1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Sun mean reference (SMR)

Slides:



Advertisements
Similar presentations
Bremen Limb Workshop Satellite group First Heidelberg SCIA Limb Results Thomas Wagner,
Advertisements

SCIAMACHY Calibration Review, ESTEC, 11 September 2002 Tilstra, De Graaf, Stammes First verification of SCIAMACHY’s polarisation measurements Gijs Tilstra,
GOME-2 polarisation data and products L.G. Tilstra (1,2), I. Aben (1), P. Stammes (2) (1) SRON; (2) KNMI GSAG #42, EUMETSAT,
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First Level 1b Spectral Calibration analysis.
GOME-2 FM3 (Metop-A) Instrument Review, EUMETSAT, Darmstadt, June 2012 Slide: 1 Rűdiger Lang, Rose Munro, Antoine Lacan, Richard Dyer, Marcel Dobber, Christian.
SABER Instrument Performance and Measurement Requirements.
Brown Bag Lunch Lecture ABI Calibration
An Assessment of the UV Broad Band Filter Radiometer Measurement Accuracy A. Los 1 and J. Gröbner 2 1)Kipp & Zonen, Delft (The Netherlands) 2)JRC, Ispra.
Validation of SCIAMACHY using POLDER as a reference 25 April 2006.
Cluster Angewandte Fernerkundung DLR Oberpfaffenhofen Figure 2 shows all sun mean reference spectra of GOME from July 1995 to June 2006.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First Level 1b General Product Quality.
Disk-Integrated Polarization of the Moon in the Ultraviolet from SOLSTICE M. Snow, G. Holsclaw, W. McClintock, T. Woods University of Colorado/LASP
Just how good is a L1 spectrum? An overview of SCIAMACHY calibration quality Ralph Snel, SSAG Calibration Subgroup and SQWG SADDU meeting June 16/17, 2008.
Doppler signatures in EVE spectra, and flares H. Hudson, T. Woods, P. Chamberlin, L. Fletcher, and D. Graham The Extreme-ultraviolet Variability Experiment.
ASIC3 WorkshopLandsdowne, VA May 16-18, 2006 J. Harder Page 1 Calibration Status of the Solar Irradiance Monitor (SIM) : The Present and the Future Jerald.
2008/10/21 J. Fontenla, M Haberreiter LASP – Univ. of Colorado NADIR MURI Focus Area.
“Pinhole Measurement” Approach to K Measurements using Spontaneous Radiation November 14, 2005 J. Welch, R. Bionta, S. Reiche.
KNMI, The Netherlands * SCIAMACHY validation workshop, Bremen, 6 Dec ‘04 Large scale validation of SCIAMACHY nadir reflectance Gijs van.
ESTEC July 2000 Estimation of Aerosol Properties from CHRIS-PROBA Data Jeff Settle Environmental Systems Science Centre University of Reading.
GOME-2 Polarisation Study — Final Presentation L.G. Tilstra (1,2), I. Aben (1), P. Stammes (2) (1) SRON; (2) KNMI EUMETSAT, Darmstadt,
SCILOV10 FP Meeting SCIAMACHY irradiance validation SCILOV10 FP, Frascati, 26/27 February, 2014 M. Weber and S.Noël Institute of Environmental Physics.
Global NDVI Data for Climate Studies Compton Tucker NASA/Goddard Space Fight Center Greenbelt, Maryland
Blue: Histogram of normalised deviation from “true” value; Red: Gaussian fit to histogram Presented at ESA Hyperspectral Workshop 2010, March 16-19, Frascati,
October 29-30, 2001MEIDEX - Crew Tutorial - Calibration F - 1 MEIDEX – Crew Tutorial Calibration of IMC-201 Adam D. Devir, MEIDEX Payload Manager.
Page 1 Validation Workshop, , IfE Bremen, G. Lichtenberg:Calibration status National Institute for Space Research SCIAMACHY Calibration status November.
Direct Sun measurements of NO 2 column abundances from Table Mountain, California: Retrieval method and intercomparison of low and high resolution spectrometers.
Validation workshop, Frascati, 13 December 2002Page 1 SCIAMACHY products quality and recommendations Based on presentations and discussions during this.
1 An Observatory for Ocean, Climate and Environment SAC-D/Aquarius HSC - Radiometric Calibration H Raimondo M Marenchino 7th SAC-D Aquarius Science Meeting.
Alex A. TakedaAug. 18, 2010 Mentor Dr. Alexander Kutyrev.
Radiometric Correction and Image Enhancement Modifying digital numbers.
Page 1Validation by Satellite Intercomparison - ESRIN 9–13 December 2002 National Institute for Space Research Preliminary validation of the first SCIAMACHY.
Page 1 ENVISAT Validation Review – Frascati – 9-13 December st Envisat Validation Workshop MERIS, December 2002 Conclusions and Recommendations.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
OMI ST meeting June 2006 Calibration & 0-1b data processing Marcel Dobber (KNMI)
S5P cloud products Sebastián Gimeno García, Ronny Lutz, Diego Loyola German S5P Verification Meeting 1 Bremen, November Chart 1>
Recent Solar Irradiance Data From SBUV/2 and OMI Matthew DeLand and Sergey Marchenko Science Systems and Applications, Inc. (SSAI) SOLID WP-2 Workshop.
High resolution solar reference spectrum Robert Voors KNMI.
Coco Rulinda (CGIS-NUR) for PGD 2009
Preliminary Presentation By Matthew Lewis 2 nd December 2005.
Validation of OMPS-LP Radiances P. K. Bhartia, Leslie Moy, Zhong Chen, Steve Taylor NASA Goddard Space Flight Center Greenbelt, Maryland, USA.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis.
Use of the Moon as a calibration reference for NPP VIIRS Frederick S. Patt, Robert E. Eplee, Robert A. Barnes, Gerhard Meister(*) and James J. Butler NASA.
Rutherford Appleton Laboratory Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: Initial trade-off: Height-resolved.
Rutherford Appleton Laboratory Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: FP, 25 April 2014, ESTEC.
GSICS meeting 5-8 March 2012, Beijing, China Slide: 1 Discussion Using GOME and SCIAMACHY as re- calibration reference for Visible and Near-Infrared channels.
2015 GSICS Annual Meeting, Deli India March 16~20, 2015 Xiuqing Hu National Satellite Meteorological Center, CMA Yupeng Wang, Wei Fang Changchun Institute.
Thomas C. Stone U.S. Geological Survey, Flagstaff, AZ USA GSICS Research Working Group Meeting EUMETSAT 24−28 March 2014 Using the Moon as a Radiometric.
Future eumetsat missions: MTG/FCI, MTG/UVNS and EPS-SG/METimage
Description of the giro ON THE DETAILS OF THE IMPLEMENTATION
Pre-launch Characteristics and Calibration
Other Trace Gases (a.k.a. HCHO, BrO, and OClO) Status & Outlook
Status of ACVE-3/pre-validation recommendationss 21. 6
V2.0 minus V2.5 RSAS Tangent Height Difference Orbit 3761
Sébastien Wagner, Tim Hewison In collaboration with D. Doelling (NASA)
Concept study GOME-2/AVHRR radiance inter-comparison
Verifying the DCC methodology calibration transfer
Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: FP, 25 April 2014, ESTEC Height-resolved aerosol R.Siddans.
Using SCIAMACHY to calibrate GEO imagers
Activity 4: GOME2 Matthijs Krijger Ralph Snel Pieter van der Meer
Mina Kang1, Myoung-Hwan Ahn1, Quintus Kleipool2 and Pepijn Veefkind2
GSICS/CEOS web meeting on Reference Solar Spectrum
Lunar reflectance model based on SELENE/SP data
Changchun Institute of Optics Fine Mechanics and Physics
Himawari-8 Launch and its calibration approaches
AIRS/GEO Infrared Intercalibration
Early calibration results of FY-4A/GIIRS during in-orbit testing
Authors: B.Kerridge, R.Siddans, J.Reburn, B.Latter and V.Jay
Preliminary SCIAMACHY Lunar observations as intercalibration source
Inter-band calibration using the Moon
TEMPO Instrument Update
Presentation transcript:

1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Sun mean reference (SMR) analysis

Content Related Verification Tasks What has been looked at so far Orbit and State specifics First results Conclusions

Related Verification Tasks L : Range checking of various SMR record parameters L : Comparison of SMRs from different sources L : Comparison of in-flight and on-ground diffuser patterns L : Radiance sensitivity parameters unchanged

What has been looked at so far (1) L : Range checking of various SMR record parameters Wavelength of the sun spectrum Mean sun reference spectrum Relative radiometric precision of SMR Relative radiometric accuracy of SMR Diffuser/small aperture etalon Average mirror positions/elevation angles Mean value of the corresponding PMD values PMD out of band signal Doppler shift

What has been looked at so far (2) L : Radiance sensitivity parameters unchanged To calculate the absolutely calibrated solar reference spectrum, a number of on-ground derived key-data is needed When comparing the calculated SMR (as from 1b processor) against a literature Value, this tells us indirectly whether we have to expect changes in some of our Key-data.

Orbit and state specifics States: State ID 62 (ESM diffuser) Orbits 798, 814, 1597 For orbits 798 and 814 pre-defined state parameters have been commanded, which may lead to problems in the interpretation of absolutely calibrated spectra, because the diffuser is partly obstructed by the stiffening/mounting ring. For orbits 1597 so called beta-flight state configuration was commanded, explicitly avoiding obstruction of the diffuser

First Results (1) Can all this deviation be explained by the obstruction? Have some key-parameters changed? Other explanations?

First Results (2) Good agreement in channels 1,2 and 5 Factor of 2 in channels 3,4 and 6 Huge deviations in channel 7 and 8 Time - Normalisation problem (1b processor) THIS IS ICE

First Results (3) Good agreement in channels 1 to 6 – although it is not yet perfect. We first have to apply better in-flight calibration (Leakage, wavelength). Channels 7 and 8 are just bad due to ice problem.

Conclusions Fixing of in-flight auxiliary files for leakage current and spectral calibration Looking at the remaining 1b SMR ADS record fields (first of all still based on state 62) Comparison of different sources of SMR Derivation of “diffuser patterns” and comparison of on-ground ones Repair of time-normalisation problem in 1b processor