sonja Vrcic
Bryan Butler EVLA Computing Division Head
EVLA Archive The EVLA Archive is the E2E Archive
Monitor and Control Software
EVLA Computing Software Overview.
Obs2script Bryan Butler.
Antenna Monitor & Control Subsystem Engineering Requirements
Software Requirements
EVLA M/C Software PDR, 14 May 2002
VLA to EVLA Transition Plan
Bryan Butler (for Bill Sahr)
EVLA Advisory Committee Meeting
Software Requirements
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
Operations Software Bryan Butler.
Mark McKinnon EVLA Project Manager
EVLA Advisory Committee Meeting, March 19-20, 2009
EVLA M&C Components Observation Executor, Interim & Final Obs2script
EVLA Monitor & Control Bill Sahr NSF Review May , 2006
EVLA Advisory Panel Mtg. System Overview
Requirements Bryan Butler.
Presentation transcript:

Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control

Bill SahrEVLA Advisory Committee Meeting May 8-9, Contents Transition System & Final System EVLA M&C Components Carryover from Transition System to Final System Architecture & Data Flows – Transition & Final System Selected Subsystems –The Alert Subsystem –Correlator Backend, Fast Formatter, TelCal, Post- Processing –User Interfaces – Screen Shots

Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Data Flow - Overview

Bill SahrEVLA Advisory Committee Meeting May 8-9, Transition System vs. Final System In broad terms, there will be two major versions of the EVLA Monitor & Control System – a Transition System and a Final System The Transition System bridges the gap between the old Modcomp-based VLA Control System and the final version of the EVLA Monitor & Control System, while maintaining operational capabilities The Transition System will be responsible for controlling a wide array of old and new hardware – EVLA Antennas, VLA Antennas, the VLA Correlator, and the prototype WIDAR correlator The Transition System will incrementally shift its software architecture toward the desired architecture of the final system

Bill SahrEVLA Advisory Committee Meeting May 8-9, Selected Transition System Milestones Support for EVLA antenna hardware development Use of EVLA Antennas in scientific observations –Monitor and control of EVLA antennas Retirement of the Modcomp-based VLA control system –Monitor and control of VLA antennas (nearly done) –Monitor and control of VLA correlator –Distribution of VLA correlator output within EVLA M&C –Formation & writing of VLA format archive records Support WIDAR prototype correlator Implement target architecture of final system

Bill SahrEVLA Advisory Committee Meeting May 8-9, Retirement of the Modcomp- based VLA control system Monitor and control of VLA antennas – end of Q Monitor and control of VLA correlator – Q Distribution of VLA correlator output – Q Formation & writing of VLA format archive records – Q Parallel operation & testing – Q2 2007

Current State of the Transition System

Bill SahrEVLA Advisory Committee Meeting May 8-9, Transition vs. Final System Components & Carryover

EVLA M&C Transition System Data Flows & Status

EVLA M&C Final System Data Flows

The Alert Subsystem Bryan Butler & Rich Moeser

EVLA M&C Final System Data Flows

Fast Formatter, TelCal, Post-Processing Worst Case Scenario

EVLA M&C, Deployment

Screenshot of the Array Operators Screen

A module subsystem screen – the ACU Screen

Screenshot of the Device Browser

Bill SahrEVLA Advisory Committee Meeting May 8-9, Latest software releases Stable builds web page: /