Answers to Practice Exam #3 Exam May 7 4:00-5:45PM since BE101 has 6:00PM class C-4 due May 9 Set 9 due May 9.

Slides:



Advertisements
Similar presentations
CS 440 Database Management Systems Practice problems for normalization.
Advertisements

A B Q Chord AB is 18. The radius of Circle Q is 15. How far is chord AB from the center of the circle? 9 15 (family!) 12 x.
Project Management - Part 2
Operations Management Session 27: Project Management.
1 Topics to cover in 2 nd part ( to p2). 2 Chapter 8 - Project Management Chapter Topics ( to p3)
Problem Activity Immediate Predecessor a m b A B 4 16
Geometry 5-5 Inequalities in Triangles Within a triangle: – the biggest side is opposite the biggest angle. – the smallest side is opposite the smallest.
In the name of Allah the Most Gracious the Most Merciful.
Fig. 16-CO, p Fig. 16-1, p. 450 Fig. 16-2, p. 450.
X = =2.67.
Analysis of Variance Introduction The Analysis of Variance is abbreviated as ANOVA The Analysis of Variance is abbreviated as ANOVA Used for hypothesis.
Table of Contents Matrices - Multiplication Assume that matrix A is of order m  n and matrix B is of order p  q. To determine whether or not A can be.
Prosjektstyring bma ACTIVITY A B C D E A 4 / 5 / 6 B 8 / 10 / 13 C 9 / 12 / 16 D 7.
Mean, Variance, and Standard Deviation for Grouped Data Section 3.3.
Measures of dispersion Standard deviation (from the mean) ready.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
Rules Get in groups of 4 Answer each question. If you get the question correct, you get to pick a box. At the end of the period we will open the boxes,
Shortest Path Algorithm This is called “Dijkstra’s Algorithm” …pronounced “Dirk-stra”
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Chapter 11 Inferences About Population Variances n Inference about a Population Variance n.
PERT Program Evaluation and Review Technique Tong Wang 511D ERB.
Chapter 4 sections 1 and 2.  Fig. 1  Not connected  All vertices are even.  Fig. 2  Connected  All vertices are even.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Chapter 19 Analysis of Variance (ANOVA). ANOVA How to test a null hypothesis that the means of more than two populations are equal. H 0 :  1 =  2 =
28/07/10 SURDS What is a surd? Manipulating and simplifying surds.
TRANSITIVE PROPERTY of CONGRUENCE and EQUALITY GEO125 TRANSITIVE PROPERTY of EQUALITY: if a = b and b = c, then a = c. If = 9 and = 9, then.
Powers and roots. Square each number a) 7 b) 12 c) 20 d) 9 e) 40 a) 49 b) 144 c) 400 d) 81 e) 1600.
PERT/Activity Diagrams, Completion Probability and the Z Score
PERT/CPM Chart David Nandigam 1. 2 PERT/CPM Chart Task. A project has been defined to contain the following list of activities along with their required.
4.7 Triangle Inequalities. Theorem 4.10 If one side of a triangle is longer than another side, then the angle opposite the longer side is larger than.
Angle-Side Relationship  You can list the angles and sides of a triangle from smallest to largest (or vice versa) › The smallest side is opposite.
2.4 Measures of Variation Coach Bridges NOTES. What you should learn…. How to find the range of a data set How to find the range of a data set How to.
Project Crashing. c=6 e=9 b=6 a=7 f=8 g=5 d=4 Given the information below, what is the total additional cost to crash the project as much as possible?
Estimating a Population Variance
By Meli & Amy & Meggie & Bex. What is route inspection hmmmm??? Objective: Is to go along every single edge and end up back to where you started from.
 If three sides of one triangle are congruent to the three sides of another triangle, then the two triangles are congruent.  If AB = DE, BC = EF, AC.
Hosted by Mrs. Luck Factors Matchers Sooo P/C! Square or Root? What’s My Rule?
7.2 Means & Variances of Random Variables AP Statistics.
Set 7 due today Set 8 due April 18 C-3 due April 18 Exam May 7.
5-1 Scheduling The Project. Outline: 5-2  Project network diagrams  Identifying critical paths and activities  Determining activity slack times  Gantt.
2.4 Measures of Variation The Range of a data set is simply: Range = (Max. entry) – (Min. entry)
Unit 3 Chinese Postman. Non - Eulerian Semi - Eulerian Eulerian.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Review X = {3, 5, 7, 9, 11} Range? Sum of squares? Variance? Standard deviation?
Network Diagram Prob 1 Activity Predecessor Duration (days) A None 2 B
PERT & GANTT CHARTS An Introduction.
ESSENTIAL QUESTION: How to use triangle measurements to decide which side is longest and which angle is largest?
Similar Triangles Section 7.4
Estimating a Population Variance
Combinations COURSE 3 LESSON 11-3
Set up ratios: = = Fill in ratios: Solve the proportion: =
تصنيف التفاعلات الكيميائية
Measure of Dispersion Problem solving.
4.3 Paths in Relations and Digraphs
Probability Review for Financial Engineers
Chapter 2: Factoring Chapter 2: Limits Chapter 3: Continuity.
Example: If line AB is parallel to line CD and s is parallel to t, find the measure of all the angles when m< 1 = 100°. Justify your answers. t
Shortest path algorithm
Coding in the form y = a + bx
AB AC AD AE AF 5 ways If you used AB, then, there would be 4 remaining ODD vertices (C, D, E and F) CD CE CF 3 ways If you used CD, then, there.

Exploring Partially ordered sets
2.5 Reasoning Using Properties from Algebra
Standard Deviation How many Pets?.
SURDS What is a surd? Manipulating and simplifying surds.
The Distance and Midpoint Formulas
PERT/Activity Diagrams, Completion Probability and the Z Score
If AD = 10, DC =6, and ED = 15, find DB.
Homework Solutions.
AP Physics Chapter 2 Answers
Jan 2009.
Presentation transcript:

Answers to Practice Exam #3 Exam May 7 4:00-5:45PM since BE101 has 6:00PM class C-4 due May 9 Set 9 due May 9

1.PERT ACTESEF A09 B010 C914 D912 E: MAX(10,14)=1420 F: MAX(12,20)=2024=E(x) G1417

ANSWER T0 (a)=MAX EF=24 ACTLFLS A: MIN(9,17)=90 B:144 C: MIN(14,21)=149 D2017 E2014 F2420 G2421

ANSWER(b):A-C-E-F ACTSLACK=LF-EFCRIT PATH? A:9-9=0Y B:14-10=4 C:14-14=0Y D20-12=8 E20-20=0Y F24-24=0Y G24-17=7

1C: CRITICAL PATH VARIANCE= SUM OF VARIANCES ON CP= VARIANCES OF A,C,E,F = =5.2 =5.2 STANDARD DEVIATION = SQUARE ROOT OF 5.2 = 2.28

NORMAL TABLE Z=(27-24)/2.28 = 1.32 ROW 1.3 COL 0.02 =.02 CUMULATIVE PROB = =.9066 FROM TAYLOR, P 738

2. SHORTEST ROUTE A-B10 A-D3 A-C2=MIN

A-C ADDED A-B 10 A-D 3=MIN C-D2+3=5 C-F2+8=10

A-D ADDED A-B 10 C-F 10 D-B3+6 = 9 D-E3+2 = 5=MIN D-F3+9=12

D-E ADDED A-B10 D-B9 C-F10 D-F12 E-F5+3=8=MIN

E-F ADDED A-B10 D-B9=MIN

EXAM FORMAT A-D-B9 A-C2 A-D3 A-D-E5 A-D-E-F8

3. BAYES RULE P(PROFIT)=.52 P(S|PROFIT)=.85 P(S|NOT PROFIT) =.25 S= SUCCESSFUL P(UNPROFITABLE)=1-P(PROFIT)= 1-.52=.48

P(PROFIT|S).85*.52 =.79.85* *.48