AWST’s Implementation of Wind Power Production Forecasting for ERCOT

Slides:



Advertisements
Similar presentations
What’s quasi-equilibrium all about?
Advertisements

Chapter 13 – Weather Analysis and Forecasting
Solar Energy Forecasting Using Numerical Weather Prediction (NWP) Models Patrick Mathiesen, Sanyo Fellow, UCSD Jan Kleissl, UCSD.
Report of the Q2 Short Range QPF Discussion Group Jon Ahlquist Curtis Marshall John McGinley - lead Dan Petersen D. J. Seo Jean Vieux.
Matthew Hendrickson, and Pascal Storck
PRESENTS: FORECASTING FOR OPERATIONS AND DESIGN February 16 th 2011 – Aberdeen.
SPC Potential Products and Services and Attributes of Operational Supporting NWP Probabilistic Outlooks of Tornado, Severe Hail, and Severe Wind.
3.11 Adaptive Data Assimilation to Include Spatially Variable Observation Error Statistics Rod Frehlich University of Colorado, Boulder and RAL/NCAR Funded.
Managing Intermittency:
©2013 AWS Truepower, LLC ALBANY BARCELONA BANGALORE 463 NEW KARNER ROAD | ALBANY, NY awstruepower.com | A CUSTOMIZED RAPID.
2012: Hurricane Sandy 125 dead, 60+ billion dollars damage.
Description and Preliminary Evaluation of the Expanded UW S hort R ange E nsemble F orecast System Maj. Tony Eckel, USAF University of Washington Atmospheric.
Challenges in data assimilation for ‘high resolution’ numerical weather prediction (NWP) Today’s observations + uncertainty information Today’s forecast.
Rapid Update Cycle Model William Sachman and Steven Earle ESC452 - Spring 2006.
Brian Ancell, Cliff Mass, Gregory J. Hakim University of Washington
1 Integrating Wind into the Transmission Grid Michael C Brower, PhD AWS Truewind LLC Albany, New York
Supplemental Topic Weather Analysis and Forecasting.
Transitioning unique NASA data and research technologies to the NWS 1 Evaluation of WRF Using High-Resolution Soil Initial Conditions from the NASA Land.
1 NGGPS Dynamic Core Requirements Workshop NCEP Future Global Model Requirements and Discussion Mark Iredell, Global Modeling and EMC August 4, 2014.
Bill Blevins Sep. 24, 2014 PV Forecasting RFP. 2 Projected Installed Capacity of PV in ERCOT.
Consortium Meeting June 3, Thanks Mike! Hit Rates.
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
Chapter 13 – Weather Analysis and Forecasting. The National Weather Service The National Weather Service (NWS) is responsible for forecasts several times.
Cao Xiao September, 2013 Wind Power Forecasting. 2 C urrent situation of forecast technology Key technology of forecast Forecast principle of wind power.
World Renewable Energy Forum May 15-17, 2012 Dr. James Hall.
For the lack of ground data the verification of the TRMM performance could not be checked for the entire catchments, however it has been tested over Bangladesh.
Lecture 10 (11/11) Numerical Models. Numerical Weather Prediction Numerical Weather Prediction (NWP) uses the power of computers and equations to make.
Director of Forecasting
Forecasting and Numerical Weather Prediction (NWP) NOWcasting Description of atmospheric models Specific Models Types of variables and how to determine.
Applied Meteorology Unit 1 An Operational Configuration of the ARPS Data Analysis System to Initialize WRF in the NWS Environmental Modeling System 31.
NUMERICAL WEATHER PREDICTION K. Lagouvardos-V. Kotroni Institute of Environmental Research National Observatory of Athens NUMERICAL WEATHER PREDICTION.
ESA DA Projects Progress Meeting 2University of Reading Advanced Data Assimilation Methods WP2.1 Perform (ensemble) experiments to quantify model errors.
The Importance of Atmospheric Variability for Data Requirements, Data Assimilation, Forecast Errors, OSSEs and Verification Rod Frehlich and Robert Sharman.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Wolf-Gerrit Früh Christina Skittides With support from SgurrEnergy Preliminary assessment of wind climate fluctuations and use of Dynamical Systems Theory.
June, 2003EUMETSAT GRAS SAF 2nd User Workshop. 2 The EPS/METOP Satellite.
ECE 7800: Renewable Energy Systems
Downscaling and its limitation on climate change impact assessments Sepo Hachigonta University of Cape Town South Africa “Building Food Security in the.
Comparison of Different Approaches NCAR Earth System Laboratory National Center for Atmospheric Research NCAR is Sponsored by NSF and this work is partially.
Development of an EnKF/Hybrid Data Assimilation System for Mesoscale Application with the Rapid Refresh Ming Hu 1,2, Yujie Pan 3, Kefeng Zhu 3, Xuguang.
© 2007 AWS Truewind, LLC Optimization of Wind Power Production Forecast Performance During Critical Periods for Grid Management John W Zack, Principal.
Celeste Saulo and Juan Ruiz CIMA (CONICET/UBA) – DCAO (FCEN –UBA)
Higher Resolution Operational Models. Operational Mesoscale Model History Early: LFM, NGM (history) Eta (mainly history) MM5: Still used by some, but.
1 Agenda Topic: National Blend Presented By: Kathryn Gilbert (NWS/NCEP) Team Leads: Dave Myrick, David Ruth (NWS/OSTI/MDL), Dave Novak (NCEP/WPC), Jeff.
AWS Truewind Methodology Timeline of AWS Truewind participation Key points Wind resource modeling Estimation of plant output Validation and adjustment.
A canopy model of mean winds through urban areas O. COCEAL and S. E. BELCHER University of Reading, UK.
Sensitivity Analysis of Mesoscale Forecasts from Large Ensembles of Randomly and Non-Randomly Perturbed Model Runs William Martin November 10, 2005.
Gouge – Navy slang for the bare essential knowledge to get by.
Modern Era Retrospective-analysis for Research and Applications: Introduction to NASA’s Modern Era Retrospective-analysis for Research and Applications:
Model Post Processing. Model Output Can Usually Be Improved with Post Processing Can remove systematic bias Can produce probabilistic information from.
Transitioning unique NASA data and research technologies to the NWS 1 Evaluation of WRF Using High-Resolution Soil Initial Conditions from the NASA Land.
APPLICATION OF NUMERICAL MODELS IN THE FORECAST PROCESS - FROM NATIONAL CENTERS TO THE LOCAL WFO David W. Reynolds National Weather Service WFO San Francisco.
Title_Sli de Quality Controlling Wind Power Data for Data Mining Applications Gerry Wiener Research Applications Laboratory Software Engineering Assembly,
Linear Optimization as a Solution to Improve the Sky Cover Guess, Forecast Jordan Gerth Cooperative Institute for Meteorological Satellite Studies University.
Autonomous Polar Atmospheric Observations John J. Cassano University of Colorado.
Renewable Energy Requirements Rapid Update Analysis/Nowcasting Workshop - June 4, 2015 Sue Ellen Haupt Director, Weather Systems & Assessment Program Research.
An Examination Of Interesting Properties Regarding A Physics Ensemble 2012 WRF Users’ Workshop Nick P. Bassill June 28 th, 2012.
Kris Shrestha James Belanger Judith Curry Jake Mittelman Phillippe Beaucage Jeff Freedman John Zack Medium Range Wind Power Forecasts for Texas.
Modeling and Evaluation of Antarctic Boundary Layer
Page 1© Crown copyright Modelling the stable boundary layer and the role of land surface heterogeneity Anne McCabe, Bob Beare, Andy Brown EMS 2005.
Vincent N. Sakwa RSMC, Nairobi
Fly - Fight - Win 2 d Weather Group Mr. Evan Kuchera HQ AFWA 2 WXG/WEA Template: 28 Feb 06 Approved for Public Release - Distribution Unlimited AFWA Ensemble.
NOAA Northeast Regional Climate Center Dr. Lee Tryhorn NOAA Climate Literacy Workshop April 2010 NOAA Northeast Regional Climate.
Overview of Downscaling
  Robert Gibson1, Douglas Drob2 and David Norris1 1BBN Technologies
Overview of Deterministic Computer Models
How do models work? METR 2021: Spring 2009 Lab 10.
What is in our head…. Spatial Modeling Performance in Complex Terrain Scott Eichelberger, Vaisala.
Data management: 10 minute data, 8760 hours Data Q/C, error checking
Rapid Adjustment of Forecast Trajectories: Improving short-term forecast skill through statistical post-processing Nina Schuhen, Thordis L. Thorarinsdottir.
Presentation transcript:

AWST’s Implementation of Wind Power Production Forecasting for ERCOT ERCOT Workshop Austin, TX March 17, 2008 AWST’s Implementation of Wind Power Production Forecasting for ERCOT John W. Zack AWS Truewind LLC Albany, New York jzack@awstruewind.com

Overview State-of-the-Art Forecasting Tools Forecasting Time Scales AWST’s ERCOT Forecast System Forecasting the Future of Forecasting

Overview of the State-of-the-Art in Wind Power Production Forecasting What are the tools used in forecasting? How are they typically used?

AWST’s Forecast System

Physics-based Models Differential equations for basic physical principles are solved on a 3-D grid Must specify initial values of all variables at each grid point and properties of earth’s surface Simulates the evolution of the atmosphere in a 3-D volume Many different models Eta, GFS, MM5, WRF, MASS etc. Same basic equations with subtle but critical differences Can be customized for an application

Physics-based Simulation Example Forecast of the evolution of the 50 m winds over southern Texas during a 66-hr period beginning 6 PM CST on 26 Feb 2008 Requires ~ 9.4 trillion operations (add, multiply etc.)

Physics-based Models Key Performance Factors Initial values for all prognostic variables must be specified for every grid cell Boundary values must be specified for all boundary cells (usually from another model with a larger domain) Grid has finite resolution - some processes are at the “sub-grid” scale and feedback to affect grid scale Surface properties (roughness, heat capacity etc.) of the earth must be specified or modeled

Statistical Models Empirical equations are derived from historical predictor and predictand data (“training sample”) Current predictor data and empirical equations is then used to make forecasts Many types of models Time series, MLR, ANN, SVR More sophisticated does not always mean better performance

Statistical Models: Performance Factors Type & configuration of the statistical model and training algorithm Size, quality and representativeness of the training sample Input variables made available for training The type of relationships that actually exist Issue: difficult to understand the reasons for observed performance

Plant Output Models Relationship of met variables to power production Could be physical or statistical Often based on wind speed but can consider other variables

High quality data from the plant Desired Data from Wind Plant Desired Wind Plant Data for Forecasting Power production and turbine availability Met tower within 5km and 100m elevation of each turbine Wind speed and direction at hub height and T and P at 2m One met tower with two levels of data T and P at 2m and hub height Wind speed and direction at hub height and hub height - 30m Consistent monitoring and calibration of data Well-Behaved Data One of the keys to accurate forecasts… High quality data from the plant Data with Issues

Forecast Ensembles Uncertainty present in any forecast method due to Input data Model type and configuration Approach: perturb input data and model parameters within their range of uncertainty and produce a set of forecasts Benefits Ensemble composite is often the best forecast Spread of ensemble provides a case-specific measure of uncertainty

Forecasting Time Scales How does the wind power production forecasting challenge vary with the look-ahead period?

Hours-ahead Forecasts Must forecast small scale weather features Large eddies, local-scale circulations Rapidly-changing, short life-times e.g. cloud features, mountain circulations, sea/land breezes Typically poorly defined by current observing systems Tools: Difficult to use physics-based models Autoregressive statistical models on wind farm time series data Supplement with offsite predictor data Errors grow rapidly with increasing look-ahead time

Days Ahead Forecasts Little skill in forecasting small-scale features Forecast skill mostly from medium and large scale weather systems Well-defined by current sensing networks Tools: Physics-based model simulations are the best tool Statistical models used to adjust physics-based output (MOS) Regional & continental scale weather data are most important Errors grow slowly with increasing look-ahead time

The ERCOT Forecast System What input data is used? How is AWST’s system configured for the ERCOT application? Why was it configured that way? What products are delivered?

Forecast System Input Production data (from ERCOT) Hourly increments, reported once per hour Power production (MW) Historical turbine availability Planned outages WGR Met data (from WGRs) Parameters: Wind speed, wind direction, temperature and pressure At whatever height available Regional weather data (from NWS and other sources) NWP data (from US NWS and Environment Canada)

General Approach & Philosophy Apply AWST’s extensively used eWind system Forecast met variables with physics and statistical models Use plant output model to obtain power production forecast Employ sophisticated quality control of input data Configure and customize physics-based and statistical models for optimum performance in Texas Employ an ensemble forecasting scheme Ensemble members created by varying factors that are most significant in producing uncertainty in forecasts in Texas Input data Model parameters Construct an optimal composite forecast based on recent performance of all ensemble members

The Implementation Ensemble of physics-based models Ensemble of statistical models Plant output model

Physics-based Simulations Types Two physics-based models MASS: Mesoscale Atmospheric Simulation System Developed and maintained by MESO, Inc (AWST partner) Has a 25-year history of development and application Customized by AWST/MESO for wind energy forecasting in 1990’s WRF: Weather Research and Forecasting model New community model developed by US consortium including NCAR & NWS In widespread use for several years Eight types of physics-based simulations Two models: MASS and WRF Four Initializations: US NAM, US GFS, US RUC, EC Global GEM Output used as input into statistical models

Physics-based Forecast Simulations Configurations Nested grids over Texas and vicinity 6 to10 km horizontal grid cell size for highest resolution nest Initialized every 6 hrs Length of simulations: 72 hrs 3-D grid point output data saved every hour

Short-term (0-6 hrs) Statistical Met Variable Forecasting Ensemble of 12 different statistical methods Separate statistical forecast model for each look-ahead hour for each forecast methods Ensemble based on varying several factors (emphasis on statistical models and onsite and offsite data) Type of statistical algorithm (Linear regression, ANN etc.) Training sample size and time period (regime-based) Type and amount (# of variables) of input data Time series of met and power data Off-site met tower or remotely sensed data Physics-based model output data Statistical procedure used to construct an optimal composite forecast from ensemble members based on recent performance

Short-term forecasting (0-6 hrs) Customization for Texas Use offsite data types available in Texas Analyze time series of data from Texas wind farms Determine autocorrelation structure Use most appropriate statistical procedures Identify significant offsite time-lagged spatial relationships for each forecast site Analyze patterns and relationships in high-resolution numerical simulations and observed data Define Texas-specific regimes for statistical modeling

Intermediate-term Statistical Met Variable Forecasting (7-48 hrs) Ensemble of 24 different statistical forecasts Separate statistical forecast model for each look-ahead hour for each forecast method Ensemble based on varying several factors (emphasis on physics-based models) Type of statistical algorithm Training sample size and time period Type of physics-based model Source of physics-based model initialization and boundary data Statistical procedure used to construct an optimal composite forecast from ensemble members based on recent performance

Intermediate-term Forecasting Customization for Texas Customize surface property databases for Texas Standard databases often have misrepresentations Customize physics-based model to optimally simulate phenomena important in Texas Low level jets (reverse turbulence profile) Shallow cold air surges Intense thunderstorms Configure model grids to have high grid resolution in areas critical to wind farm wind variation Texas-specific regimes for statistics

Plant Output Model Two models Why two models? Plant-scale power curve Power curve deviation model Wind direction Atmospheric stability Why two models? Data quality and quantity Forecast obtained by using ensemble composite of met variable forecasts as input

Plant Output Model Issue Turbine Availability Reporting Reporting of actual turbine availability has been very inconsistent in other applications Projected (scheduled) availability often left at 100% Example depicts both missing and probably inaccurate actual availability data. 100% availability was specified for all hours on the chart

Short Term Wind Power Forecast (STWPF) The STWPF is a forecast of the most likely value of power production. STWPF forecasts are created for individual WGRs and the aggregate of all ERCOT WGRs. The STWPF is produced each hour and extends 48 hours.

Wind Generation Resource Power Potential (WGRPP) 80% Probability of Exceedence (POE) forecast is calculated for the aggregate output of all WGRs. WGRPP for the aggregate must be the sum of the WGRPP for individual WGRs. The WGRPP for individual WGRs is calculated by disaggregating the aggregate WGRPP forecast. The WGRPP is produced each hour and extends 48 hours

WGRPP Disaggregation The 80% POE forecast for the aggregate is larger than the sums of the 80% POE forecasts for the individual WGRs. Aggregate WGRPP forecast is disaggregated to create WGRPP forecasts for each WGR. Disaggregation is based on the error correlation between the WGRs.

The Result Chart depicts rolling 6-hr ahead forecast of aggregate power production Period 26 Feb 12 CST to 28 Feb 12 CST Red line: STWPF Green line: WGRPP

Forecasting the Future of Forecasting What is being (can be) done to improve forecast performance?

How will forecasts be improved? (Top Three List) (3) Improved physics-based/statistical models Improved physics-based modeling of sub-grid and surface processes Better data assimilation techniques for physics-based models Learning theory advances: how to extract more relevant info from data (2) More effective use of models Enabled by more computational power Higher resolution, more frequent physics-based model runs More sophisticated use of ensemble forecasting Use of more advanced statistical models and training methods (1) More/better data Expanded availability and use of “off-site” data in the vicinity of wind plants, especially from remote sensors A leap in quality/quantity of satellite-based sensor data

New Remote Sensing Technology Low-power, low-cost, dual-polarization phased array Doppler radars on cellular towers being developed by CASA (Center for Adaptive Sensing of the Atmosphere) Target price: $50 K per unit Commercial availability: 2009-2010 Small enough to mount on cell towers; Will measure atmosphere below 1 km that is not visible to current National Weather Service NEXRAD Doppler radar (72% of atmosphere below 1 km is not visible to current NWS system) Provide winds with resolution in 100’s of meters out to 30-50 km New data every few minutes Attempt currently being made to organize a field project in Tehachapi Pass in California to evaluate the value of this technology to short-term wind energy forecasting

Summary AWST’s Approach to Forecasting: eWind Widely used and verified for wind power productions forecasts in North America Based on an ensemble of forecasts from several physics-based and statistical models using different datasets Extensive customization for forecasting in Texas General Points About Forecasting Forecast quality has strong dependence on quality and quantity of data from the wind generation facilities Forecast systems can and should be customized to meet the requirements of a particular application Forecast technology is changing rapidly - need system/team that can keep pace with the evolution of forecasting technology