BDS at reduced beam parameters 2nd Baseline Assessment Workshop on Reduced Beam Parameter set Andrei Seryi John Adams Institute 19 January 2011.

Slides:



Advertisements
Similar presentations
The ILC low power option Andrei Seryi SLAC ILC08 and LCWS08 November 17, 2008 Photo: Dan Chusid, 2003.
Advertisements

Status Report to ATF2 Technical Board Brett Parker, BNL-SMD URL : 11th ATF2 Project.
ILC Accelerator School Kyungpook National University
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
Proposed machine parameters Andrei Seryi July 23, 2010.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Matching recipe and tracking for the final focus T. Asaka †, J. Resta López ‡ and F. Zimmermann † CERN, Geneve / SPring-8, Japan ‡ CERN, Geneve / University.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
DESY GDE Meeting Global Design Effort 1 / 12 Status of RTML Design and Tuning Studies PT SLAC.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Optimization of L(E) with SB2009 Andrei Seryi, for BDS and other working groups LCWS 2010 / ILC 2010 March 28, 2010.
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Study of alternative ILC final focus optical configurations Dou Wang (IHEP), Yiwei Wang (IHEP), Philip Bambade (LAL), Jie Gao (IHEP) International Workshop.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
Principals of fast injection and extraction R. Apsimon.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
Beam Delivery System Summary Andrei Seryi LCWS 2010 / ILC 2010 March 30, 2010.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
From Beam Dynamics K. Kubo
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
SC Quadrupole Magnets in ILC Cryomodules
Large Booster and Collider Ring
AD & I : BDS Lattice Design Changes
ILC BDS Emittance Diagnostics: Design and Requirements
Beam Delivery System Schedule at ILC2010
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
IR Lattice with Detector Solenoid
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Upgrade on Compensation of Detector Solenoid effects
Crab Crossing Named #1 common technical risk (p. 6 of the report)
ILC Beam Switchyard: Issues and Plans
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

BDS at reduced beam parameters 2nd Baseline Assessment Workshop on Reduced Beam Parameter set Andrei Seryi John Adams Institute 19 January 2011

Outline Layout and optics Parameters and luminosity in details FD updates Simulation of TF generation by transverse cavity –Separate presentation (N.W.) Wang-Gao-Kubo parameters A. Seryi, 19 Jan 2011, BAW Global Design Effort 2

e-BDS Sacrificial collimators + chicane to detect off energy beams Fast abort line Undulator Dogleg Skew correction & emittance measurement Chicane to detect LW photons DC Tuning line Polarimetry chicane Betatron collimation Energy collimation Final Focus IP SB2009 e- BDS Changes on e- side due to central integration : dogleg design & tolerances Separated polarimeter chicane from RDR combined functionalities. D. Angal-Kalinin et al A. Seryi, 19 Jan 2011, BAW

Global Design Effort 4 e-BDS Sacrificial collimators + chicane to detect off energy beams Fast abort line Undulator Dogleg Skew correction & emittance measurement Chicane to detect LW photons DC Tuning line Polarimetry chicane Betatron collimation Energy collimation Final Focus IP SB2009 e- BDS

A. Seryi, 19 Jan 2011, BAW Global Design Effort 5 SB2009 e- BDS Optics

A. Seryi, 19 Jan 2011, BAW Global Design Effort 6  Theoretical Minimum Emittance (TME) lattice. The Dogleg Design  Provides 1.5m offset in ~400m  Emittance growth is ~3.8% (1TeV CM)  Decimation of dipoles is possible  The first and last dipoles in each of the two bending sections have lower bend angles to match the dispersion into, and out of, the dogleg.  These dipoles can be used to match and correct incoming errors to minimise the emittance growth seen in the dogleg sections.

A. Seryi, 19 Jan 2011, BAW Global Design Effort 7 Separated polarimetry chicane, combined functionality of laser wire and MPS still in the same chicane. Need laser wire simulations to see if this is okay. LW photon s+ MPS Polarimetr y chicane Positron BDS

A. Seryi, 19 Jan 2011, BAW Global Design Effort 8 Shortening of Energy Collimation and Final Focus  Emittance growth GeV beam for RDR.  First attempt to reduce the FFS length of push-pull deck by R. Versteegen (CEA).  Multiplied all the dipole lengths and drifts by 0.87 in the energy collimator and the FFS in order to approximately double emittance growth in these sections.  Re-tuned linear optics and sextupoles to optimise the luminosity and the bandwidth. 250 GeV 500 GeV 250 GeV 500 GeV Push-pull long Push-pull short

A. Seryi, 19 Jan 2011, BAW Global Design Effort 9 Beam Parameters Rate at IP = 2.5Hz, Rate in the linac = 5Hz (every other pulse is at 150GeV/beam, for e+ production) Low luminosity at this energy reduces the physics reach

A. Seryi, 19 Jan 2011, BAW Global Design Effort 10 L,E34 E CM 1/E 0.5/E 0.25/E 0.5/E SB2009 Lumi Actual luminosity Rate at IP = 2.5Hz, Rate in the linac = 5Hz (every other pulse is at 150GeV/beam, for e+ production) Low luminosity at this energy reduces the physics reach

A. Seryi, 19 Jan 2011, BAW Global Design Effort 11 Work on mitigations of L(E) with SB2009 during and after ILC2010 Discussion of double rep rate was initiated ~month before the ILC2010 this allowed achieving significant progress at LCWS10 Doubling the rep rate (below ~125GeV/beam) –BDS WG discussed implications with other Working Groups: DR => ~OK (new conceptual DR design; duty factor issue) Sources => OK Linac, HLRF, Cryogenics => OK FD optimized for ~250GeV CM –Shorter FD reduce beam size in FD and increase collimation depth, reducing collimation related beam degradation –Will consider exchanging FD for low E operation or a more universal FD that can be retuned

A. Seryi, 19 Jan 2011, BAW Global Design Effort 12 Lumi(E) dependence in SB2009 Factor determine shape of L(E) in SB2009 –Lower rep ( /2) rate below ~125GeV/beam –Collimation effects: increased beam degradation at lower E due to collimation wakes and due to limit (in X) on collimation depth Understanding the above limitations, one can suggest mitigation solutions: –1) Consider doubling the rep rate at lower energy –2) Consider Final Doublet optimized for 250GeV CM

A. Seryi, 19 Jan 2011, BAW Global Design Effort 13 One option would be to have a separate FD optimized for lower E, and then exchange it before going to nominal E Other option to be studied is to build a universal FD, that can be reconfigured for lower E configuration (may require splitting QD0 coil and placing sextupoles in the middle) FD optimized for lower energy will allow increasing the collimation depth by ~10% in Y and by ~30% in X (Very tentative!) FD for low E Nominal FD & SR trajectories FD for 1/2E & SR trajectories

A. Seryi, 19 Jan 2011, BAW Global Design Effort 14 Beam Parameters & mitigation Tentative! At 250 GeV CM the mitigations may give –* 2 L due to double rep rate –* about 1.4 L due to FD optimized for low E

A. Seryi, 19 Jan 2011, BAW Global Design Effort 15 SB2009 Lumi Linac rate 10Hz (IP rate 5Hz) and special FD Linac & IP rates are 8Hz

New parameters based on the following assumptions Starting point: parameters developed by the Physics Questions Committee (B. Foster, A. Seryi, J. Clarke, M. Harrison, D. Schulte, T. Tauchi) in December Take into account progress on 10Hz rep rate for low E achieved after LCWS10 There are issues with DR duty cycle that are being studied, however assume that they will be solved Assume that we will develop and use new universal FD that gives additional luminosity improvement (only) for 200 and 250 GeV energies Consider the following energies: 200, 250, 350, 500 GeV CM Assume single stage bunch compressor (min sigma_z=230um – will use 300um and consider 230 as an overhead or safety margin) Assume 10Hz and 1300 bunches Consider separately the cases with and without Travelling Focus Energy and rep rate: E= GeV CM IP rep rate5555Hz Linac rate101055Hz ( double pulsing ) A. Seryi, 19 Jan 2011, BAW Global Design Effort 16

A. Seryi, 19 Jan 2011, BAW Global Design Effort 17 BAW-2 Themes Formally agreed parameter sets across energy range ILC-EDMS document ID

A. Seryi, 19 Jan 2011, BAW Global Design Effort 18

Arrows show location of focal point for each bunch at a particular moment A. Seryi, 19 Jan 2011, BAW

Global Design Effort 21 SB2009 beam offset sensitivity Higher Disruption –Higher sensitivity to  y –Intratrain Feedback more challenging –Vertical bunch-bunch jitter to be <200pm for <5% lumi loss –However, twice longer bunch separation will help to improve bunch- bunch uniformity & jitter

A. Seryi, 19 Jan 2011, BAW Global Design Effort 22

The travelling focus can be created in two ways. The first way is to have small uncompensated chromaticity and coherent E-z energy shift  E/  z along the bunch. One has to satisfy  E k L * eff =  z where k is the relative uncompensated chromaticity. The  E needs to be 2-3 times the incoherent spread in the bunch. Thus, the following set may be used:  E=0.3%, k=1.5%, L * eff =6m. It is clear that additional energy spread affect the physics. Therefore, second method is considered: A. Seryi, 19 Jan 2011, BAW

The second way to create a travelling focus is to use a transverse deflecting cavity giving a z-x correlation in one of the FF sextupoles and thus a z-correlated focusing The cavity would be located about 100m upstream of the final doublet, at the  /2 betatron phase from the FD The needed strength of the travelling focus cavity can be compared to the strength of the normal crab cavity (which is located just upstream of the FD): –U trav.cav. /U crab.cav. =  FD R 12 cc / (L * eff  c R 12 trav ). –Here  FD is dispersion in the FD,  c full crossing angle, R 12 trav and R 12 cc are transfer matrix elements from travelling focus transverse cavity to FD, and from the crab cavity to IP correspondingly. For typical parameters  FD =0.15m,  c =14mrad. R 12 cc =10m, R 12 trav =100m, L * eff =6m one can conclude that the needed strength of the travelling focus transverse cavity is about 20% of the nominal crab cavity. A. Seryi, 19 Jan 2011, BAW

QD0 R&D Prototype Coil Winding Status A. Seryi, 19 Jan 2011, BAW “Report to ATF2 Technical Board,” Brett Parker, BNL-SMD 26 To control coil support tube position during winding, we split QD0 coil in order to have a fixed support. Coil winding of all the quadrupole layers is complete and the measured harmonic agree with expectations. Vertical cold test has been done; tested to 10% above operating current without quenching; forced quenches with spot heater, saw no degradation. Have started winding octupole coil correction windings; next we will start winding the main sextupole coil sets. QD0 coil production Octupole coil test winding

A. Seryi, 19 Jan 2011, BAW

Geophone Locations Inside QD0 Cold Mass A. Seryi, 19 Jan 2011, BAW “Report to ATF2 Technical Board,” Brett Parker, BNL-SMD 28 Building upon RHIC IR quad experience, we look to put geophones inside the QD0 R&D prototype cold mass. Two mounting points at the coil support attachment points are under consideration. Only make measurements with coils off! Work underway to determine if fringe fields from coils might still damage sensors. Sextupole Coil Dummy Extraction Coil

QD0 Field Stability Direct Measurement A. Seryi, 19 Jan 2011, BAW “Report to ATF2 Technical Board,” Brett Parker, BNL-SMD 29 Develop thin walled, warm finger design with test coil stabilized independent of QD0 structure. Multi-turn probe coil would be mounted in fixture that could be rotated 90º to measure changes in either the horizontal or vertical field. It is critical to carefully adjust coil centering so as to minimize sensitivity to power supply ripple. Do this adjustment via deliberate AC current excitation of the magnet coils. Need to determine if “I-Beams” on either side of coil holder have to be non-conducting (or SS). 20 mm

A. Seryi, 19 Jan 2011, BAW Global Design Effort 30 Nominal RDRSB2009 RDR Low chargeNew low charge E cm (GeV)500 Ne2× ×10 10 F rep (Hz)5555 NbNb P b (MW)  x (mm)  y (  m)  x (  m) 10  y (nm)  x (nm)  y (nm) z (m)z (m) BB nn Dy HDHD ?  (rad) N had Trav. focusNoYesNoYes L 0 (cm -2 s -1 )2.0× × ×10 34 Beam parameters Dou Wang (IHEP), Jie Gao (IHEP), K. Kubo (KEK) New low charge (GP): L=1.75E34 w/o TF, L=2.0E34 with TF

Wang-Gao-Kubo parameters The luminosity gets to 2E34 with travelling focus Some of the nasty beam-beam effects and sensitivities are eased The additional issues with this set is stronger focusing and tighter collimation depth and large wakes effect of the beam The need of 2 stage bunch compressor Cannot comment on cost saving Worth to have a look at this alternative set A. Seryi, 19 Jan 2011, BAW Global Design Effort 31

Conclusion The RDR (2007) focused on nominal energy Parameter set that maintains the physics reach and optimizes the cost/performance has been developed – SB2009 Future studies –Detailed design of the universal final doublet –Optimization of collimation depth –Study of FF tuning with needed beta* –Detailed beam-beam studies –Damping ring design –… A. Seryi, 19 Jan 2011, BAW Global Design Effort 32