Division of Water Rights WaterRights.utah.gov. Proof of Beneficial Use of Water (proof) Frank Quintana, P.E. Thursday, April 25 th, 2013.

Slides:



Advertisements
Similar presentations
The Surveyors Role in Utah Water Rights Utah Council of Land Surveyors February 19-21, 2014.
Advertisements

If my body were a car, this is the time I would be thinking about trading it in for a newer model. I've got bumps and dents and scratches in my finish.
Water Rights Training for Proof Professionals July 16, 2008 Salt Lake City.
WATER RIGHTS 101: OVERVIEW OF UTAH WATER LAW Legislative Water Task Force June 15, 2004.
Filing Proofs or Affidavits 2010 Utah Water Users Workshop March 16, 2010 Jared Manning Division of Water Rights.
Curlew Valley Water Issues Public Meeting April 28, 2009.
Hot Topics in Water Rights August 31, 2011 Kent L. Jones, P.E. State Engineer.
Guidelines for accepting Report of Water Right Conveyance Forms (100%) 1.Terminology 2.Questions to ask yourself when reviewing a report of water right.
Salt Lake Valley Groundwater Management Plan State of Utah Department of Natural Resources Division of Water Rights.
 Tamara Prue.  Go over the most common types of applications (15 min)  Discuss water right policy by area (5 min)  Introduce the Public Land Survey.
Kansas Transition from Ground Water Development to Enhanced Ground Water Management Define the Resource Beneficial Use Protect and Control Thomas L. Huntzinger,
Water Rights Update Rural Water Association of Utah: Legislative Water Rally January 19,2012 Kent L. Jones, P.E. State Engineer.
Cedar Valley, Utah County, Utah Cedar Valley Water Rights Management Plan Status and Review March 7, 2013 Teresa Wilhelmsen, P.E. UL/JR Regional Engineer.
December 2, 2014 Goshen Valley Appropriation Policy and Current Conditions Goshen Valley, Utah County.
RWAU Training – April 27 & 28, 2015 Water Rights Teresa Wilhelmsen, P.E. Utah Lake / Jordan River Regional Engineer.
Water Rights 101 Jon Culp Washington State Conservation Commission.
If my body were a car, this is the time I would be thinking about trading it in for a newer model. I've got bumps and dents and scratches in my finish.
Do I need a water right? Do I have a water right? Is it valid? King County Agricultural Water Rights Workshop November 2, 2010.
ARIZONA DEPARTMENT OF WATER RESOURCES SURFACE WATER RIGHTS UNIT.
Upper Colorado River Basin Current Water Rights Issues Division of Water Rights April 2005.
Proof Professionals Training July 15, 2010 Salt Lake City, Utah.
The Application of a Real-Time Operational Water Resources Decision Support System (DSS) for the Orange-Fish-Sundays Water Transfer Scheme 18 th October.
Taking Care of Your Water Rights: Permits, Extensions & Certificates Oregon Association of Water Utilities August 2013 Lisa Jaramillo Water Right Services.
Utah State Engineer Where Do We Go From Here? (and how are we going to get there?) Kent L. Jones, P.E.
Bureau of Land Management John Mann, P. E. Assistant State Engineer November 16-17, 2010 Bureau of Land Management John Mann, P. E. Assistant State Engineer.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Utah Water Users Workshop March 6, 2007 Current Water Rights Issues Jerry Olds State Engineer / Director DWRi.
Appropriation Policy Escalante River Drainage Kurt Vest Regional Engineer Division of Water Rights.
Pine / Wah Wah Valley Water Right Area 14 & 69 Public Meeting - February 4 th 2014.
Water: 101 Adjudication. Permit vs. Adjudication Permit Issued Authorizes Holder to Make Use of the Water as Limited by the Permit Beneficial Use Adjudication.
Utah Water User’s Workshop Efficiency & Water Rights Enforcement Jerry Olds State Engineer March 2005.
Public Water Supplier Considerations Rural Water Association of Utah April 25, 2013 April 25, 2013 Utah Division of Water Rights Kirk Forbush, P.E. Regional.
Surveying principles 1 Public Water Suppliers S. Ross Hansen P.E., L.S. Region Engineer 4/10/2014 Rural Water Certification Class.
1 Water Right Conveyances Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March.
2006 Utah Water User’s Workshop Water Rights Issues Jerry Olds State Engineer.
Northern Utah County Groundwater Northern Utah County Groundwater Management Plan Status and Review November 3, 2010 Teresa Wilhelmsen, P.E. UL/JR Regional.
Presented by: Judy Ausick April 24, 2012 Rural Water Users’ Training
Rural Water Association of Utah Water Rights Certification Gary Brimley April 10, 2014.
Overview Utah Water Law Application Process Kirk Forbush PE Regional Engineer April 25, 2013.
Distribution of Water Rights Jared Manning, P.E. Utah Division of Water Rights March 17, 2014.
Filing Proof of Water Development Challenges and opportunities in defining and quantifying water rights via the proof and certification process Jared Manning.
WATER RIGHT CURRENTS Utah Division of Water Rights September 2009.
Policy for Maintaining Instream Flows in Northern California Coastal Streams Monitoring and Reporting Provisions for Water Rights Victoria Whitney Deputy.
Water Rights Training for Proof Professionals June 1, 2009 Salt Lake City.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) April 2013.
State Water Issues – State Engineer Utah Water Users Workshop March 13, 2012 Kent L. Jones, P.E. State Engineer.
Water Right Issues of the State Engineer Utah Water Users Workshop March 17, 2015 Kent L. Jones, P.E. State Engineer.
Surveying principles 1 Tooele Valley Groundwater Change Application Guidelines S. Ross Hansen P.E., L.S. Region Engineer 9/7/2011 Tooele Water Users Workshop.
Utah Division of Water Rights June 21, Boyd Clayton April 11, 2014 RWAU Water Right Certification Training Review.
Water Use Groups Rural Water Association of Utah Water Rights Certification Training April 10 – 11, 2014.
UTAH WATER USERS WORKSHOP March 15, 2011 HOW FAR CAN I STRETCH MY CFS? Kent L. Jones P.E. Utah State Engineer Utah Division of Water Rights.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) March 2012.
Water Right Transfers OAR Chapter 690 Divisions 380, 382, 385, 77 CWRE Workshops – October, 2012 Susan Douthit District Analyst.
Municipal Water Rights…… Water Law & Policy Seminars March 12, 2012 Kent L. Jones, P.E. State Engineer.
Ground-Water Management Plan Beryl Enterprise Area August 6, 2007 Sign up sheet.
Utah Division of Water Rights June 21, Boyd Clayton April 25, 2015 Public Water Suppliers.
Weber / Western Region Update for Title Professionals Vance Twitchell Assistant Regional Engineer April 20, 2011.
Council of Economic Advisors Water Rights Overview Utah Division of Water Rights Jerry Olds.
Upper Colorado River Basin Current Policy and Issues Utah Division of Water Rights September 2009.
Utah Division of Water Rights June 21, 2004 RWAU Training – April 2016 Marc K. Stilson, P.E., CPM, M.ASCE Regional Engineer, Southeastern UT Applications:
Utah Division of Water Rights June 21, 2004 From Application to Certification Clark Adams--April 2016 The Application Process.
2016 Water Legislation Northern Utah Water Conference Boyd Clayton, PE. March 29, 2016 Deputy State Engineer.
WATER USE PROGRAM HOW IT HAS CHANGED WHY IT IS IMPORTANT! Eric K. Klotz, P.E. Utah Water Resources Frank Quintana, P.E. Utah Water Rights Tammy North,
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
“Whiskey is for drinking, water is for fighting over.”
Richard J. Wenstrom, P.E. Edwards County Director Water PACK
End User Process Help - (UK)
Interpreting Water Rights
Lisa Jaramillo Transfer and Conservation Section Manager Kelly Starnes
WRIA 49 Planning Unit Buildout Analysis
Presentation transcript:

Division of Water Rights WaterRights.utah.gov

Proof of Beneficial Use of Water (proof) Frank Quintana, P.E. Thursday, April 25 th, 2013

1.What is proof? 2.What options does the applicant have when proof is due? 3.What to review before preparing a proof for a municipality Topics to cover

What is proof of beneficial use of water?

Example Water Right Number Application = Proposal Quantity of Water Point of Diversion – Water source (well, spring, river, etc) – Location – Diverting works – Flow Nature of Use – Irrigation 5.0 acres – Domestic 1 family – Stock watering 20 ELU Place of Use – NE¼SE¼ of Section 10, T 10N, R 10W, SLB&M ELU = Equivalent Livestock Units

1. Application to Appropriate Water 2. Change Application Based on existing water right(s) Based on shares of stock 3. Exchange Application Based on a valid contract 3 Applications Require Proof

When the State Engineer approves an application, he stipulates a proof-due date

There are two forms to submit proof

Form No. 1 Proof of Beneficial Use of Water A professional engineer or surveyor must prepare it Applicable to ALL applications

Form No. 2 Affidavit of Beneficial Use of Water Applicant prepare it Applicable ONLY to “Small Amount of Water” applications

Small Amount of Water Application Irrigation of ¼ acre Domestic of 1 family Stock watering of 10 Equivalent livestock units

Proof of beneficial use means ACTUAL use; use as it exists when a proof is prepared It doesn’t mean future use

Example Water Right Number Application = Proposal Quantity of Water Point of Diversion – Water source (well, spring, river, etc) – Location – Diverting works – Flow Nature of Use – Irrigation 5.0 acres – Domestic 1 family – Stock watering 20 ELU Place of Use – NE¼SE¼ of Section 10, T 10N, R 10W, SLB&M ELU = Equivalent Livestock Units

What options does the applicant have when proof is due?

Example Water Right Number Application = Proposal Quantity of Water Point of Diversion – Water source (well, spring, river, etc) – Location – Diverting works – Flow Nature of Use – Irrigation 5.0 acres – Domestic 1 family – Stock watering 20 ELU Place of Use – NE¼SE¼ of Section 10, T 10N, R 10W, SLB&M ELU = Equivalent Livestock Units

Example Water Right Number Application Quantity of Water Point of Diversion – Well Nature of Use – Irrigation 5.0 acres – Domestic 1 family – Stock watering 20 ELU Place of Use – NE¼SE¼ of Section 10, T 10N, R 10W, SLB&M Actual Use Quantity of Water Point of Diversion – Well Nature of Use – Irrigation 3.0 acres – Domestic 1 family – Stock watering 10 ELU Place of Use – NE¼SE¼ of Section 10, T 10N, R 10W, SLB&M ELU = Equivalent Livestock Units

1.Submit proof 2.File an extension request 3.Segregate the undeveloped portion File proof on developed portion File an extension on segregation Possible Options Available

What to review before preparing a proof for a municipality

Step No. 1 Review Water Use Data YearAmount Reported (acre-feet) Highest amount reported: acre-feet

Step No. 2 (Scenario One) Review perfected and unperfected water rights PerfectedUnperfected Water Right Number Quantity of WaterWater Right Number Quantity of Water Total30 000Total45 000

Step No. 2 (Scenario Two) Review perfected and unperfected water rights PerfectedUnperfected Water Right Number Quantity of WaterWater Right Number Quantity of Water Total25 000Total45 000

If the amount of water reported to the Water Use Program exceeds the amount certificated under the perfected rights, a proof can be submitted for up to the difference between the two amounts

Summary 1.Proofs and affidavits are evidence of ACTUAL uses 2.Options available when proof is due: a)Submit proof b)Request an extension of time c)File a segregation request to separate any future development, then: a)File proof on developed portion b)File extension request on undeveloped portion 3.Municipal Proof review: a)Review the “Water User Data” submitted to “Water Use Program” of the Division of Water Rights b)Review and do an accounting of the perfected and unperfected water rights of the applicant c)If the amount of water reported to the Water Use Program exceeds the amount certificated under the perfected rights, a proof can be submitted for up to the difference between the two amounts