Project Management Sarah Pearce 3 September GridPP21.

Slides:



Advertisements
Similar presentations
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Advertisements

Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
Deployment metrics and planning (aka Potentially the most boring talk this week) GridPP16 Jeremy Coles 27 th June 2006.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Project Status David Britton,15/Dec/ Outline Programmatic Review Outcome CCRC08 LHC Schedule Changes Service Resilience CASTOR Current Status Project.
RAL Tier1: 2001 to 2011 James Thorne GridPP th August 2007.
LondonGrid Status Duncan Rand. Slide 2 GridPP 21 Swansea LondonGrid Status LondonGrid Five Universities with seven GOC sites –Brunel University –Imperial.
GridPP project management Sarah Pearce 15 September 2009 GridPP Oversight Committee.
GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 11 October 2007 Exec 2 Summary Grid Status: Geographical.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Oversight Committee Meeting.
Level 1 Components of the Project. Level 0 Goal or Aim of GridPP. Level 2 Elements of the components. Level 2 Milestones for the elements.
12th September 2002Tim Adye1 RAL Tier A Tim Adye Rutherford Appleton Laboratory BaBar Collaboration Meeting Imperial College, London 12 th September 2002.
GridPP From Prototype to Production David Britton 21/Sep/06 1.Context – Introduction to GridPP 2.Performance of the GridPP/EGEE/wLCG Grid 3.Some Successes.
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Quarterly report ScotGrid Quarter Fraser Speirs.
Alastair Dewhurst, Dimitrios Zilaskos RAL Tier1 Acknowledgements: RAL Tier1 team, especially John Kelly and James Adams Maximising job throughput using.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
London Tier 2 Status Report GridPP 13, Durham, 4 th July 2005 Owen Maroney, David Colling.
SouthGrid Status Pete Gronbech: 4 th September 2008 GridPP 21 Swansea.
UKI-SouthGrid Overview Face-2-Face Meeting Pete Gronbech SouthGrid Technical Coordinator Oxford June 2013.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
14 July 2004GridPP Collaboration BoardSlide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
D. Britton GridPP Status - ProjectMap 22/Feb/06. D. Britton22/Feb/2006GridPP Status GridPP2 ProjectMap.
GridPP Status Report David Britton, 15/Sep/09. 2 Introduction Since the last Oversight: The UK has continued to be a major contributor to wLCG A focus.
GridPP23 – Final Steps to Data David Britton, 8/Sep/09.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
Monitoring the Grid at local, national, and Global levels Pete Gronbech GridPP Project Manager ACAT - Brunel Sept 2011.
Quarterly report ScotGrid Quarter Fraser Speirs.
Oxford Update HEPix Pete Gronbech GridPP Project Manager October 2014.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Organisation Management and Policy Group (MPG): Responsible for setting and policy decisions and resolving any issues concerning fractional usage, acceptable.
GridPP3 project status Sarah Pearce 14 April 2010 GridPP24 RHUL.
John Gordon STFC-RAL Tier1 Status 9 th July, 2008 Grid Deployment Board.
GridPP3 Project Management GridPP20 Sarah Pearce 11 March 2008.
Tony Doyle - University of Glasgow 1 July 2005Oversight Committee GridPP: Executive Summary Tony Doyle.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Jeremy Coles UK LCG Operations The Geographical Distribution of GridPP Institutes Production Manager.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
Southgrid Technical Meeting Pete Gronbech: 26 th August 2005 Oxford.
11 March 2008 GridPP20 Collaboration meeting David Britton - University of Glasgow GridPP Status GridPP20 Collaboration Meeting, Dublin David Britton,
GridPP: Executive Summary Tony Doyle. Tony Doyle - University of Glasgow Oversight Committee 8 February 2007 Outline Exec 2 Summary Grid status High level.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
User Board Input Tier Storage Review 21 November 2008 Glenn Patrick Rutherford Appleton Laboratory.
GridPP3 project status Sarah Pearce 24 April 2010 GridPP25 Ambleside.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
Production Manager’s Report PMB Jeremy Coles 13 rd September 2004.
Your university or experiment logo here Tier1 Deployment Steve Traylen.
UK Tier 1 Centre Glenn Patrick LHCb Software Week, 28 April 2006.
Rutherford Appleton Lab, UK VOBox Considerations from GridPP. GridPP DTeam Meeting. Wed Sep 13 th 2005.
HLRmon accounting portal DGAS (Distributed Grid Accounting System) sensors collect accounting information at site level. Site data are sent to site or.
Tier-1 Andrew Sansum Deployment Board 12 July 2007.
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
BaBar Cluster Had been unstable mainly because of failing disks Very few (
UKI-LT2-RHUL ATLAS STEP09 report Duncan Rand on behalf of the RHUL Grid team.
Your university or experiment logo here User Board Glenn Patrick GridPP20, 11 March 2008.
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
WLCG Accounting Task Force Update Julia Andreeva CERN GDB, 8 th of June,
Using HLRmon for advanced visualization of resource usage Enrico Fattibene INFN - CNAF ISCG 2010 – Taipei March 11 th, 2010.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
UK Status and Plans Catalin Condurache – STFC RAL ALICE Tier-1/Tier-2 Workshop University of Torino, February 2015.
London Tier-2 Quarter Owen Maroney
ALICE internal and external network
UK MoUs and Tier-1/A experiment shares
Presentation transcript:

Project Management Sarah Pearce 3 September GridPP21

2 GridPP21 Swansea 2/9/08 Reporting – GridPP2

3 GridPP21 Swansea 2/9/08 Reporting – GridPP3 metrics

4 GridPP21 Swansea 2/9/08 Reporting – GridPP3 milestones

5 GridPP21 Swansea 2/9/08 Reporting – GridPP3 manpower

6 GridPP21 Swansea 2/9/08 GridPP 3 reporting - narrative

7 GridPP21 Swansea 2/9/08 GridPP3 reporting – Tier2s

8 GridPP21 Swansea 2/9/08 Project Map GridPP2

9 GridPP21 Swansea 2/9/08 Project Map GridPP3

10 GridPP21 Swansea 2/9/08 Experiments red metrics ATLAS – Tier 1- Job success rate in batch system Tier 1 - Data availability in storage system Tier 2 - Data acceptance from Tier Tier 2 - Job success rates in batch system LHCb MC production (generation) efficiency LHCb SAM tests uptime T1 CMS Time between Data arriving at RAL and being processed Failed analysis jobs Provide an appropriate level of resources to CMS Other experiments % of jobs reported by any experiment as failing due to Grid (MINOS – 45%)

11 GridPP21 Swansea 2/9/08 Grid services Operations red metrics Fraction of UK sites in Production (UCL) Proportion of available jobslots used GridPP deployment web-pages up-to- date Number of sites on VO blacklists Network red metrics Maintenance of Gridmon nodes and associated software Data and storage orange metrics Correctly defined space tokens as per experiments' requirements

12 GridPP21 Swansea 2/9/08 Tier-1 Front end systems – red metrics Availability of LHCb, ALICE and CMS VO boxes Resource delivery – red metrics/ milestones % met of normalised UB allocation for CPU Job Efficiency (CPU/Wall) Farm Occupancy Percentage of GRIDPP3 Staff in Post Disaster and Business Continuity Plan Available Recruitment of additional GridPP3 posts complete Storage systems – red metrics % met of UB Allocation for Disk CASTOR SAM tests: LHC VOs

13 GridPP21 Swansea 2/9/08 Tier-2s Red/orange metrics 4.x.1 - % of promised disk available to GridPP (red for ScotGrid 49% and NorthGrid 86%) 4.x.3 - Average SAM (SLL page) availability performance over the last quarter (70-93%, all Tier-2s) 4.x.4 - Average SAM (SLL page) reliability performance over the last quarter (81-93%, all Tier2-s) 4.x.5 – Average SLL untargeted ATLAS test performance (UK test) (86-94%, all Tier-2s) 4.x.6 - Average SLL SE test performance (70%) 4.x.7/8 - CPU utilisation (wall clock time/ CPU time) (London, SouthGrid and NorthGrid, 23-45%) 4.x.9 - % of disk used (21-39%, all Tier-2s) 4.x.10 – number of technical meetings held (ScotGrid, NorthGrid) 4.x.11 – number of management meetings held (London, SouthGrid)

14 GridPP21 Swansea 2/9/08 Management and external Project execution – GridPP staff in post % of quarterly reports received by Project Manager within 2 months of quarter end Outreach Number of GridPP publications

15 GridPP21 Swansea 2/9/08 ProjectMap figures

16 GridPP21 Swansea 2/9/08 Next steps Finalise Q2 (April – June) quarterly reports and ProjectMap Revise quarterly report template and some metrics Q3 quarterly reports –Request at start of October –First version middle of October –Final version end of October Oversight Committee?

17 GridPP21 Swansea 2/9/08 Conclusion