Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.

Slides:



Advertisements
Similar presentations
- GDP 2011 versus 2010 – increase by 5.5%
Advertisements

The role of competition authorities in utilities regulation. Co-operation with sector regulators. The role of Competition Council of Latvia Valdis Latkovskis.
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
APPLICATION OF THE ERES SUPPORT MECHANISM IN ROMANIA Primary and Secondary Legislation 1.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Number of players The number of players at wholesale level is very limited (more then 97% of sources /production + import/ in one /incumbent/ hand) New.
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
Overview of the latest developments of the Hungarian energy market Mr. György Hatvani Deputy State Secretary of energy and industry Ministry of Economy.
Märt Ots Estonian Competition Authority Baltic Electricity Market Forum Kuressaare Latest developments in Estonia.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
Märt Ots Estonian Competition Authority Baltic Electricity Market Fora Vilnius Latest developments in Estonia.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Latvian electricity market Latest developments
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE Challenges in transitioning to a liberalised, competitive market – Romanian experience.
1 Märt Ots Energy Market Inspectorate Vilnius Energy regulation in Estonia.
Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
1 The Regulatory Authority for electricity and gas: an overview of the legislation The Regulatory Authority for electricity and gas: an overview of the.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
BEMIP implementation WG meeting summary 9 th Baltic Electricity Market Mini-Forum September 16, 2009, Vilnius.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Update on electricity market Baltic Mini Forum 1 October, 2010.
Is there a need for a change?
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
Märt Ots Estonian Competition Authority Baltic Electricity Market Forum Riga Latest developments in Estonia.
Market liberalization in Moldova -main challenges- Chisinau, May 16, 2013 Veronica Muruziuc Seventh Partnership Activity.
Baltic Electricity Market Mini-Forum June 3, 2006 Riga, Latvia Electricity Licensing Rules in Lithuania Kestutis Zilenas Head of Licensing department National.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
BALTIC ELECTRICITY MARKET MINIFORA Riga 3 July 2006 Transmission and connection to the grids Dace Bite Public Utilities Commission.
1 ELECTRICITY REGIONAL INITIATIVE BALTIC REGIONAL ELECTRICITY MARKET Dace Bite Public Utilities Commission Latvia Creating a Single European Energy Market.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
Understanding the Dynamics of Electricity Trade in the Philippines with the Entry of Retail Competition and Open Access.
Romanian Natural Gas Regulatory Authority (ANRGN) Dan Pantilie President ANRGN Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Energy Market Regulatory Authority of TURKEY (EMRA) Yusuf GÜNAY President, Energy Market Regulatory Authority Budapest, Hungary May 19, th Annual.
ERRA 4th Annual Conference May 19, Budapest, Hungary. Latvia Country Update UPDATE ON REGULATION Ainars Čunčulis Head of Energy Department Public.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
STATE ENERGY REGULATORY COMMISSION (SERC) Prof. Konstantin Shushulov Chairman Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
Electricity licensing and trading rules in Latvia Mini-Forum, July 3, 2006 Sandija Audzere, Head of Energy Unit, Legal Department Public Utilities Commission.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Ainārs Meņģelsons Public Utilities Commission Latvia 9th Baltic ERI September 16, 2009 Vilnius, Lithuania LATEST UPDATE IN LATVIA.
ELECTRICITY REGIONAL INITIATIVE
ELECTRICITY MARKET IN BULGARIA an attempt for realistic point of view Lubos Pavlas Regional manager of CEZ for Bulgaria Sofia,
Renewable energy support schemes in the Republic of Moldova
Latest developments in Estonia
Latest developments in Estonia
BEMIP implementation WG meeting summary
LATEST UPDATE IN LATVIA
STATE ENERGY AND WATER REGULATORY COMMISSION
- GDP 2011 versus 2010 – increase by 5.5%
Long-term Capacity Market
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE UPDATE ON LATVIA

2 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia KEY DATA GDP 2009 versus 2008 – decrease by 18% GDP 1st quarter of 2010 versus 1st quarter of decrease by 6,1 % GDP 2nd quarter of 2010 versus 2nd quarter of decrease by 2,1% Electricity consumption:  2009 versus 2008 – decrease by 7,9%  1st half of 2010 versus 1st half of increase by ~2%

3 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Electricity Market Opening All households and non household consumers with less than 50 employees and yearly turnover less than LVL 7 million have the rights to the universal service in electricity sector Universal service – the right to be supplied at the regulated price Consumers who do not qualify for universal service are obliged to buy electricity at the market price

4 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Electricity Market Opening Regulator has granted rights to JSC Latvenergo from January 1, 2009 to set the tariffs for captive customers by the company itself:  Regulator assesses tariffs in conformity with the calculation methodology and justification within 21 days  if the Regulator does not reject tariff proposal, it enters into force on the date indicated by the company  if the Regulator rejects tariff proposal for a justified reason, tariffs do not enter into force

5 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Electricity Market Opening 35,6% of total electricity volume is traded for contract price (non-regulated) In 2009, 90 customers switched to another supplier, 4 of them switched back on 1st January 2010 On 1 January % of free market customers purchased electricity from independent traders

6 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia TSO unbundling TSO – AS “Augstsprieguma tīkls” legally unbundled from June 1, 2007 First version of concept on TSO unbundling in line with the 3rd package presented to the Cabinet of Ministers in June 2010 Initial option - Independent system operator The lead institution in adoption of the 3rd package - the Ministry of Economics, the first meeting of stakeholders took place in June 2010

7 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Tariffs set up Tariff calculation methodologies approved by Regulator are in force from 2002 and amended respectively. Regulator, after receiving a justified application from the system operator (SO), approves tariffs or rejects them. The procedure is described in the Law and can take max 4 months. Regulator has the rights to ask the SO to submit new tariff proposal, if the case is present. No subsidies are included in the SO’s tariffs.

8 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Access to the system Regulator in 2008 and 2009 adopted regulations on connection of producers and users to the system Technical and operational requirements to the market participants are described in the Grid Code. TSO – AS “Augstsprieguma tīkls”, has made available model contracts to access the Transmission System on its Internet web page. Slight adjustment could be required in the Grid Code after adoption of the 3rd package.

9 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Retail market - electricity Already settled: universal service last resort supplier Adjustments required: provisions related to vulnerable customers current switching time is 2 months – the new directive envisages only 3 weeks on requirements related to providing information to the customers

10 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Investments in generation Authorization procedure – in line with the 3rd package Conducted in accordance with objective, transparent and non discriminatory criteria Reason for refusal shall be objective, non-discriminatory, well founded and duly substantiated From November 1, 2010 no more electricity feed in tariff for new CHPs using natural gas Tendering procedure - in line with the 3rd package The procedure can be launched only when the authorization procedure and energy efficiency/demand side measures are insufficient to ensure security of supply Details of tendering procedure should be published in Official Journal of EU 6 months prior to the closure of tender

11 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Legal amendments - power To fulfill the Regulation on conditions for access to the network for cross-border exchanges in electricity, in January 2010 the Grid Code has been amended : The general scheme for the calculation of the total transfer capacity and the transmission reliability margins Harmonized calculation and publication of hourly balance energy prices, the prices of previous months to be published till the date of 15 th of current month The electricity importer/exporter from the non-EU (perimeter) countries should pay perimeter fee – 0,3 Euro/Mwh For consumers with the load less than 100kW the standard load curve could be applied

12 11thBaltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia Legal amendments - heat Starting from November 1, 2009 the Regulator took over the regulation of district heating from municipal regulators. In April 2010 new tariff calculation methodology of heat tariffs' was approved. During 2010 PUC carried out activities related to collection of information about companies to be regulated and consequently issued or altered respective licenses. The present threshold for regulation of heat companies: Production - installed capacity above 1 MW Trade volume Mwh/per annum