Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,

Slides:



Advertisements
Similar presentations
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ.
Chapter 14 Sound.
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
Update of the ground motion generator of A. Seryi for ATF2 thanks to ground motion measurements in the ATF2 beam line 1 Benoît BOLZONATF2 software task.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
IPBSM status and plan ATF project meeting M.Oroku.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
Taikan SUEHARA, 3 rd ATF2 project KEK, 2006/12/18 Status of Shintake-monitor Optics (focused on phase stabilization) Taikan SUEHARA The University.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
BPM support and beam pipe length FD support status A.Jeremie.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
T. Suehara, H. Yoda, T. Sanuki, Univ. of Tokyo, T. Kume, Y. Honda, T. Tauchi, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off.
How high frequency we care if we need the stabilization of 1nm level?
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Learn: to organize and interpret data in frequency tables to organize and interpret data in frequency tables.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Taikan SUEHARA, ATF2 meeting, KEK, 2006/11/22 Status of fringe stabilization of Shintake-monitor Taikan SUEHARA The University of Tokyo.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Chigasaki Research Institute J-Power / Electric Power Development Co.,Ltd. Ground Motion Measurement in Accelerator Test Facility at KEK ・ KEK ・ ICEPP.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
ATF2 Status Background for the installation planning of Collimator
AS Physics 2.3 Waves 9 Weeks External, 4 Credits.
Alignment and stability session
Summary FD Support System
Seismic motion analysis of the SuperB site of Frascati
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
Topics on Vibration Issues
Laboratories in Annecy working on Vibration Stabilization
ATF2: final doublet support
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
ATF2 IP Tuning Task Simulation Updates
A.Jeremie, B.Bolzon, N.Geffroy
IP configuration session
Waves Characteristics
Seismometer Development for the 1TeV Linear Collider
Presentation transcript:

Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November, 2008

Introduction measured the vibration on the Shintake monitor table and Final Doublet respectively also measured the correlation between Shintake monitor table and Final Doublet compared the measured vibration with the tolerance required from beam size measurement at the IP Shintake monitor table and QF1measurement between Shintake monitor table and QD0

Measured Position on the Shintake Monitor Table Electron Beam We measured vibration on the top the vertical table. The electron beam passes through the center of the table Since the laser interferometer optics is constructed on the whole area of the vertical table, it is not a overestimate. Shintake monitor vertical table

Vibration Sensors ModelCMG-40T86MG-102S ManufacturerGuralp SystemsEndevcoTOKKYO KIKI Sensor TypeVelocimeterAccelerometer Response Frequency0.03 ~ 50 Hz0.01 ~ 100 Hz0.1 ~ 400 Hz Direction3-directionvertical only1-drection each Sensors have wider response frequency but because of the electric noise, measureable frequency range is restricted to 0.2 ~ 100 Hz. We used velocimeters for 0.2 ~ 13 Hz and accelerometer for 13 ~ 100 Hz

Measurement Conditions Window: Hanning Averaging: Linear and 50 averages Overlap: % Frequency Resolution: Hz 1 measurement interval: 1 minute Maximum Frequency: 100 Hz

Measurement on Shintake Monitor Table Transfer function from floor to the Shintake monitor table flat below 10 Hz Peak appears around 50 Hz Coherence between floor and the Shintake monitor table equals to one below 10 Hz decreases above 10 Hz in horizontal directions In vertical, coherence is good up to 60 Hz

Integrated Vibration of the Shintake Monitor Table Integrated vibration of the Shintake monitor table relative to the floor large increase around 50 Hz almost flat below 10 Hz seems to increase below 0.5 Hz but it is due to the low S/N ratio and not the actual motion

Measurement on QD0 Transfer function from floor to QD0 S flat below 10 Hz Peak appears around 20 Hz in horizontal directions Peak appears around 60 Hz in vertical direction Coherence between floor and QD0 equals to one below 10 Hz decreases above 10 Hz in horizontal directions In vertical, coherence is good up to 80 Hz

Integrated Vibration of QD0 Integrated vibration of QD0 relative to the floor Increase around 50 Hz large increase around 20 Hz in horizontal directions almost flat below 10 Hz

Measurements between QD0 and QF1 Phase between QD0 and QF1 equals to zero below 10 Hz Being high above 10 Hz in direction parallel to beam Being high only above 50 Hz in direction perpendicular to beam In vertical, phase is good up to 60 Hz Transfer function from QF1 to QD0 flat below 10 Hz Each peak of QD0 and QF1 around 20 Hz appears in direction parallel to the beam No peaks appear in the vertical direction Peak disappears around 20Hz in direction perpendicular to the beam  QDO and QF1 moves in phase in vertical directions and in direction perpendicular to beam

Transfer Function from Final Doublet to Shintake Monitor Almost same result for QD0 and QF1 Magnitude of transfer function - is flat below 10 Hz in all directions because of good coherence - decreases around 20 Hz in horizontal directions because of the vibration of the Final Doublet - increases above 50 Hz in horizontal directions because of the vibration of the Shintake monitor table

Coherence Between Final Doublet and Shintake Monitor Coherence - equals to one below 10 Hz - decrease above 40 Hz for QD0 in vertical - decrease above 10 Hz for QF1 because of longer distance

Integrated Relative Motion between Final Doublet and Shintake Monitor Almost the same result for QD0 and QF1. Vibration in vertical direction is relatively small. In horizontal two directions, vibrations are the same level. Increase above 50 Hz mainly comes from Shintake monitor Increase around 20 Hz mainly comes from Final Doublet

Tolerance (1) Vertical 37 nm beam size measurement is aimed. Relative motion between Final Doublet and Shintake monitor becomes the measurement error at the beam size measurement. Less than 10 nm stability is needed for QD0. 2 % beam size error corresponds to 7 nm position jitter for QD0 and 20 nm for QF1 according to the ATF2 Proposal.

Tolerance (2) Perpendicular to beam (horizontal) 2.8 μm beam size measurement only sub-micron stability is required

Tolerance (3) Parallel to beam Vibration causes the fluctuation of beam waist position Beam size development along the beam axis can be written as follows, vertical beta function at the IP, is about 100 μm when 37 nm vertical beam size less than several tens of micron stability is needed

Measurement Results and Tolerances ToleranceMeasurement (between QD0) Measurement (between QF1) vertical7 nm (for QD0) 20 nm (for QF1) 4.8 nm6.3 nm perpendicular to beam ~ 500 nm30.7 nm30.6 nm parallel to beam ~ 10,000 nm36.5 nm27.1 nm Vibration condition sufficiently meets the requirement for the beam size measurement in horizontal direction. In vertical the tolerance is the most strict but the stability is proved to satisfy the requirement from the beam size measurement