Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.

Slides:



Advertisements
Similar presentations
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Advertisements

AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Electron and Ion Spin Dynamics in eRHIC V. Ptitsyn Workshop on Polarized Sources, Targets and Polarimetry Charlottesville, VA, 2013.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
May 17, 2005Wednesday Experiment Meeting BNL, Upton Acceleration beyond 100 GeV  Goal To evaluate the spin dynamics beyond 100 GeV  What’s the impact.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
ERHIC design status V.Ptitsyn for the eRHIC design team.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
Crossing transition at RHIC V.Ptitsyn, N.Abreu, M. Brennan, M.Blaskiewicz, W. Fischer, C. Montag, R. Lee, S.Tepikian.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
APEX Status and Plan Phil’s Meeting, March 20, 2012 M. Bai.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
Luminosity Optimization for FCC-ee: recent results
eRHIC with Self-Polarizing Electron Ring
LHC (SSC) Byung Yunn CASA.
MEIC New Baseline: Performance and Accelerator R&D
Presentation transcript:

Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL

V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown to liquid He temperatures.  12 Feb - End of cooldown and PS tests  5 Mar – Start of the 100 GeV Physics Run. Participating experiments: STAR and PHENIX. PHENIX – radial pol ; STAR – long pol  6 Apr – PHENIX – radial pol ; STAR – vertical pol  14 April –21 April – unscheduled shutdown (investigation of electric accident)  26 Apr – PHENIX – longitudal pol; STAR – vertical pol  10 May – PHENIX – longitudal pol; STAR – longitudinal pol  5 Jun – End of 100 GeV run. (12 weeks total )  5 Jun-6 Jun, 11 GeV accelerator development  6 Jun – Start of 31.2 GeV Physics Run. Participating experiments: STAR, PHENIX and BRAHMS PHENIX – longitudal pol; STAR and BRAHMS– vertical pol  20 Jun - End of 31.2 GeV Run. (Two weeks total)  20 Jun – 26 Jun. 250 GeV accelerator development  26 Jun - 30 Jun warm-up to liquid N temperatures.  30 Jun - End of Run-6. (21.2 weeks of cryo operation)

V.Ptitsyn RHIC Spin Workshop 2006 Physics run lattices IP6IP8IP10IP12IP2IP4 Injection10 Store, 100 GeV1110 Store, 31.2 GeV Lattice modifications : - minimized excursion of dispersion function in IR6 and IR8 in the store at 100GeV - decreased gamma_t lattice at the injection Working points: ( ) box at the injection; ( ) box at the store Tune swing done: 100GeV: at the very end of the acceleration, but before final beta-squeeze part of the ramp 31.2GeV: right before the last stone of the ramp Beta* configuration (in meters):

V.Ptitsyn RHIC Spin Workshop 2006 Polarized protons performance at 100 GeV (last three runs) ParameterUnit No. of bunches bunch intensity ** m1 1 1 emittancemm mrad peak luminosity10 30 cm -2 s average luminosity10 30 cm -2 s collision points--432 time in store% average polarization, store % % Luminosity gain in run-6: 2.2 X 1.5 = 3.3 Increased bunch intensityImproved emittance control AGS cold snake: polarization Reduced number of collision points

V.Ptitsyn RHIC Spin Workshop 2006 Integrated luminosity; 100 GeV run one week shutdown

V.Ptitsyn RHIC Spin Workshop 2006 Average integrated luminosity per store hour and Time in store 8 weeks luminosity improvement period Considerable amount of down time in the middle and at the end of the run Luminosity slides at the end of the run due to longer stores

V.Ptitsyn RHIC Spin Workshop 2006 Golden store #7909 of 100 GeV run Luminosity

V.Ptitsyn RHIC Spin Workshop 2006 Run-5 Average Pol 49% 45% Polarization during 100 GeV run

V.Ptitsyn RHIC Spin Workshop GeV run: Luminosities and transverse emittances Improved transverse emittance control was important item at this run During the run the improvements to achieve smaller transverse emittance were done both in the injectors and in the RHIC: Transverse scraping in Booster Strict control of emittance from AGS (golden values) appropriate choice of working point (to avoid coherent beam-beam) keeping bunch length long enough W.Fischer

V.Ptitsyn RHIC Spin Workshop 2006 Transverse emittance Run-5 emittance troubles:  Larger emittance with larger number of bunches  Larger emittance from AGS on several fills In Run-6 those problems were avoided Helped by vaccuum system improvements:  additional NEG pipe coating (180m) added between the runs  upgrade in cold region vaccuum S.Y.Zhang

V.Ptitsyn RHIC Spin Workshop 2006 Integrated luminosity; 31.2 GeV run

V.Ptitsyn RHIC Spin Workshop 2006 Major operation achievements Successful application of tune/decoupling feedback for the initial ramp development. Fast collimation. Regular orbit correction at the beginning of the store (before the cogging) to provide the store reproducibility against 24h orbit variation. IR nonlinear corrections: used not only at the store but also on the ramp (after the beta-squeeze). 2/3 resonance correction Successful demonstration of “quad pumping” technique to provide better AGS-to-RHIC longitudinal emittance matching. Unfortunately, could not be effectively used because of the transverse emittance deterioration. Developed Beam Transfer Function measurement diagnostic. Rotator reconfiguration (done 5 times during the run). Takes 8h stores.

V.Ptitsyn RHIC Spin Workshop 2006 Factors limiting machine performance Store lifetime: Q x =2/3 resonance beam-beam effects large momentum spread Factors affecting transverse emittance: small longitudinal emittance and higher beam intensity (enhanced electron cloud effect) emittance increase on the ramp (?) Deterioration of ramp transmission with the beam intensity Beam oscillations with parasitic frequencies 10Hz, 60Hz, … (coming from cryo and power supply systems)

V.Ptitsyn RHIC Spin Workshop 2006 Further plans Christoph Montag is the Run coordinator for next polarized proton run. Goal: doubling the luminosity, by bunch intensity increase and increased time in store

V.Ptitsyn RHIC Spin Workshop 2006 Luminosity improvement factors for next run Luminosity improvement factors for next run  Nonlinear chromaticity correction  10Hz IR orbit feedback  2/3 resonance compensation  New working point test, ~(0.92;0.93)  Additional NEG pipes (~45m)  Reliability of various machine systems is seriously addressed in this shutdown.  In more remote plans the application of new 9.3Mhz RF cavity system is considered (M.Brennan). This should allow for smaller longitudinal emittance and smaller bunch length in the store, but long enough bunch length at the injection.

V.Ptitsyn RHIC Spin Workshop 2006 Conclusions  On accelerator part we believe the run was quite successful.  Good side: Luminosity goals are achieved. Improved machine parameters (beam intensities, emittances, polarization).  Bad side: Machine reliability problems. Goal for the time in store was not achieved.  Continue go forward. For next run:  Further luminosity improvements (by factor 2).  Improved machine reliability