Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006.

Slides:



Advertisements
Similar presentations
Presentation to the Joint Review Panel Yellowknife General Hearing December 5 th, 2006 Dennis Bevington MP Western Arctic.
Advertisements

Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Transport Canada Submission to the Nunavut Impact Review Board Respecting the Meadowbank Gold Project March 2006.
NIRB Public Hearing on Condition 32 of the Meadowbank Project Certificate No. 004 Baker Lake – April 28, 29, 30 Presentation to NIRB by the Government.
Carolyn Dunn Environmental Assessment Division Healthy Environments Consumer Safety Branch Health Canada High Lake Mine Pre-Hearing Conference December.
Environment Environnement Canada Environment Canada’s Intervention Presentation Cumberland Resources Ltd.’s Meadowbank Gold Mine Final Public Hearing March.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
PROPONENT INVOLVEMENT IN CONSULTATION Presentation to the Geology Matters Community Engagement Workshop October 30, 2012 Consultation with the Mi’kmaq.
The Process of Siting and Approving a New Landfill in Ontario
HATCH ACRES MEADOWBANK GOLD PROJECT REVIEW OF CUMBERLAND’S FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) Submission to Nunavut Impact Review Board (NIRB)
Baker Lake Community Information Session Public Hearing Decision September 1, 2009.
Kiggavik Uranium Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Baker Lake, NU March 2-14,
Nunavut Impact Review Board NLCA Reconsideration of Condition 32 of the Meadowbank Gold Mine Project Certificate Public Hearing Introductory Presentation.
Mary River Project Pre-Hearing Conference Presentation Igloolik, and Pond Inlet, Nunavut November 6-7 and 9-10, 2011.
Baffinland Iron Mines Mary River Project November Pre-Hearing Conference Igloolik & Pond Inlet.
2006 Project Alternatives Pit and Dike Risk Evaluation MEADOWBANK GOLD PROJECT.
Type ‘A’ Water Licence Application Department of Community and Government Services, Government of Nunavut Sewage Treatment and Water Supply Hamlet of Rankin.
NUNAVUT IMPACT REVIEW BOARD Targeting Increased Effectiveness in a Changing Landscape Nunavut Mining Symposium, Iqaluit, April 17, 2012.
Miramar Hope Bay Ltd. Doris North Project Water Licence Application Presentation for Nunavut Water Board Public Hearing Presented by Kitikmeot Inuit Association/Nunavut.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Mineral Development Advisory Group (MDAG) Hope Bay Project &Doris North Newmont Mining Corporation Mineral Development Advisory Group (MDAG) Hope Bay Project.
Kiggavik Project Final Hearing Presentation
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
Meadowbank Government of Nunavut Presentation to Nunavut Impact Review Board March 2006Baker Lake, Chesterfield Inlet, Rankin Inlet.
Natural Resources Canada : Regulatory Responsibilities Mineral Advisory Group Meeting (MDAG) Newmont Mining Corporation Doris North Project / Phase II.
Dominique Poulin Environmental Health First Nations and Inuit Health Branch Health Canada Health Canada’s Implementation of the Drinking Water Safety Program:
Assessing Effects on Human Health Meadowbank Gold Project Margaux Brisco Nunavut Impact Review Board Final Hearings, Baker Lake, Nunavut March 27 to 31,
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Presentation to Final Hearing Baffinland Iron Mines Corporation Mary River Project Type A Water Licence Application Nunavut Water Board Final Hearing Pond.
Sean Joseph & Karén Kharatyan (Technical Advisors) Nunavut Water Board (NWB)
Agenda  Opening Remarks - NIRB  NIRB Presentation: NLCA Reconsideration of the Meadowbank Gold Mine Project Certificate  General questions on.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
2006 Socio-economic component CUMBERLAND RESOURCES LTD.  Baseline  Impact Assessment  Mitigation and Benefit Enhancement  Monitoring  Intervener Comments.
Proposed Amendment to Project Certificate (Condition 32) Meadowbank Private Access Road INAC's Comments to NIRB Baker Lake, Nunavut [ April 28-30, 2009.
Toward the development of northern water standards presentation to the MVLWB December 5, 2007 Kathleen Racher Water Resources Division.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
California Integrated Waste Management Board Tire Flow Study Along the California-Mexico Border Region Special Waste Committee Meeting California Integrated.
CONCLUSION AND SUMMARY. How has (NLCA) been met? a) whether the project would enhance and protect the existing and future well-being of the residents.
Nunavut Impact Review Board Final Hearing Agnico Eagle Mines Limited – Meliadine Gold Project August 21 – 27, 2014 Rankin Inlet, Nunavut Transport Canada.
Review of Interventions ____________ CanZinco Ltd.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
Lupin Mines Incorporated Lupin Mine Project Type ‘A’ Water Licence Renewal Application Nunavut Water Board Technical Meeting & Pre-Hearing Conference Kugluktuk,
Agenda  Opening Remarks - NIRB  NIRB Presentation: NLCA Reconsideration of the Meadowbank Gold Mine Project Certificate  General questions on.
Miramar Hope Bay Ltd. Doris North Project Nunavut Water Board Licence Application Indian and Northern Affairs Presentation NWB Final Hearing Cambridge.
Navigation Guide Major Projects – Aboriginal Partnerships.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Public Participation in Sustainability Planning and Socio-Economic Impact Assessment in Canada.
GBLWMP-SLUP Integration February 5, 2010 Deline. Ecological Integrity Policy GBLWMPSLUP (a): All activities in the GBLW must be consistent with.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
ISO Session 3 Environmental Management and Ethics in Management.
Nunavut Water Board Public Hearing Rankin Inlet, Nunavut May 18-19, 2010 Water License #3BM-GRA----, Government of Nunavut, Dept. of Community and Government.
MEADOWBANK WATER LICENSE RENEWAL NWB 2AM MEA0815 January 14-15, 2015, Community of Baker Lake, NU Hutchinson Environmental Sciences Ltd.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Revisions to Amendment Application No. 1 of Project Certificate 003 NIRB Public Hearing – April 2016 SOCIO-ECONOMICS TMAC Resources April 12, 2016 Cambridge.
Agnico-Eagle Mines Ltd
Phase 2 Hope Bay Belt Project
MADRID – BOSTON PROPOSAL PHASE 2 OF THE HOPE BAY PROJECT
Kitikmeot Inuit Association
Phase 2 Hope Bay Belt Project
Meadowbank Water License Renewal
GMRP City of Yellowknife Socio-Economic Strategy
WHALE TAIL PIT Expansion Project
Regional Environmental Health Specialist
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation transcript:

Meadowbank Gold Project: Indian and Northern Affairs Canada’s Final Hearing Presentation to the Nunavut Impact Review Board March 27 – 31, 2006

Provide the best possible advice to the Nunavut Impact Review Board INAC’s Role in the Review Minister has a role to review the Board’s final report

Regulatory Role INAC’s regulatory trigger is the construction of the all-weather road on Crown land.

Legislation DIAND Act Nunavut Land Claims Agreement Act Canadian Environmental Assessment Act Territorial Lands Act Nunavut Waters & Nunavut Surface Rights Tribunal Act

INAC’s presentation is a brief synopsis of our submission to the Nunavut Impact Review Board

1.Socio-Economic 2.Road uses 3.Accidents and malfunctions 4.Perimeter dewatering dike design, construction and monitoring 5.Presentation of geotechnical information 6.Drainage benches for all open pits 7.Disposal of non-salvageable materials Areas of Concern

Collaborative socio-economic monitoring and follow-up Baker Lake labour market adjustment and baseline data The transition of an inexperienced labour force to a rotational workplace Socio-Economic Concerns

Socio-Economic Assessment Collaborative Monitoring and Follow-Up Collection of baseline information, analysis and development of mitigation or enhancement strategies involves the GN, hamlets, GOC and proponent These efforts are in addition to and separate from, the monitoring activities of the IIBA

Recommendations All parties should agree on the framework for the monitoring committee prior to issuance of project certificate NIRB can play a guiding role The framework must be flexible to allow for the inclusion of future projects Socio-Economic Assessment Collaborative Monitoring and Follow-Up (Cont’d)

Socio-Economic Assessment Baker Lake Labour Market Adjustment and Baseline Data Inadequate assessment of models for job retention, employee turnover, gender hiring and local labour force supply. Incomplete baseline data on local labour force. Recommendations Re-evaluation of assessment process, applying higher variables for turnover rates and labour force supply. Specific monitoring for early identification and development of mitigation strategies.

High local levels of unemployment will result in many new workers wanting to work at the project. These new workers and their families will be most vulnerable to negative socio-economic impacts resulting from rotational industrial employment. Socio-Economic Assessment Transition of an Inexperienced Labour Force to an Industrial Rotational Workplace Recommendations Life skill training must be available to new workers and their families, and be closely monitored.

Bio-physical Assessment All-Weather Road Recommendations Provide assurances that mitigation will be undertaken for the environmental, socio- economic and cumulative effects arising from the construction, operation, and abandonment of the mine access road. Potential external uses of the all-weather mine access road.

Bio-physical Assessment Accidents and Malfunctions Requirement of the NIRB Guidelines “The proponent shall assess the potential impacts, including those resulting from interaction with wildlife, of accidents and malfunctions, including worst-case scenarios, and shall evaluate their probability of occurrence.” Recommendation Provide a complete list of potential Accidents and Malfunctions and address requirements of NIRB Guidelines as outlined above.

Bio-physical Assessment Perimeter Dewatering Dike Design, Construction and Monitoring Uncertainty regarding contingency plans for construction of perimeter dikes over potentially challenging subsurface foundation conditions in deeper water sections of dike. Image: Courtesy of Cumberland Resources Ltd

Bio-physical Assessment Perimeter Dewatering Dike Design, Construction and Monitoring Cont’d Recommendation Describe contingency plans for dike construction in deeper water sections of dewatering dikes (pending).

Bio-physical Assessment Presentation of Geotechnical Information Better presentation of geotechnical domains and pit slope angles will allow confident assessment of potential impacts and better understanding of design (provided). Recommendations Present a map to show the zones of similar physical features (provided) Present worst case scenarios for pit wall failure and options for remediation (pending).

Bio-Physical Assessment Drainage Benches for All Open Pits Drainage benches have not been included in the mine design (provided).

Recommendations Provide a mine design with drainage benches or provide reasoning for not including the design into the current pit plan (provided). Detail the potential impacts arising from the design of the drainage benches and present remediation contingencies (pending). Bio-Physical Assessment Drainage Benches for All Open Pits (cont’d)

Bio-Physical Assessment Disposal of Non-Salvageable Materials Non-salvageable materials will be cleaned and compressed before disposal into waste rock piles and/or into pits prior to flooding. The design of a land fill within the waste rock pile has not been provided (pending). Recommendations Identify area and submit design criteria for landfill of non-salvageable material (pending). Provide list of materials to be deposited into pits or waste rock piles (pending).

INAC is confident all concerns will be addressed.

Matna Qujannamiik Thank You Merci

Clarification to Environment Canada Question Baseline Groundwater Quality Data Very limited baseline data from 2003 and 2004, with significant variation Cumberland agreed to re-sample monitoring wells after thaw (~August 2006) to supplement FEIS groundwater data Prior to next phase of regulatory process, suggest Cumberland re-run this model to improve confidence regarding the Proponent’s predictions for pit water quality during mine life and final flooding of the pits.