CERN Trip Report: April 4-8, 2011 LAFS Work Elliott McCrory April 20, 2011.

Slides:



Advertisements
Similar presentations
Design, prototyping and construction
Advertisements

IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
The Premier Software Usage Analysis and Reporting Toolset CELUG Presentation – May 12, 2010 LT-Live : License Tracker’s License Server Monitor.
Commissioning LHC Beam Instrumentation for Nominal Bunch Intensities Beam Commissioning Working Group June 15 th 2010 Rhodri Jones (CERN Beam Instrumentation.
MICE RF & Controls Paul Drumm. RF Layout 2 MW Amplifier Master Oscillator Controls etc 201 MHz Cavity Module 2 MW Amplifier 201 MHz Cavity Module CERN.
Avra Software CMPUT Process Quality and Software Assessment Case Study - slide#1©P. Sorenson and Amr Kamel Assessment Plan for Assessment Plan for.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team 28 January 2009 Presented by Elliott McCrory.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
PRODUCT FOCUS 3/31/14 – 4/11/14 INTRODUCTION Our Product Focus for the next two weeks is Microsoft’s Lync. Over 70% of the Fortune 500 have adopted Lync.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
Nicole Hu, User Testing John Newcomb, Documentation Lakshmi Prathivadi, Team Manager Prasanth Veerina, Development GoalFriends Design Team Making exercise.
ACNET Alarms Brian Hendricks October 18, Alarm Types analog – simple comparison to minimum and maximum values single set of limits digital – nominal.
CPTE 209 Software Engineering Summary and Review.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Oracle Application Express 3.0 Joel R. Kallman Software Development Manager.
Visibility and promotion of your team inside Company How to sell results of your team?
المحاضرة الثالثة. Software Requirements Topics covered Functional and non-functional requirements User requirements System requirements Interface specification.
Impressions from CERN Elliott McCrory February 1, 2006.
Dessy, 17 september 2007 Tango Meeting Development of Tango Client Applications in Python Tiago Coutinho and Josep Ribas.
CERN – European Organization for Nuclear Research Administrative Information Services Demonstration of 3 HTMLDB-based applications 1 IT-AIS-HRMarch 17.
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
The Network Performance Advisor J. W. Ferguson NLANR/DAST & NCSA.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Chapter 6: Systems Development Steps, Tools, and Techniques Management Information Systems for the Information Age.
Same, great system. New, improved interface New meetings management tool Detailed profile display Improved search engine Printable schedule 1:1 partnering.
T Final demo I2 Iteration Agenda  Product presentation (20 min) ‏  Project close-up (20 min) ‏ Evaluation of the results  Questions.
Stephane Deghaye (AB/CO) ATC/ABOC days.
New perfSonar Dashboard Andy Lake, Tom Wlodek. What is the dashboard? I assume that everybody is familiar with the “old dashboard”:
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Jean Slaughter -Feb 24, 2004 Shot Data Responsible for physics analysis of shot data Oversees the development of shot data analysis tools Responsible for.
Application Development for Operations in the Coming Years Mike Lamont.
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
CS 490 Software Testing Fall 2009 Implement Unit Test Framework for Application running on a Pocket PC 2003 device 09/18/091 Framework for Unit-testing.
Strictly Business Using “StrictlyFused” to Create an Extensible Knowledge Portal.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Master Plan Process FY Proposed Draft. October - February Cluster Groups and Units Identify Initiatives These are general goals or outcomes that.
Presentation.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
1 Technical Communication A Reader-Centred Approach First Canadian Edition Paul V. Anderson Kerry Surman
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Instrumentation of the Controls Configuration Directory Service J. Luis González Arias BE3528 Software Developer for the Accelerator Controls Configuration.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
BI Offline Algorithm Framework Some Examples of What It Can Do for Us.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
CS 490 Software Testing Fall 2009 Implement Unit Test Framework for Application running on a Pocket PC 2003 device 10/16/091 Framework for Unit-testing.
The Dashboard The Working Conditions The Common Chapters State What’s Next.
First Ideas – New Wire Scanner GUI - LHC V. Kain, G. Crockford, M. Kuhn Emittance Working Group 6/26/
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Acme Packet Palladion 04/26/12. Palladion Software Suite 5/26/122 Acme Packet confidential.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
5. CSA data mining: Alpha version Only key datasets Some combined Time periods returned Combined with time CSA profiles All data used will be downloadable.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
Control System Tools for Beam Commissioning Timo Korhonen Controls Division Chief Engineer April 8, 2014.
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
LHC dry-runs (BE-BI view)
Presentation transcript:

CERN Trip Report: April 4-8, 2011 LAFS Work Elliott McCrory April 20, 2011

Outline  People  Jones and Lars (BI)  Sigerud & Deghaye (CO/AP)  Hatziangeli  Lamont  And, of course, Lahey.  Projects  Existing work  Potential Future Work  Personnel LAFS 2 20 April 2010

USD/CHF LAFS 3 20 April CHF = $ (!)

Summary of Discussions  Beam Instrumentation Folks  Rhodri Jones & Lars Jensen Satisfied with Schottky work Proposed a new Daemon/GUI project for bunch-by-bunch measurement and display –Details coming…  BE/CO/Applications Folks  Katarina and Stephane They strongly acknowledge the good work that the LAFS team has provided and can provide –RBAC –Daemon Infrastructure –Operations Applications Propose a new project to help with InCA (Injector Controls Architecture) and LSA database configurations. –Details coming… LAFS 4 20 April 2010

Department Heads  Eugenia (BE/CO)  Will initiate the creation of a new M.O.U. for our bosses (Paul Collier and Roger Dixon)  Mike (BE/OP)  Described the week’s work, and the status of LAFS  They said  Words of encouragement  Would like to see more contributions LAFS 5 20 April 2010

Status of Existing Work Supertable Wire Scanner App Schottky Suite BSRT (Synchrotron Light) App

Supertable  Taken over by BE/CO (Mario Pereira)  Prototype is working   Not online: Need work from DM LAFS 7 20 April 2010

Wire Scanner  Bunch-by-bunch capabilities fully integrated  Listened to lots of criticism/suggestions for improvement. LAFS 8 20 April 2010 New

New Feature: Mountain Range LAFS 9 20 April 2010

Schottky Suite  Daemon and GUI  Only bunch-by-bunch device active!  Well, there’s the Fast BCT, too.  BSRT is almost there.  Used extensively  Favier, Pieloni, Mounet  Just implemented:  Play List  Save/Restore LAFS April 2010

Schottky Emittances LAFS April 2010

LAFS April 2010

Slot Selection GUI LAFS April 2010

Schottky Play List LAFS April 2010

Schottky Save/Restore LAFS April 2010

Synchrotron Light  Unclear future for LAFS  They proposed that we write a Daemon  Started in early February  Was not accepted (late February)  Talk of having a new GUI created  Not good  Terri and I are paying attention! LAFS April 2010

Proposals BI: Bunch data display CO/AP: LSA Config GUIs

Project Proposal: BI Bunch GUI  A new BI GUI  Imagined by Rhodri, Lars and Jean-Jacques Gras  Basics:  Gather bunch-by-bunch info from all BI devices that do bunch- by-bunch Schottky (Daemon) Fast BCT BSRT (soon)  Concentrated in one place a Daemon  Republish in coherent manner  Create a GUI Configure the Daemon Allow easy access to all bunch-by-bunch data  Proposal letter (pre-requirements) coming  Audience: LAFS team, BI group, P. Collier and R. Dixon. LAFS April 2010

Proposal: LSA DB Config GUIs  Katarina and Stephane  Need a simpler way to configure the LSA device database  LSA Database being pushed into injector  Have existing tools, but must be replaced  Configure front ends directly, through a non-standard interface  But easy for PS-Complex operators to use  LHC/SPS Situation?  Only Extreme experts can configure  Requires raw SQL (through Benthic) LAFS April 2010

LSA DB Config GUIs, cont’d  A limited number of GUIs are required  Less than ten?  But we would develop the pattern for making more  Stephane will write a proposal letter  Target: LAFS team, E. Hatziangeli, M. Lamont, P. Collier and R. Dixon.  Proposed team:  Deghaye would be the liaison  Katarina and Mike would designate a “customer”  LAFS team will decide on a work group LAFS April 2010

Proposals: Next steps?  Awaiting these documents  Jones (Bunch data concentrator and GUI)  Stephane (LSA Configuration GUIs)  Eugenia (M.O.U. proposal)  Analyze LAFS work force  Now: 1.x FTE (Jerry and me), plus Terri.  Can we increase that number? Are *YOU* interested in these new projects??? LAFS April 2010

Personnel  Liaison  Terri returns to SLAC soon Officially: May 31 Would like to extend  We have requested for Suzanne to be at CERN starting in October Support from Prebys and Dixon Official approval is pending  Elliott and Jerry C.: ~full time  The End LAFS April 2010