JRA1 Status: PCMAG, Sensors and Infrastructure Tobias Haas DESY/F1 11 September 2006.

Slides:



Advertisements
Similar presentations
Geant 4 simulation of the DEPFET beam test Daniel Scheirich, Peter Kodyš, Zdeněk Doležal, Pavel Řezníček Faculty of Mathematics and Physics Charles University,
Advertisements

Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
F1 Contribution to ILC Vertex Detector Tobias Haas 23 Febuary 2005.
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
SLC  Testbed Proposal Jeff Gronberg  working group SC Linear Collider Retreat June 26 – 29, 2002.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
Wojciech Dulinski Mimosa-18 (High Resolution Tracker) IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France Mini.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
ILC VXD Review, Fermilab, October 2007 Ariane Frey, MPI für Physik DEPFET Vertex Detector Simulation and Physics Performance Ariane Frey for the DEPFET.
Impact parameter resolution study for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 DAQ Status Daniel Haas DPNC Genève Status DAQ board INFN Strasbourg DAQ boards TLU Bristol Software.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
G. BrunoOffline week - February Comparison between test- beam data and the SPD simulations in Aliroot G. Bruno, R. Santoro Outline:  strategy of.
HEP Tel Aviv University LumiCal (pads design) Simulation Ronen Ingbir FCAL Simulation meeting, Zeuthen Tel Aviv University HEP experimental Group Collaboration.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
Plans for a Simulation Study of the Magnetic Field Requirements of the LC TPC February 2006, ILC TPC Analysis Jamboree, DESY Christian Hansen University.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1: Pixel Telescope Test Beam Campaigns Pixel Telescope: Status Demonstrator Testbeam 1 (DESY) Testbeam 2 (DESY)
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
Progress Report on GEANT Study of Containerized Detectors R. Ray 7/11/03 What’s New Since Last Time?  More detailed container description in GEANT o Slightly.
JRA1 – Next Steps towards the Final Telescope Ingrid-Maria Gregor, DESY EUDET Annual Meeting Paris, October 2007.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
JRA1 – JRA2 Interface Tobias Haas DESY 4 January 2006.
JRA1 Status: PCMAG, Testbeam Infrastructure and Pixel Telescope Tobias Haas DESY/F1 27 August 2007.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
JRA1 Magnet and Test Beam Infrastructure  Superconducting Magnet (PCMAG)  Mechanics  Cooling  Telescope Simulations  Measuring DESY Tobias.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
CMOS Pixels Sensor Simulation Preliminary Results and Plans M. Battaglia UC Berkeley and LBNL Thanks to A. Raspereza, D. Contarato, F. Gaede, A. Besson,
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
Manoj B. Jadhav Supervisor Prof. Raghava Varma I.I.T. Bombay PANDA Collaboration Meeting, PARIS – September 11, 2012.
Initial proposal for the design of the luminosity calorimeter at a 3TeV CLIC Iftach Sadeh Tel Aviv University March 6th 2009
EUDET beam telescope Geant 4 simulation of spatial resolution
Status of EUTelescope EUDET Annual Meeting – Paris – 8/10 October 2007
FCAL R&D towards a prototype of very compact calorimeter
DESY contributions to MAPS DESY testbeam
First Testbeam results
Preparation for CERN test beam
Tracking System at CERN 06 and 07 test beams
Silicon Lab Bonn Physikalisches Institut Universität Bonn
IDEA Detector Simulation Status
Planning for the Demonstrator
Lars Reuen, 7th Conference on Position Sensitive Devices, Liverpool
Test Beam Measurements october – november, 2016
Presentation transcript:

JRA1 Status: PCMAG, Sensors and Infrastructure Tobias Haas DESY/F1 11 September 2006

Tobias Haas: JRA1 Status This Talk Reminder: JRA1 Reminder: JRA1 Magnet Magnet Sensors Sensors Infrastructure Infrastructure Simulations Simulations Results from MIMO*2 DESY Results from MIMO*2 DESY Personnel/Finances Personnel/Finances

11 September 2006Tobias Haas: JRA1 Status JRA1 General Purpose Test beam infrastructure General Purpose Test beam infrastructure DESY Test beam DESY Test beam PCMAG PCMAG Pixel telescope Pixel telescope high precision (~ 1 µm even in a 6 GeV/c electron beam) high precision (~ 1 µm even in a 6 GeV/c electron beam) reasonably large area (~ 1 – 2 cm) reasonably large area (~ 1 – 2 cm) Fast readout (~1kHz frame rate) to handle higher rate environments Fast readout (~1kHz frame rate) to handle higher rate environments  Staged Implementation Demonstrator telescope with slightly less precision and slower R/O (analog pixel sensor) Demonstrator telescope with slightly less precision and slower R/O (analog pixel sensor) Final telescope with high precision and high rate (pixel sensor with ADC and data reduction on chip Final telescope with high precision and high rate (pixel sensor with ADC and data reduction on chip

11 September 2006Tobias Haas: JRA1 Status WEB info

11 September 2006Tobias Haas: JRA1 Status

11 September 2006Tobias Haas: JRA1 Status Detailed planning constantly being iterated Current Planning now DESY Demonstrator Integration Starts PCMAG Available Demonstrator Available Final Telescope Available

11 September 2006Tobias Haas: JRA1 Status Preparation of Test Beam Area 24/1 for PCMAG EntranceConcrete Block as Base for PCMAG The test beam area has been renovated by MEA (Norbert Meyners). A concrete block is placed in the area as base for the PCMAG. Two holes with Ø 100mm are drilled in the floor, to access the cable trays in the cave, which connect the beam area with the control room A helium return line is installed. Carsten Muhl

11 September 2006Tobias Haas: JRA1 Status PCMAG All administrative issues about the transfer to DESY are clarified. All administrative issues about the transfer to DESY are clarified. Magnet DESY at the end of September Magnet DESY at the end of September Commissioning to take DESY in October Commissioning to take DESY in October KEK Tobias Haas

11 September 2006Tobias Haas: JRA1 Status

11 September 2006Tobias Haas: JRA1 Status

11 September 2006Tobias Haas: JRA1 Status

11 September 2006Tobias Haas: JRA1 Status

11 September 2006Tobias Haas: JRA1 Status

11 September 2006Tobias Haas: JRA1 Status

11 September 2006Tobias Haas: JRA1 Status DUT Positioner x y  10 offers evaluated. 10 offers evaluated. Decision for PI: offers the best price-performance ratio, Decision for PI: offers the best price-performance ratio, Expected precision: few microns, Expected precision: few microns, Ordered complete stage: assembled and surveyed with steering components and software Ordered complete stage: assembled and surveyed with steering components and software Expect delivery in October 2006 Expect delivery in October 2006 Will be set up in the lab for testing in October/November 2006 Will be set up in the lab for testing in October/November 2006 Ready for installation in test beam spring 2007 Ready for installation in test beam spring 2007 Carsten Muhl

11 September 2006Tobias Haas: JRA1 Status Senor Boxes Design is still being iterated: Cooling and fixation will most likely change Carsten Muhl

11 September 2006Tobias Haas: JRA1 Status Cooling for Sensor Boxes and DUT Cold Gas System : +170°C …-180°C (N2-Stream Temperature Accuracy ±0,1°C) Liquefier 1 Liquefier 2 -Large area for evaporator needed  Increases Size of sensor box -2 systems needed between -40°C and +10°C -Slow and complex regulation +No danger ±Standard Components except evaporator Evaporation Cooling Based on R404ARegulated Cold N2 Gas System -Expensive -Safety regulations required +Quick+Precise +Wide range of temperature +DUT cooling possible with the same device 2X! Carsten Muhl

Full simulation: Mokka (based on Geant 4) and MySQL database Full simulation: Mokka (based on Geant 4) and MySQL database Output: LCIO format files Output: LCIO format files Stored information: hit position, deposited energy,... Stored information: hit position, deposited energy,... Analysis: Marlin and Root Analysis: Marlin and Root Simulated events Simulated events Assumed telescope plane intrinsic resolution – 3 um (hit positions are smeared) Assumed telescope plane intrinsic resolution – 3 um (hit positions are smeared) ILC Software Tools Symmetric geometry Asymmetric geometry Telescope Simulations Tatsiana Klimkovich

11 September 2006Tobias Haas: JRA1 Status Validation For small scattering angle Gaussian approximation is used for the width of the projected angular distribution: For small scattering angle Gaussian approximation is used for the width of the projected angular distribution: To check the validity of MS description Simulate silicon wafer of 300 um thickness Simulate silicon wafer of 300 um thickness Shoot 1 GeV electrons ( events) Shoot 1 GeV electrons ( events) Look at the projection of scattering angles Look at the projection of scattering angles Theory prediction: mrad Theory prediction: mrad Tatsiana Klimkovich

11 September 2006Tobias Haas: JRA1 Status First results Comparison of new simulation (Mokka) with Prague simulation (Geant 4) for 6 plane symmetric geometry Comparison of different geometries (Mokka simulation, after cuts on chi2 and track slope): Tatsiana Klimkovich

11 September 2006Tobias Haas: JRA1 Status Precision Studies Analytical Method Analytical Method Includes multiple scattering Includes multiple scattering Piece-wise linear track fit Piece-wise linear track fit Goals: Goals: Cross check simulation Optimize geometry Guidance for the design Understand future analysis challenges Filip Zarnecki

11 September 2006Tobias Haas: JRA1 Status Precision Studies: Results Planned Precision can be reached! Wide choice of geometry configurations are needed depending of DUT details Filip Zarnecki

11 September 2006Tobias Haas: JRA1 Status Mimostar2 – Temperature Scan Simple setup with Strasbourg hardware to do pedestal and source measurements Simple setup with Strasbourg hardware to do pedestal and source measurements Also source measurements were done (Fe55) Also source measurements were done (Fe55) Cooling keeps Mimostar2 at constant temperature Cooling keeps Mimostar2 at constant temperature Temperature Sensor inside cooling box Temperature Sensor inside cooling box Lukasz Maczewski

11 September 2006Tobias Haas: JRA1 Status Pedestal and Noise Distribution Measurements done at 21 o C Measurements done at 21 o C Pedestal is distributed around 0 ADC Pedestal is distributed around 0 ADC Noise in the matrix with the radiation tolerant pixels is higher than in the matrix with the standard pixels Noise in the matrix with the radiation tolerant pixels is higher than in the matrix with the standard pixels Lukasz Maczewski

11 September 2006Tobias Haas: JRA1 Status Temperature Dependence Fit included the energy gap as a third fit parameter Fit included the energy gap as a third fit parameter Energy gaps from this fit: Eg=2.38eV Standard Pixels Energy gaps from this fit: Eg=2.38eV Standard Pixels Eg=2.55eV Rad. Tol. Pixels Eg=2.55eV Rad. Tol. Pixels Standard Pixels Lukasz Maczewski

11 September 2006Tobias Haas: JRA1 Status EU Personnel DESY: DESY: Julia Fourletova, postdoc (7/27) Julia Fourletova, postdoc (7/27) Geneva: Geneva: Emlyn Corrin, postdoc (7/1) Emlyn Corrin, postdoc (7/1) Bonn Bonn Lars Reuen, student (1/1) Lars Reuen, student (1/1) MPI MPI Stefan Rummel, student (2/15) Stefan Rummel, student (2/15) CERN CERN Jerome Alozy, student (9/1)

11 September 2006Tobias Haas: JRA1 Status Finances Geneva Geneva Received: CHF Received: CHF Spent (28 Aug) CHF Spent (28 Aug) CHF Extrapol. Pers CHF Extrapol. Pers CHF Extrapol. Goods CHF Extrapol. Goods CHF CNRS-IRES CNRS-IRES Received: € Received: € Spent (11 Sep)0 € Spent (11 Sep)0 € MPI MPI Received € Received € Spent (11 Sep) € Spent (11 Sep) € Extrapol. Pers € Extrapol. Pers € DESY DESY Received: € Received: € Spent (28 Aug)9.344 € Spent (28 Aug)9.344 € Extrapol. Pers € Extrapol. Pers € Extrapol. Goods € Extrapol. Goods € CERN CERN Received: CHF Received: CHF Spent (11 Sep):0 CHF Spent (11 Sep):0 CHF Extrapol. Pers CHF Extrapol. Pers CHF Extrapol. Goods0 CHF Extrapol. Goods0 CHF UBonn UBonn Received: € Received: € Spent (11 Sep) € Spent (11 Sep) € Extrapol. Pers € Extrapol. Pers € Extrapol. Goods6.000 € Extrapol. Goods6.000 € UMa UMa Received: € Received: € INFN INFN Received: € Received: € UBristol UBristol Received: € Received: € CEA CEA Received: € Received: € Info available: