High Level Strategy Dependencies Milestones Roles and Responsibilities Iterative Approach Multiple Legacy / Targets Scope Several different migration methods.

Slides:



Advertisements
Similar presentations
High level QA strategy for SQL Server enforcer
Advertisements

Fast and Thorough: Quality Assurance for Agile Data Warehousing Projects.
End User Applications What to build. Metadata Management Project Management & Quality Assurance Source Systems Source Systems External Data Data Transformation.
1 Information Systems Development (ISD) Systems Development Life Cycle Overview of Analysis Phase Overview of Design Phase CP2236: Information Systems.
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
Copyright 2008 Tieto Corporation Database merge. Copyright 2008 Tieto Corporation Table of contents Please, do not remove this slide if you want to use.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
Components and Architecture CS 543 – Data Warehousing.
1 Software Testing and Quality Assurance Lecture 30 – Testing Systems.
Ashoka Indonesia Implementation Kick-off August 2014
Data Migration Process
Data Warehouse Components
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
Validata Connectivity (V-Conn)
Module 9: Transferring Data. Overview Introduction to Transferring Data Tools for Importing and Exporting Data in SQL Server Introduction to DTS Transforming.
SQL Server 2005 Integration Services Mike Taulty Developer & Platform Group Microsoft Ltd
ETL By Dr. Gabriel.
Table of Contents Purpose and Prerequisites Data Migration Data Flow
SSIS Over DTS Sagayaraj Putti (139460). 5 September What is DTS?  Data Transformation Services (DTS)  DTS is a set of objects and utilities that.
SQL Server Integration Services (SSIS) Presented by Tarek Ghazali IT Technical Specialist Microsoft SQL Server (MVP) Microsoft Certified Technology Specialist.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
ISV Innovation Presented by ISV Innovation Presented by Business Intelligence Fundamentals: Data Loading Ola Ekdahl IT Mentors 9/12/08.
Antje Rossmanith, Roche 14th German CDISC User Group, 25-Sep-2012
ETL Overview February 24, DS User Group - ETL - February ETL Overview “ETL is the heart and soul of business intelligence (BI).” -- TDWI ETL.
Data Interoperability Basics Bruce Harold & Dale Lutz.
1 Data Warehouses BUAD/American University Data Warehouses.
Data Warehouse Development Methodology
2 Copyright © Oracle Corporation, All rights reserved. Defining Data Warehouse Concepts and Terminology.
Data Management Console Synonym Editor
KFS Data Mapping Leveraging a new KFS 3.0 feature.
Oracle Data Integrator Transformations: Adding More Complexity
ETL Extract Transform Load. Introduction of ETL ETL is used to migrate data from one database to another, to form data marts and data warehouses and also.
DataMAPPER - Applied Database Tech. 이화여대 과학기술대학원 석사 3 학기 992COG08 김지혜.
Prepared By Aakanksha Agrawal & Richa Pandey Mtech CSE 3 rd SEM.
For the Chicago Chapter BOUG Meeting – August 20, 2010
Network design Topic 6 Testing and documentation.
7 Strategies for Extracting, Transforming, and Loading.
Chapter 4 Logical & Physical Database Design
RoOUG Iunie Bucuresti, 26 Iunie Agenda Inregistrarea participantilor ODI – Common Use Cases 2Iunie 2013.
Oracle’s EPM System and Strategy
Class Diagrams. Terms and Concepts A class diagram is a diagram that shows a set of classes, interfaces, and collaborations and their relationships.
Tyler Implementation Kick-Off Aaron Joyal, PMP Financials Project Manager.
Week 1 Lecture 1 Slide 1 CP2028 Visual Basic Programming 2 “The VB Team” Copyright © University of Wolverhampton CP2028 Visual Basic Programming 2 v Week.
Explore engage elevate Data Migration Without Tears Mike Feingold Empoint Ltd Tuesday 10th November 2015.
2 Copyright © 2006, Oracle. All rights reserved. Defining Data Warehouse Concepts and Terminology.
Metadata Driven Clinical Data Integration – Integral to Clinical Analytics April 11, 2016 Kalyan Gopalakrishnan, Priya Shetty Intelent Inc. Sudeep Pattnaik,
ADaM or SDTM? A Comparison of Pooling Strategies for Integrated Analyses in the Age of CDISC Joerg Guettner, Lead Statistical Analyst, Bayer Pharma, Wuppertal,
Dynamics AX Henrik Hasselblad Business Unit Manager.
Slide 1 © 2016, Lera Technologies. All Rights Reserved. Oracle Data Integrator By Lera Technologies.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
11 Copyright © 2009, Oracle. All rights reserved. Enhancing ETL Performance.
Software Testing Training Online. Software testing is ruling the software business in current scenario. It provides an objective, independent view of.
Big Data & Test Automation
Software Testing.
ASIC Design Methodology
How To Apply Quality Management
Universal tool of data validation for support of implementation projects of ERP systems Yuri Byteryakov July 31, 2017.
Data Warehouse Components
LOCO Extract – Transform - Load
Data Warehouse.
Data Migration Assurance
tRelational/DPS Overview
Case Application Development Method
UK Link Technology Refresh
Analysis models and design models
Cutover Strategy (with details becomes Cutover Kickoff) Client
Best Practices in Higher Education Student Data Warehousing Forum
David Gilmore & Richard Blevins Senior Consultants April 17th, 2012
Presentation transcript:

High Level Strategy Dependencies Milestones Roles and Responsibilities Iterative Approach Multiple Legacy / Targets Scope Several different migration methods :- –Logical Blocks (chunking) –Pilot –Big Bang –Catch Up –Post Migration - Parallel Runs Redwood Systems Limited Migration Strategy

Gap Analysis Data Mapping Specifications Identifying differences in functionality between legacy and target systems in terms of data needs. Legacy database schema to interim / target database schema including any transformations needed. Driven by the output of the gap analysis and the data mapping activities above. The specifications produced allow the developers to code the extract, transform and load (ETL) modules, as well as any reconciliation and data cleanse performed during migration. Redwood Systems LimitedAnalysis

Extracts / Loads Migration (transform) Reconciliations Referential File Integrities Transferring data from Legacy and / or Target. Transferring data to interim / target Code to move data from Legacy to Target with transformation Develop tools to migrate data (e.g. DTS) End-to-end comparisons of data content to create the necessary level of business confidence. Code to extract required figures Spreadsheets to report figures Validating quality of migrated data Redwood Systems LimitedDevelopment

Iterative and Incremental Development Data Cuts Freeze These are the execution of the migration process, which may or may not include new cuts of legacy data. Synchronised cuts of data taken from all systems Subsets / selective cuts Parameters Code Redwood Systems LimitedIterations

Analyse Develop Extract/Load Transform Integrity Load IssuesIssues Data Cleanse Eyeball ReconcileReconcile

Reconciliation File Integrities Translation Table Validation Eyeballing UAT Vertical and Horizontal Independently developed Figures at all stages (legacy, interim, target) Referential Integrities Data Constraints Duplicate Data Validate ‘From’ value against legacy parameters and ‘To’ values against target parameters Scenario Testing Regression Testing Spot Testing Comparison of legacy and target applications Independent Team Integration Test Customer Acceptance Testing Redwood Systems Limited Quality Assurance

Identified by Cleansing Strategy Data Mapping Eyeballing Reconciliations File Integrities Legacy - Pre Migration During (not advised as difficult to reconcile) Target - Post Migration (manual or via data fix) Ad Hoc Reporting – Ongoing Redwood Systems Limited Data Cleanse

Implementation Freeze Dress Rehearsal Go Live window (typical migration) Dry Run Shutdown Legacy (and Target) systems Run extracts – Legacy and Target Transfer and load data to migration environment Reconcile Run migration Reconcile and File Integrity Transfer and load to Target Reconcile, Eyeballing and UAT Acceptance Signoff (Go / No Go (instigate contingency plan)) Redwood Systems Limited

Post Implementation Post migration fixes Support Redwood Systems Limited

Source Staging Area TD Schema BA’s - Support, TT’s & Legacy Knowledge Trials & UAT Billing Rec Eye Balling Target Data Overview Data Migration Overview Data Migration/Business Rules (SCOPE) Data Mappings (RULES) Static Data (TARGET PARAMETERS) Translation Tables (LOOK-UP) Redwood Systems Limited