Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.

Slides:



Advertisements
Similar presentations
CRITF Update ISAS Vegas January 11, Action Items -Work on items that need tag identification under both existing MORC and ORSTF proposal -Define.
Advertisements

NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
NAESB Coordinate Interchange Standard, Version 1 / 0
Operating Reserves --- Again A Discussion Primer
Dynamic Schedule e-tagging Requirements Criterion WECC-087 (formerly INT-008) ISAS Report January 2012.
Primary Objectives of WIT
Dynamic Transfers Bob WECC MIC Meeting “The Last Hurrah!”
Load Responsibility in the NWPP Footprint
WECC BAL-STD-002 Workshop February 6, 2008
OC ORSTF Position WECC Board Meeting December 8, 2006.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Contingency Reserve Standard Drafting Team Presentation before the WECC Board Technical Conference David Lemmons Standard Drafting Team Chair December.
BAL-002-WECC-1 Contingency Reserves
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Presented to the WECC MIC June 15, 2007
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
FERC Order minute Scheduling.
INT Rewrite Projects Presented by Bob Harshbarger January 2012.
Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Reporting GHG Emissions from Power Purchases CPUC/CEC Workshop on Load-Based Reporting Mike McCormick, Policy Director April 13, 2007.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
Chapter 25 Passage of Title and Risk of Loss: Rights of Parties Twomey, Business Law and the Regulatory Environment (14th Ed.)
Loads Acting as a Resource Relationships with QSEs and LSEs
Energy Markets 201 Tribal Solar Working Group April 30, 2015.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
Recallable Tag Discussion Bud Freeman When are they used? What are the implications?
BCTC Customer Consultation on Loss Compensation Service January 15, 2007.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Reserves Issue For years there has been disagreement over reserves issues and what constitutes firm power. We’ve been able to function as a market, despite.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
NAESB WEQ UPDATE Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake, UT August 26, 2015 Bob Harshbarger Puget Sound Energy.
Energy Markets 101 Tribal Solar Working Group March 24, 2015.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Explanation of Latest Changes to Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
WSPP Reserves Issue Educational Webinar February 26, 2008.
Standards Review Subcommittee Update August 17, 2010.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
1 WSPP EC SLIDES FOR AGENDA ITEMS 3 AND 4 WSPP SERVICE SCHEDULE C WSPP Service Schedule C includes a provision allowing interruption “to meet Seller’s.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
WEQ Executive Committee Contract Path Task Force Additional Issues Related To Contract Path Management ( WEQ and WEQ )
Ahmad Ismail.  What is IAS 18 Revenue?  Measurement of revenue  Recognition of revenue  Identification of transaction.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Business Law and the Regulation of Business Chapter 21: Transfer of Title and Risk of Loss By Richard A. Mann & Barry S. Roberts.
Unscheduled Flow Administrative Subcommittee ISAS Report Pete Heiman April 20, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Explanation of Revised Draft Reserves Schedule, Service Schedule D Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
1 A Conversation about MISO Paul Spicer November 8, 2007.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
CMTF Tariff Language Clarification 1. Parking Lot Question Is the Planning Reserve Margin requirement meant to be maintained throughout the whole calendar.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Unscheduled Flow Administrative Subcommittee Report
Pseudo-tie business procedure
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Dynamic Scheduling Overview
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Unscheduled Flow Administrative Subcommittee ISAS Report
Steve Rueckert – Director of Standards
NERC Congestion Management
WIAB WECC Interchange Authority Backup
Pseudo-tie business procedure
Presentation transcript:

Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are scheduled as firm power consistent with the most recent rules adopted by [WECC]. C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are scheduled as firm power consistent with the most recent rules adopted by [WECC]. WECC rules, or at least their interpretations, have changed. WECC rules, or at least their interpretations, have changed. “It is up to Purchasing Selling Entities to determine their level of acceptable deliverability risk and determine who has contingency reserve responsibility.” “It is up to Purchasing Selling Entities to determine their level of acceptable deliverability risk and determine who has contingency reserve responsibility.” Contingency Reserve Responsibility = CRR Contingency Reserve Responsibility = CRR

Reserves Task Force Report Identified 6 possible solutions. Identified 6 possible solutions. Passage of Bal 002 was identified as one that would go a long way toward resolution. Passage of Bal 002 was identified as one that would go a long way toward resolution. Bal 002 passed WECC OC. Bal 002 passed WECC OC. Must be approved by WECC Board, NERC, FERC. Must be approved by WECC Board, NERC, FERC. Effective date: Possibly January 2009 (early), more likely mid Effective date: Possibly January 2009 (early), more likely mid-2009.

What does Bal 002 mean? CRR depends on larger of MSSC or 3% generation plus 3% load. CRR depends on larger of MSSC or 3% generation plus 3% load. Interchange transactions only affect CRR to the extent they affect generation or load. No longer a direct link between WSPP Schedule C interchange transactions and reserves beginning with implementation of Bal 002. Interchange transactions only affect CRR to the extent they affect generation or load. No longer a direct link between WSPP Schedule C interchange transactions and reserves beginning with implementation of Bal 002. RTF recommends leaving existing language of Schedule C alone. RTF recommends leaving existing language of Schedule C alone.

Balancing Authorites A and B both have Contingency Reserve Requirements of 30 MW, which is 3% of net generation and 3% of net load. X 500 MW Gen 500 MW load Y 500 MW Gen 500 MW load (.03 x 500) + (.03 x 500) = 30

Assume there is a sale from BA x to BA y of 100 MW. X 600 MW Gen 500 MW load Y 400 MW Gen 500 MW load 100 MW G-F

Assume there is a sale from BA x to BA y of 100 MW. If BA x increases its generation to supply the sale, its CRR will increase to 33 MW. X 600 MW Gen 500 MW load Y 400 MW Gen 500 MW load (.03 x 600) + (.03 x 500) = MW G-F

Assume there is a sale from BA x to BA y of 100 MW. If BA x increases its generation to supply the sale, its CRR will increase to 33 MW. If BA y reduces its generation because of the import, its CRR will decrease to 27 MW. X 600 MW Gen 500 MW load Y 400 MW Gen 500 MW load (.03 x 600) + (.03 x 500) = 33(.03 x 400) + (.03 x 500) = MW G-F

Assume there is a sale from BA x to BA y of 100 MW. If BA x imports power to supply the sale, its CRR will not change since its generation will not change. X 500 MW Gen 500 MW load Y 400 MW Gen 500 MW load (.03 x 500) + (.03 x 500) = 30(.03 x 400) + (.03 x 500) = MW G-F 100 MW import

Notice that the transaction was tagged as G-F. Notice that the transaction was tagged as G-F. Does not imply “schedule C Firm with reserves” Does not imply “schedule C Firm with reserves” Schedule C defers to WECC, WECC definition of firm power exists in product codes. Schedule C defers to WECC, WECC definition of firm power exists in product codes. More than one product considered “firm.” More than one product considered “firm.”

Energy G-F: Firm Energy G-FC: Firm Contingent. G-FP: Firm Provisional Energy. G-F1: Hourly firm energy. G-F1: Hourly firm energy. G-EX: Exchange of Firm Energy. G-NF: Non-firm energy Reserves C-SP: Capacity for spinning reserve. C-NS: Capacity for non-spinning reserve. C-NS: Capacity for non-spinning reserve. C-RE: Capacity associated with energy recallable for reserves. WECC Product Codes

WECC Definition of Firm Energy G-F: Firm Energy This product may be curtailed only in the event of a reliability condition or to meet Seller’s public utility or statutory obligations for reliability of service to native load. A G-F product cannot be interrupted for economic reasons This product may be curtailed only in the event of a reliability condition or to meet Seller’s public utility or statutory obligations for reliability of service to native load. A G-F product cannot be interrupted for economic reasons.

Energy G-FC: Firm Contingent. Tied to specific unit or source. Interruptible only if source is de-rated or down. Cannot be interrupted for economic reasons. G-FP: Firm Provisional Energy. Buyer and seller determine allowable conditions for interruption. A G-FP product cannot be interrupted for economic reasons. G-F1: Hourly firm energy. Buyer and seller determine allowable conditions for interruption providedthe PSE or LSE receives notification of the interruption at least 40 minutes prior to start of the operating hour. A G- F1 product cannot be interrupted for economic reasons. G-F1: Hourly firm energy. Buyer and seller determine allowable conditions for interruption provided the PSE or LSE receives notification of the interruption at least 40 minutes prior to start of the operating hour. A G- F1 product cannot be interrupted for economic reasons. Brief WECC Explanations

Energy Energy G-EX: Exchange of Firm Energy. An exchange of firm energy where by one entity delivers energy to another entity at one point on the grid and receives an agreed upon amount of energy from that entity at another point on the grid. G-NF: Non-firm energy - This product may be interrupted for any reason or no reason, without liability on the part of either the buyer or seller.

Brief WECC Explanations Reserves C-SP: Capacity for spinning reserve. On-Demand spinning reserve obligation/resource is a spinning reserve product that can be activated through the adjustment of a capacity e-tag. C-NS: Capacity for non-spinning reserve. On-Demand non- spinning reserve obligation/resource is a non-spinning reserve product that can be activated through the adjustment of a capacity e- tag. C-RE: Capacity associated with energy recallable within ten minutes of reserves activation. Source BA can claim it as a reserve resource.

WECC/WSPP Cross Reference WECC Product code Closest WSPP Product Brief description G-FSchedule CFirm Energy G-NFSchedule ANon-firm Energy G-FCSchedule BUnit contingent Energy C-SP Schedule C Spinning Reserves C-NS Schedule C Non-spinning Reserves C-RE Schedule A Recallable Energy

Assume there is an IPP inside BA x that is making a sale to BA y of 50 MW. Depending on the relationship between IPP and BA x, the IPP generation may affect the CRR. X 600 MW Gen 500 MW load Y 350 MW Gen 500 MW load (.03 x 650) + (.03 x 500) = 34.5(.03 x 350) + (.03 x 500) = MW G-F 50 MW G-FC IPP

WECC Product Code G-FC Neither Source nor Sink BA’s Contingency Reserve obligation depends on the type of transaction. Neither Source nor Sink BA’s Contingency Reserve obligation depends on the type of transaction. Seller may or may not call upon own reserve group to cover lost generation for the period of the reserve group response. Seller may or may not call upon own reserve group to cover lost generation for the period of the reserve group response. Seller is not obligated to re-establish the schedule until the unit returns Seller is not obligated to re-establish the schedule until the unit returns

Sale of source specific power A sale of power from a single source is allowable under Schedule C. A sale of power from a single source is allowable under Schedule C. Loss of the source unit does not remove the obligation to provide the power. Loss of the source unit does not remove the obligation to provide the power. It is up to the parties to determine the level of performance risk they are willing to take. It is up to the parties to determine the level of performance risk they are willing to take. Probability of performance may depend on the relationship between the generator and its Balancing Authority or Reserve Sharing Group. Probability of performance may depend on the relationship between the generator and its Balancing Authority or Reserve Sharing Group. Tagging issue associated with FC under WSPP Schedule C. Tagging issue associated with FC under WSPP Schedule C.

Upshot Task Force believes Bal 002 will not require a change to Schedule C language. Task Force believes Bal 002 will not require a change to Schedule C language. Bal 002 provides clarity that energy is uncoupled from reserves. Bal 002 provides clarity that energy is uncoupled from reserves. WECC reserves products can be traded under WSPP Schedule C. WECC reserves products can be traded under WSPP Schedule C. There continues to be concerns over within- hour interruptions, and damages associated with them. There continues to be concerns over within- hour interruptions, and damages associated with them.

Next Steps WECC to revisit eTag 1.8 WECC to revisit eTag 1.8 Reserves Market Reserves Market Educational effort continues Educational effort continues WECC ISAS WECC ISAS NWPP ATF NWPP ATF WSPP Workshop? WSPP Workshop?

Reserves Market (Different Models) Merchants buy and sell capacity used to satisfy reserve criteria under Schedule C, using WECC product codes. Merchants buy and sell capacity used to satisfy reserve criteria under Schedule C, using WECC product codes. WSPP develops ancillary service product approved by FERC. Like other products, market-based rate tariff specifically for ancillary services likely to be required. WSPP develops ancillary service product approved by FERC. Like other products, market-based rate tariff specifically for ancillary services likely to be required. WSPP develops standard language to be included in utilities OATTs. WSPP develops standard language to be included in utilities OATTs.