VERMONT COMMUNICATIONS (VCOMM) March 2, 2006.

Slides:



Advertisements
Similar presentations
APPLICATIONS OF ANN IN MICROWAVE ENGINEERING.
Advertisements

Source: GSM Association, 2010 Mobile Networks. Source: GSM Association, Coverage and Capacity Mobile communications networks are designed for both.
Propagation Requirements for Broadband Fixed Wireless Access Dr M.J. Willis Radio Communications Research Unit Rutherford Appleton Laboratory
Test Automation Success: Choosing the Right People & Process
Satellite Communication and Forest Protection The Use and Application of Satellite Communications in Forest Protection.
1 The process of analyzing all core business functions and establishing an optimized timetable for recovery. Provides baseline for:  Justification for.
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
Georgia Interoperability Network
Radio Interoperability Initiative. Problems Facing Public Safety Communications Technology  Higher Frequencies  Lower Power  Trunking  User Expectations.
Update on Communications in Butler County Butler Regional Interoperable Communications System Presented to Township Trustees Association January 13, 2011.
1 Channel Assignment Strategies Handoff (Handover) Process Handoff: Changing physical radio channels of network connections involved in a call,
1 Kentucky’s Public Safety Awareness Initiative Program Spectrum Management January 00, 2005.
Network Design and Implementation
The Technical and Market Study for WiMAX Name: GAO FENG Department: Wireless Communication and Networking.
Overview.  UMTS (Universal Mobile Telecommunication System) the third generation mobile communication systems.
WICI Presentation to FLEWUG Application of “Soft” & “Hard” Technology to Improve Capacity & Quality in Land Mobile Radio Networks June 13, 2000 Enlightening.
Page 1 Portland State University – BA 495 – SP 03 DRAFT Framework Team One - Point of Sale Systems Implementation - June 12, 2002.
IACT 901 Module 9 Establishing Technology Strategy - Scope & Purpose.
Survivability Considerations for Design of Government Private Wireless Networks Clay Whitehead Motorola Networks and Enterprise.
Mark Hoppe Andrew Maxymillian Saratoga County System Design Review.
Overview and Next Steps 8/27/2015.
Bucks County Commissioners James F. Cawley, Esq., Chairman Charles H. Martin, Vice Chairman Diane M. Ellis-Marseglia, LCSW David M. Sanko, Chief Operating.
Telecommunications Issues for Wind Power Facilities Interdepartment Radio Advisory Committee Presentation June 14, 2005.
IXth European Interparliamentary Space Conference Eutelsat Astrid Bonté, Responsible for Institutional Relations. Rome, October 8th 2007.
Site on Wheels AWIN Network Support. Table of Contents What is a Site on Wheels (SOW)? How does a SOW differ from a COW? When should a SOW be deployed.
Capacity of Wireless Mesh Networks: Comparing Single- Radio, Dual-Radio, and Multi- Radio Networks By: Alan Applegate.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
1 Is there a requirement for a Commercial TETRA Operator in Venezuela? Caracas, September 20th 2005.
Learning Lab DO05 Operating in the Next Generation of HF Radio: Automatic Link Establishment (ALE) Operating in the Next Generation of HF Radio: Automatic.
SMART ANTENNA under the guidance of Mr. G.V.Kiran Kumar EC
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved BUSINESS PLUG-IN B21 Mobile Technology.
1 ETM 5121 Project Proposal Determination of How to Handle Contract Craftsmen Employees in the SAP Plant Maintenance Module of ABC, Inc.’s Illinois Refinery.
WIRELESS REVOLUTION Robert Boyd Robert Wall Wanda Mattie.
Using TSB-88 Region MHz Using TSB-88 to insure frequency usage does not cause interference in Region 5.
Presentation of projects’ ideas. 1. Madrid Network “A public-private network which aim is to contibute actively to position Madrid Region in the top.
Bledsoe et al., Paramedic Care Principles & Practice Volume 2: Patient Assessment © 2006 by Pearson Education, Inc. Upper Saddle River, NJ Chapter 5 Communications.
EPL 476 Fundamental Concepts in Wireless Networks
Narrowbanding Update Time is Growing Short Bill Waugaman L. Robert Kimball & Associates.
From the Installation and Certification Group to the Engineering and Development Section Patrick Grenard Chief, Engineering & Development, IMS Vienna International.
Geo-localisation in CERN’s underground facilities CERN has recently deployed a digital radio network, based on TETRA technology, to be used by the Fire.
S MART A NTENNA B.GANGADHAR 08QF1A1209. ABSTRACT One of the most rapidly developing areas of communications is “Smart Antenna” systems. This paper deals.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
M ICHAEL B AKER C ORPORATION Operations & Maintenance Information The Way Forward.
Communications.
Vidya Bharathi Institute of Technology
Innovative Applications: Satellite Deployment for Emergency Backup Presented by Mark Ayers, GCI.
– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.
Section 6 Wideband CDMA Radio Network Planning. Radio Network Planning A radio network planning consists of three phases: 1.Network Dimensioning (using.
Incorporating Connected/Automated Vehicles into the Transportation Planning Process November, 2015 Max Azizi US DOT.
Chapter 12 The Network Development Life Cycle
* HISTORY REVIEW. * The paging system consists. * The paging system components. * The advantages of paging. * Disadvantages of Paging. *BASIC PARTS.
Decision Making Matrix A Closer Look at Preliminary Ideas.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
NATO UNCLASSIFIED 1 TETRA Applications for Military Communications Radio Branch NATO Command, Control & Consultation Agency Radio Branch NATO Command,
PREPARED BY: MUHAMMAD TALHA ISLAM SECTION C 2010-TE-054 TELECOMMUNICATION ENGINEERING DEPARTMENT.
Software architecture is the high- level structure of a software system. It has no concrete definition but can be best described as an organizational.
Unit 4 Cellular Telephony
[1] TECHNICAL SEMINAR PRESENTATION SMART ANTENNA Edited by: Priyabrata Nayak, Lecturer, Dept. of CSE SMART ANTENNA.
Lecture 02 EEE 441: Wireless And Mobile Communications BRAC University.
Proprietary and Confidential – Use or distribution subject to restrictions on first page TerreStar Global Connectivity no matter where you are driving.
SMART ANTENAS Presentation by Mr. Sahil Tarfe Mr. Siddhesh Sonawdekar.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Systems Analysis and Design in a Changing World, 4th Edition
SMART ANTENNA.
SKILL ASSESSMENT OF SOFTWARE TESTERS Case Study
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Strategic Planning in Dynamic Times
SMART ANTENNA.
Bangladesh Army University of Engineering & Technology.
Presentation transcript:

VERMONT COMMUNICATIONS (VCOMM) March 2, 2006

Topics Steps to Functional RFP Steps to Functional RFP –Channel Plan –System Inventory –Design Criteria Dispatch Study Dispatch Study

Channel Plan Voice communications Voice communications Voice paging Voice paging Mobile data Mobile data Narrow banding Narrow banding Frequency pooling Frequency pooling Frequency reuse Frequency reuse Determine needed channel capacity based on 95%/95% Determine needed channel capacity based on 95%/95% Develop channel plan Develop channel plan

System Inventory and Coverage Snapshot of current systems Snapshot of current systems Base stations (Transmitters and receivers) Base stations (Transmitters and receivers) –Location –Antenna –ERP –Frequencies –Coverage (Propagation Study) Mobiles Mobiles Portables Portables Pagers Pagers

Design Criteria Geographic coverage Geographic coverage Coverage standard (95%/95%?) Coverage standard (95%/95%?) –Mobile/Portable/Pager Capacity Capacity Analog/Digital/P25/Narrow-Band Analog/Digital/P25/Narrow-Band One or two radio solution One or two radio solution System of Systems System of Systems –Gateways –How to phase

Functional RFP System Inventory Channel Plan Functional RFP Design Criteria

Macro Dispatch Study Next Steps Next Steps –Identification of current and accurate dispatch call volume data for demand projections, staffing plans, and network capacity planning –Analysis of operating expenses and other associated costs in support of financial models of the intended restructured environment for establishing/negotiating “fees for service”

Macro Dispatch Study Next Steps (Continued) Next Steps (Continued) –Assessment of people factors for role definition, current capabilities, skills development, or management potential, career path mapping, or training programs – creation of a human resources plan if one does not exist. –Documentation of current practices for standardization and best practices transitions –Preliminary engineering to identify facility or network alteration requirements in addition to deployment of new mobile data and two-way radio capabilities, and enhancing security and survivability of public safety communications services.

Dispatch Facilities

Dispatch RFP Develop RFP (Based on Summer Study Committee and Macro Reports) Develop RFP (Based on Summer Study Committee and Macro Reports) Define Current System Define Current System –Current configuration of dispatch –Inventory of equipment at each dispatch facility –Inventory of current staffing at each dispatch facility –Current operating costs at each dispatch facility –Call volume current at each dispatch facility –Time and motion study of selected facilities

Dispatch RFP Define Future Needs Define Future Needs –Call volume future 5 and 10 year projection –Security –Diversity of communications links –Redundancy and fault tolerance –Links to other systems

Dispatch RFP Development and evaluate alternatives to meet current and future needs Development and evaluate alternatives to meet current and future needs –Integration with two-way radio and data systems –Integration with new E9-1-1 system –Staffing –Estimate costs –Methods to assess costs to users –Analysis of Pros and Cons of Dispatch RFP

Dispatch RFP Develop Recommended Standards and Practices Develop Recommended Standards and Practices –Standard Operating Procedures –Recommended Training –Assessment of Costs

The End QUESTIONS?