Frequency Response Standard. ERCOT Governor Droop.

Slides:



Advertisements
Similar presentations
Bill Blevins Management of the West-North Stability Limit Under the Nodal Market.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
Bob Green Garland Power and Light
FREQUENCY CONTROL DURING BLACK START OPERATIONS
CMWG Update June WMS Meeting CMWG Update 1. CMWG (Vote) Confirmation of new Vice Chair: Greg Thurnher (Representing Luminant/TXU Energy) 2.
Governor Response Sequence Bob Green Garland Power and Light ERCOT Future AS Workshop January 20, 2014.
Frequency Control Turbine Governor Droop NERC Requirement
ERCOT 2013 Winter Storm Drill (WSD) Summary Brian Barcalow Training Specialist, Sr.
1 Nodal Stabilization Market Call December 28, 2010.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Comparison of Governor Deadband & Droop Settings of a Single 600 MW Unit A Hz Deadband with a Straight Line Proportional 5% Droop Curve Compared.
FREQUENCY CONTROL AND AUTOMATIC GENERATION CONTROL
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
ERCOT 2014 Hurricane Drill (HD) Summary Brian Barcalow Training Specialist, Sr.
Wind Generator Inertia and Governor Response Report PDCWG Assignment in response to EECP Step #2 on February 26, ROS Action Plan Item 1e.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
Frequency Control Task Force Report to WMS March 22, 2006.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Graph Trend Definitions Telemetered SCE: Sum of all QSE’s Telemetered SCE (uses “Left” scale). Regulation Deployed: Sum of all Regulation Ancillary Service.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
PDCWG Report to ROS January 14, 2010 Sydney Niemeyer.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
14 Minute Ramp Period Testing Workshop June 30, 2009.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
Responsive Reserve Service Deliverability Review September 15,
QMWG February 7, 2011 January 2011 GREDP Performance Summary.
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
PRR 525 Update Prepared by ERCOT Compliance December 2005.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Preliminary Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 12th, 2013.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG April 26, 2013.
Voltage Control Brad Calhoun Consultant, Sr. Trainer Spring 2016.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
TAC Report to the ERCOT Board
Current FRRS Language & Explanation of Posted Data
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Compliance Report to ERCOT TAC February 2007
Presentation transcript:

Frequency Response Standard

ERCOT Governor Droop

QSE 1 Performance

QSE 2 Performance

QSE 3 Performance

QSE 4 Performance

QSE 5 Performance

QSE 6 Performance

QSE 7 Performance

QSE 8 Performance

QSE 9 Performance

QSE 10 Performance

QSE 11 Performance

QSE 12 Performance

QSE 13 Performance

QSE 14 Performance

QSE 15 Performance

QSE 16 Performance

QSE 17 Performance

QSE 18 Performance

May 15, 2003 Event

Hz Total Generation less CPK Total Generation QSE telemetered Total Generation

Event Summary

Notes Four QSE’s had data/telemetry problems before/during event –Data Quality flags did not work on one QSE’s data ERCOT Regulation deployment was minimal due to large QSE SCE feedback and large Responsive Reserve deployment. TXU placed on Constant Frequency control. Some turbines had more governor response for the second event.

AVR Performance Measure PDCWG members had concerns about data update times adequate to do an analysis –Faults last only cycles and data from QSEs is either 2 second or 10 second. –Voltage Regulator response will be limited to physical location/bus voltage connection and proximity to fault. Difficult to determine who/which generators should have responded. AVR mode of operation may be determined by trending MVAR output of generators and observing changes in output (MVAR) as voltage is adjusted on neighboring generators.

Operations Report Changes PDCWG recommended changes to ERCOT Operations report as requested. –The time frequency was at Hz prior to the excursion was added, along with Load and Total Regulation deployed. How long it took to reach the max/min frequency can be determined as well as how much load change occurred and Regulation Services were deployed as frequency deviated from schedule. –The Event “Cause” includes total Schedule change as well as the largest single QSE schedule change where appropriate. A Picture speaks a 1000 words, one member suggested a graph of each event.

PDCWG Meeting June 25, 2003 QSE Performance measure, SCPS1 and SCPS2 was reviewed. –ERCOT epsilon 10 was updated to correlate to the epsilon 1 change. The value changed from Hz to Hz effective July 1, This change will increase the L10 value for the QSE SCPS2 measure and should make the standard more equivalent to the multiple control area CPS2 measure prior to single control area operation. –The SCPS2 measurement was thought to be important for QSE ramping performance.

Meeting continued QSE Ramp Rates are being exceeded when deployments are for correcting congestion. A request was made of ERCOT to recalculate May’s CPS1 score, but eliminate the periods when VDI’s were issued. This may correlate the low CPS1 score to the frequent Dispatch Instructions.