MTAC Workgroup 145 Promote Significant Usage of 24- Digit Tray Labels November 2011.

Slides:



Advertisements
Similar presentations
1 It’s Time for Intelligent Mail ® All About the Barcodes Wednesday, Sept. 17, 2008.
Advertisements

MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
1 Wednesday, Sept. 17, 2008 It’s Time for Intelligent Mail ® : Overview and Value of Intelligent Mail ®
IMb™ Services Initial Steps for Mailers. Agenda Vision Direction Make It Happen Resources Questions 2.
MTAC Workgroup 119 FSS Implementation Communication Peter Moore John Nagla November 20, 2008.
Seamless Acceptance Pritha Mehra, USPS Manager, Marketing Technology & Channel Management.
INTELLIGENT MAIL® University 1 Intelligent Mail® Barcodes Period 2 Version 1.0.
1 It’s Time for Intelligent Mail ® : Bringing It All Together Wednesday, Sept. 17, 2008.
Mailer’s Technical Advisory Committee (MTAC) Task Team 2 General Session Presentation November 16, 2010.
Business Mail Acceptance Update Mailer’s Technical Advisory Committee (MTAC) November 19, 2009 Pritha Mehra Frank Neri Bob Galaher.
Full Service and The Future of Mail Acceptance Anthony Loera Supervisor, Business Mail Entry 1.
Visibility Strategy September, Visibility Today CONFIRM provides piece level mail processing data that can be used for tracking for letters and.
Mailer Barcode Quality Industry Best Practices MTAC November 6, 2002.
MTAC General Session Meeting Electronic Verification System (eVS®)/ Product Tracking System (PTS) User Group #2 Industry co-chair – John Medeiros Postal.
1 MTAC Workgroup 117 October 22, 2007 Washington DC.
1 MTAC WORKGROUP 111 Status Update Nov 1, Work Group 111 Charter Issue Statement: Identify gaps, define solutions, highlight benefits, and improve.
MTAC WG 114 MTAC Workgroup 114 Service Standards and Measurements for Market-Dominant Products April 12, 2007.
February, 2008 Intelligent Mail® Readiness. 2 Agenda Intelligent Mail® Readiness  Full Service Project Schedule  Intelligent Mail® Releases  Mailer.
® MTAC WORKGROUP 113 ADDRESS / BARCODE REQUIREMENTS FOR FSS Update August 1, 2007.
® Agenda Full-Service Mail Quality Reports Accessing the Mailer Scorecard Electronic Verifications Tab Full-Service Assessable Metrics.
FLAT MAIL PREPARATION OPTIMIZATION November 5, FLAT MAIL PREPARATION OPTIMIZATION Issue #81 MTAC November 5, 2003.
MTAC WORKGROUP #111 MTAC GENERAL SESSION PRSENTATION FEBRUARY 21, 2007 PRESENTED BY Cher Rupp-Ruggeri Steve Colella.
® MTAC Workgroup 114 Establish Service Standards and Measurement USPS Service Measurement Capability July 31, 2007.
® MTAC WG #135 Transportation Management Systems (TMS) Combined Data Limitations August 2010.
Mailer’s Technical Advisory Committee (MTAC) Task Team 2 General Session Presentation November 16, 2010.
1 MTAC 117 Intelligent Mail Barcodes and Electronic Documentation Workgroup Update.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
® Intelligent Mail NPPC May 13, Intelligent Mail Vision Provide end-to-end visibility, throughout the entire supply chain, using:  Standardized.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
® MTAC WG #135 Transportation Management Systems (TMS) Combined Data Limitations November 18, 2010.
® Intelligent Mail ® Barcodes for Reply Mail (Business & Courtesy) MTAC Workgroup 128 Jody Berenblatt, Industry Co-chair Linda Stewart, Postal Co-chair.
Mailing 101 EVOLVE 2015 Intelligent Mail Small Business Tool By Carol Rosengren.
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
® Customer Supplier Agreements Presented by Pritha Mehra Vice President, Business Mail Entry Friday, October 17, 2008.
USPS Mailer Technology Study MTAC February 5, 2004 Jeffrey Freeman Manager, Mail Technology Strategy Intelligent Mail and Address Quality.
Workgroup 127 Move Update PS 6014 Form Redesign. Issue Statement  PS 6014 form originated from MTAC WG #75 and was designed to clearly assign liability.
1 Wed Aug. 6, 2008 Intelligent Mail®. 2  Implementation  Investing in Intelligent Mail  Full Service Review » Intelligent Mail® Barcodes and Labels.
® Intelligent Mail® and Start-the-Clock (101) Presented by Pritha Mehra, Vice President, Business Mail Entry Friday, October 10, 2008.
MTAC Workgroup 102 Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail May 16, 2007.
® Mail Technical Advisory Committee Workgroup 142 Industry Sponsor - Wendy Smith Industry Co-chair – Tom Underkoffler USPS Co-chair – Robert Raines.
MTAC Workgroup 93 Streamlining Verification Debbie Cooper Bob Galaher Feb 22, 2006 Washington DC.
® MTAC Satisfaction Survey May ® Respondents * 89 Respondents * Primarily MTAC representatives (64%) * Association Executives (24%)
MTAC MAIL IRREGULARITY FEEDBACK WORKGROUP MTAC Presentation February 6, 2003.
1 Intelligent Mail Direction  Today  POSTNET  Intelligent Mail Barcodes (optional)  May 2009  Intelligent Mail Barcodes: “Basic”, “Full Service” 
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
Advance Notification Streamlined Acceptance and Visibility for First-Class Mail MTAC Workgroup 102.
1 November, 2008 Intelligent Mail® Readiness. 2 Agenda Intelligent Mail® Readiness  Full Service Project Schedule/Infrastructure  Recap Full Service.
1 Service Performance Measurement System & Intelligent Mail® Barcodes MTAC – January 31, 2008.
MTAC Workgroup 102 Update Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail January 2008.
® Mailer’s Technical Advisory Committee Meeting USPS Headquarters Washington, DC November 19 th, 2009.
1 Intelligent Mail ® Barcode Implementation Federal Register Notice ©USPS2007.
1 Seamless Acceptance, Performance- Based Verification Implementation, Benefits, Obstacles and Feedback Ty Taylor, JC Penney Pritha Mehra, USPS MTAC 117.
MTAC WG #124 Intelligent Mail ® Education April 28, 2009 Laine Ropson, Industry Richard Daigle, USPS ®
Enterprise Payments MTAC Work Group #140 September 27, 2010 Prepared by.
Streamlining Verification MTAC Workgroup Mission Statement: –Collectively determine how the USPS and the Industry can leverage existing, or guide.
MTAC Workgroup 141 Spoilage and Shortage Reporting and Postage Reconciliation February 2011.
1 Intelligent Mail Barcodes Mail Preparation MTAC November 8, 2007.
® MTAC WG #135 Transportation Management Systems (TMS) Combined Data Limitations May 20, 2010.
Mailing Industry Changes ® PCC Workshop-in-a-Box Module 4 PCC Workshop-in-a-Box Module 4.
MTAC Workgroup 100 Seamless Acceptance for MLOCR Environment Co-chairs Industry – Jay Gillotte USPS – Pritha Mehra.
Status for MTAC #123 Workgroup Service Information Needs, Reporting and Communication Channels.
PRESORT OPTIMIZATION WORK GROUP February 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
1 MTAC Work Group 138 eDropship November 18th, 2010.
1 Thursday Aug. 7, 2008 Intelligent Mail® Readiness.
1 MTAC WORKGROUP #111 MTAC GENERAL SESSION PRESENTATION August 2, 2007 Presented By Cher Rupp-Ruggeri Steve Colella.
Association Presentation Mailers Technical Advisory Committee November 7, 2007 John A. Sexton.
PRESORT OPTIMIZATION WORK GROUP November 6, PRESORT OPTIMIZATION Issue #11 WORK GROUP LEADERS Joe LubenowMarc McCrery Industry USPS.
MTAC – November 2006 Mailers’ Technical Advisory Committee Address Location for FSS Work Group #101 November 1 st, 2006.
1 MTAC WG #175 Update for Northeast Area Focus Group May 4 th,
Presentation transcript:

MTAC Workgroup 145 Promote Significant Usage of 24- Digit Tray Labels November 2011

Issue Statement The USPS would like to expand the use of IMTb on all commercial mail mailings - today; the only requirement is for Full Service. The extension of IMTb to all commercial mail mailings - all trays, flat tubs and sacks - will allow for increased visibility in the network. This will: a.Enable commercial mailers visibility into USPS network b.Ensure unique identification of all tray and sack mail c.Enhance commercial mail measurement d.Improve forecasting and processing efficiencies e.Reconcile mailings and ensure revenue protection

Initial Issues Defined Identification of six primary issues  Cost to implement  Handling of reprints  Available space on the labels  Serial number management  Mail Service Providers and owners who do not have “sophisticated” internal data or IT support staff  Adequate time for adoption Drove the agenda for the following meetings and defined the additional input the workgroup would need to formulate their recommendations.

Input Organizations USPS Container Tag Overview  USPS provided a container tag historical overview as a level setting exercise for the team. Industry Survey  WG determined broader input was needed  Survey created and circulated through the DMM Advisory, industry associations and MTAC  Consisted of 5 questions  Over 300 responses gathered

Workgroup Accomplishment IMTL Technical Fact Sheet  Determined industry often confuses the phrase “Intelligent Mail” with “Full Service Intelligent Mail”  Created an IMTL Technical Fact Sheet to reduce confusion Created 5 Recommendations  Build value – justify the cost to the industry  Create awareness for non-Full Service Mailers - use of 24 digit barcodes for non-Full Service mailings does not require electronic documentation matching the “nesting”  Reprints – allow for tolerances in mailings to accommodate reprints  Serial number management – provide examples of methodologies  Implementation Suggestions – phased approach

Workgroup Leaders Steve Dearing US Postal Service Himesh Patel US Postal Service Paula Stoskopf GrayHair Software