Doc.: IEEE 802.11-05/0803r1 Submission July 2005 TK Tan, Philips Slide 1 WNG SC Closing Report Notice: This document has been prepared to assist IEEE 802.11.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Advertisements

Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /0094r0 Submission November 2009 Steve Shellhammer, QualcommSlide 1 Comments on PAR Notice: This document has been prepared.
Doc.: IEEE /1451r1 Submission September 2006 T. K. Tan, Philips Slide 1 WNG SC Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
Doc.: IEEE /2237r0 Submission July 2007 Emily Qi, Intel CorporationSlide 1 TGv Redline D1.0 Insert and Deletion Notice: This document has been.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
IEEE White Space Radio Contribution Title
WNG SC Agenda Date: Authors: Name Company Address Phone
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
SG CUB Tentative Timeline
WNG SC Agenda Date: Authors: Name Company Address Phone
WNG SC Agenda Date: Authors: Name Company Address Phone
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
3GPP liaison report July 2006
TGu Closing Report Date: Authors: May 2006 May 2006
WNG SC Agenda Date: Authors: Name Company Address Phone
TGp Motions Date: Authors: November 2005 Month Year
TGu-changes-from-d0-02-to-d0-03
WNG SC Agenda Date: Authors: Name Company Address Phone
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
Experimental DTV Sensor
TGu Closing Report Date: Authors: September 2005
Siemens, Roke Manor (Recording Secretary )
Opening Report – November 2005
IEEE WG Opening Report – July 2008
TGu Closing Report Date: Authors: July 2005 July 2005
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
Liaison Report From wng
TGu Motions Date: Authors: July 2006 July 2006
TGy draft 2.0 with changebars from draft 1.0
WNG Closing Report, May Authors: May 2008 Date: May 2007
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
November Opening Report
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
TGu Motions Date: Authors: May 2006 May 2006
Liaison Report From Date: Authors: Month Year
[ Policies and Procedure Summary]
Questions to the Contention-based Protocol (CBP) Study Group
Siemens, Roke Manor (Recording Secretary )
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
WNG SC Closing Report Date: Authors: Name Company Address
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
WNG SC Closing Report Date: Authors: November 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Timeline Date: Authors: July 2005 July 2005
WNG SC Closing Report Date: Authors: July 2006 July 2006
Presentation transcript:

doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 1 WNG SC Closing Report Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Name Company Address Phone TK Tan Philips 1151 McKay Drive M/S SJ48A San Jose CA USA Authors:

doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 2 WNG SC Committee Report IEEE , San Francisco, California, July , 2005

doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 3 Summary IEEE 802.1AM PAR issues Update on TGu and impact on other task groups AP – AP Communications Prepare for September Interim meeting

doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 4 Relevant docs wng-wng-sc-report.ppt wng-response-in-support-802-1am.ppt wng-wireless-wg-response-to-proposed am-par-and-5-criteria.ppt wng-tgu-overview.ppt wng high-data-rate-multimedia- transmission.ppt wng scope.ppt wng-minutes-july-2005.doc

doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 5 IEEE 802.1AM PAR Straw Poll 1 Recommendation from IEEE WNG SC to IEEE WG that the IEEE 802.1AM PAR approval is postponed. It would like to see a study group created within IEEE 802.1, with the intention of revising this PAR to address the RF management issue, ensuring that stakeholders within the wireless groups are invited. Such meetings should be collocated with the IEEE 802 wireless interims. IEEE should therefore invite IEEE to participate in their interims. Straw poll result : 23, 4, 2

doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 6 Straw Poll 2 Recommendation from IEEE WNG SC to IEEE WG that it would like to see a study group created within IEEE 802.1, with the intention of revising the approved IEEE 802.1AM PAR to address the RF management issue, ensuring that stakeholders within the wireless groups are invited. Such meetings should be collocated with the IEEE 802 wireless interims. IEEE should therefore invite IEEE to participate in their interims. Straw poll result: 7, 13, 7

doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 7 AP to AP communication : Motion Resolved: WNG SC believes that standardization of AP to AP protocols over the DS should be included in the scope of Result : 27, 0, 12

doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 8 Objectives for Sep 2005, Garden Grove, California, USA Updates Technical Submissions – Future Directions CFP – Cognitive Radio Prepare for November Plenary meeting