Engin Ali ARTAN Industrial Engineering

Slides:



Advertisements
Similar presentations
INTERGON Appropriate Risk Behaviour for Rapid Growth Entrepreneurs Dr Lionel Boxer CD June 2006 intergon.net Centre for Management.
Advertisements

The Risk Management Process (AS/NZS 4360, Chapter 3)
The Department of Energy Enterprise Risk Management Model
RISK ANALYSIS.  Almost all of the things that we do involve risk of some kind, but it can sometimes be challenging to identify risk, let alone to prepare.
Risk The chance of something happening that will have an impact on objectives. A risk is often specified in terms of an event or circumstance and the consequences.
How to commence the IT Modernization Process?
Appendix H: Risk training slides (sample). What is Risk? “ Risk is the effect of uncertainty on objectives ” AS/NZS ISO31000:2009.
Mindari Session Scoutsafe and Risk Management By RL Brian See
PROJECT RISK MANAGEMENT
Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Introduction to Risk Management 26 September 2014 Peter Fowler CPPD.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Business Continuity Mark Holloway Former Head of Change Management at Co-operative Food.
1 Continuity Planning for transportation agencies.
Monitoring and Control
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Project management.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
The Australian/New Zealand Standard on Risk Management
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
The Risk Management Process
1 Risk management and Investigation Peter Roberts
HAZARD AND RISK ASSESSMENT. Today’s Session 1.Taking a look at hazard and risk assessment. 2. Definitions. 3.What hazard and risk management does for.
Benefits for using a standardised risk management framework to risk assess Infection Prevention and Control Sue Greig Senior Project Officer National.
CORPORATE RISK MANAGEMENT & INSURANCE BY R P BLAH D.G.M. INCHARGE THE ORIENTAL INSURANCE COMPANY LIMITED REGIONAL OFFICE BHUBANESWAR.
Learning and Development Developing leaders and managers
Business Continuity Check List PageOne. - Why Does Your Business Need A Continuity Checklist? Should the unexpected occur, your business will be able.
37 th OESAI Conference David Lesolle University of Botswana.
Risk Assessment – An Essential Standard
Effectively applying ISO9001:2000 clauses 5 and 8
Risk Management & Liability Informa Brownfield Hospital Development Summit June 2009.
Chapter 11: Project Risk Management
Managing Risks During Tendering and Contract Procurement Tanya Jackson, Principal Consultant.
‘Developing the appraisal process in the wider context of the Sport and Fitness sector of Higher Education’. Welcome & Introductions.
University of Sunderland COM369 Unit 8 COM369 Project Monitoring and Control Unit 8.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Health and Safety Dynamic Risk Assessment Aim To inform the students of the need for and the importance of a risk assessment.
Managing Risk. What is Risk Risk is the chance of things happening that could have an impact on the outcomes it achieves, or on the objectives of the.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 5 Slide 1 Risk management.
Risk Management Policy & Procedures An Overview for Staff Prepared by MSM Compliance Services Pty Ltd.
Maintain Professionalism and skills development Maximise own performance outcomes.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
Developing and Understanding Our Future Workforce MODULE 3 RISK MANAGEMENT TST Consulting and Training.
A paper presented for the TEM Conference, Sydney, Australia 27 th -30 th August 2006 Presentation by Anne Walker, Risk Manager Massey University New Zealand.
Manage Risk through Simple Project Management Peter Williamson Barker College.
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
RISK MANAGEMENT : JOURNEY OR DESTINATION ?. What is Risk? “ Any uncertain event that could significantly enhance or impede a Company’s ability to achieve.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
The Risk Management Process
Kathy Corbiere Service Delivery and Performance Commission
 How well is your organisation prepared for internal or external emergency situations? ◦ Do you consult with relevant emergency agencies? ◦ Do you.
2.7 Risk Management Otama Adventure 3 Credits. 3 Aims for the unit 1. Life Long Learners: Informed decision makers To be aware of risks in outdoor settings.
Risk. Step 1-Risk identification Analyze the project to identify the source of risk Step 2-Risk Asessment Assess risk interms of Severity of impact Likely.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Managing Change Leadership
An Overview on Risk Management
Disaster and Emergency Planning
Learning and Development Developing leaders and managers
Risk Management Policy & Procedures
Risk Register I want to plan a project
Otama Adventure 3 Credits
Learning and Development Developing leaders and managers
Understanding Risk Greg Hungerford.
Edit Nemeth, Vice Chair of IACOP
Edit Nemeth, Vice Chair of IACOP
ENGINUITY TUTORIAL Job Risk Copyright Virtual Management Simulations.
Lecture 2 – Risk Management Process
Chapter 16 Planning and Management of Health Promotion
Robin Youll Office for National Statistics
A New Concept for Laboratory Quality Management Systems
Presentation transcript:

Engin Ali ARTAN 2010503007 Industrial Engineering RISK MANAGEMENT Engin Ali ARTAN 2010503007 Industrial Engineering

What is Risk Management? Risk is defined as “the chance of something happening that will have an impact upon objectives. It is measured in terms of likelihood and consequence". Risk Management is defined as "the culture, processes and structures that are directed towards effective management of potential opportunities and adverse effects".

Risk Management is an integral part of good management Risk Management is an integral part of good management. The application of sound risk management allows for continual improvement in decision making and processes.Effective risk management involves the systematic application of management policies, procedures and practices and should include a clear understanding of roles and responsibilities.

The Risk Management Process Simple Process Risk analysis is best done in a group with each member of the group having a good understanding of the tasks and objectives of the area being analysed.

1. Identify the Risks: As a group, list the things that might inhibit your ability to meet your objectives. You can even look at the things that would actually enhance your ability to meet those objectives eg. a fund-raising commercial opportunity. These are the risks that you face.

2.Identify the Causes: Try to identify what might cause these things to occur eg. the key team member might be disillusioned with his/her position, might be head hunted to go elsewhere; the person upon whom you are relying for information might be very busy, going on leave or notoriously slow in supplying such data etc.

3.Identify the Controls:   Identify all the things (Controls) that you have in place that are aimed at reducing the Likelihood of your risks from happening in the first place and, if they do happen, what you have in place to reduce their impact (Consequence) eg. providing a friendly work environment for your team; multi-skill across the team to reduce the reliance on one person etc.

4. Establish your Likelihood and Consequence Descriptors Remembering that these depend upon the context of your analysis . if your analysis relates to your work unit, any financial loss or loss of a key staff member, for example, will have a greater impact on that work unit than it will have on the University as a whole. So those descriptors used for the whole-of-University (strategic) context will generally not be appropriate for the Faculty, other work unit or the individual.

5. Establish your Risk Rating Descriptors: What is meant by a Low, Moderate, High or Extreme Risk needs to be decided upon ahead of time.

6. Add other Controls:   Generally speaking, any risk that is rated as High or Extreme should have additional controls applied to it in order to reduce it to an acceptable level. What the appropriate additional controls might be, whether they can be afforded, what priority might be placed on them ,is something for the group to determine in consultation with the Head of the work unit who, ideally, should be a member of the group doing the analysis in the first place etc.

7. Make a Decision: Once the above process is complete, if there are still some risks that are rated as High or Extreme, a decision has to be made as to whether the activity will go ahead. There will be occasions when the risks are higher than preferred but there may be nothing more that can be done to mitigate that risk ie. they are out of the control of the work unit but the activity must still be carried out. In such situations, monitoring the circumstances and regular review is essential.

8. Monitor and Review: The monitoring of all risks and regular review of the unit's risk profile is an essential element for a successful risk management program.

Risk Management Flow Chart

Risk Treatment Risk treatment involves identifying the range of options for treating risk, assessing those options, preparing risk treatment plans and implementing them.The options available for the treatment of risks include: Retain/accept the risk - if, after controls are put in place, the remaining risk is deemed acceptable to the organisation, the risk can be retained. However, plans should be put in place to manage/fund the consequences of the risk should it occur. Reduce the Likelihood of the risk occurring - by preventative maintenance, supervision, contract conditions, policies & procedures, testing, investment management, training of staff etc.

Reduce the Consequences of the risk occurring - through contingency planning, contract conditions, disaster recovery & business continuity plans, off-site back-up, public relations, emergency procedures and staff training.

THANKS FOR LISTENING