Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”

Slides:



Advertisements
Similar presentations
College of Engineering and Computer Science Department of Mechanical and Materials Engineering Wright State University Regular Class Aircraft SAE Aero.
Advertisements

SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 Design.
The Fuselage and Empennage
Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
UMaine Aero Design. Proposed Spring Timeline ResearchDesignSolidModelingFabricationFlight Testing/Iteration Week 1 Week 2 2 Weeks Week 3 5 Weeks Week.
AAE 451 Aircraft Design Aerodynamic Preliminary Design Review #2 Team Members Oneeb Bhutta, Matthew Basiletti, Ryan Beech, Mike Van Meter.
Propulsion PDR 1 Team 1 September 21, 2006.
Guidelines Presentation. Aircraft Aim & Judging The aircraft needs to transport the mirror segments of the ESO European Extremely Large Telescope, being.
Group 3 Heavy Lift Cargo Plane William Gerboth, Jonathan Landis, Scott Munro, Harold Pahlck February 18, 2010.
SAE Aero Design Guidelines Rev A, 2013 Aero Design Oral Presentation Guidelines How to Deliver a Presentation The Judges will Notice.
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
Team USYD National Aircraft Design-Build-Fly Competition.
Alex Funiciello Dan Graves Mike Hardbarger Jim Reepmeyer Brian Smaszcz May 14, 2010.
1 Design Group 2 Kat Donovan - Team Leader Andrew DeBerry Mike Kinder John Mack Jeff Newcamp Andrew Prisbell Nick Schumacher Conceptual Design for AME.
Project Presentation Boiler Xpress December 5, 2000 Team Members Oneeb Bhutta Matthew Basiletti Ryan Beech Micheal Van Meter AAE 451 Aircraft Design.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Critical Design Review Team 1.
Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.
Vehicle Sizing PDR Presented by: Mark Blanton Chris Curtis Loren Garrison September 21, 2000 Chris Peters Jeff Rodrian DR2.
The Barn Owls Chris “Mo” Baughman Kate Brennan Christine Izuo Dan Masse Joe “Sal” Salerno Paul Slaboch Michelle Smith.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Structures 1 PDR Team “Canard” October 12th,
Heavy Lift Cargo Plane Group #1 Matthew Chin, Aaron Dickerson Brett J. Ulrich, Tzvee Wood Advisor: Professor Siva Thangam December 9 th, 2004.
SAE Heavy Lift Cargo Plane Advisor: Siva Thangam Group Members: Will Gerboth Jon Landis Scott Munro Harold Pahlck.
Over view Landing Gear Landing Gear Weight Determination Weight Determination Geometric Layout of Wing Structure Geometric Layout of Wing Structure Analysis.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Propulsion QDR 2 Team 1 October 3, 2006.
Team 5 Structures PDR Presented By: Ross May James Roesch Charles Stangle.
Balsa Glider Construction
SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 SAE Aero Design ® East 2005 University of Cincinnati AeroCats Team #039 Design.
Replicating the 1903 Wright Flyer
Team 5 Critical Design Review Trent Lobdell Ross May Maria Mullins Christian Naylor Eamonn Needler Charles Reyzer James Roesch Charles Stangle Nick White.
Team 6: “Soldier Portable UAV” David Neira TJ Worden Matthew Martin Joshua Mellen Ona Okonkwo Josiah Shearon A IR HERCULES 1.
Team “Canard” September 19th, 2006
The Lumberjacks Team /16/12 Brian Martinez.
Group 10 Dimitrios Arnaoutis Alessandro Cuomo Gustavo Krupa Jordan Taligoski David Williams 1.
HALE UAV Preliminary Design AERSP 402B Spring 2014 Team: NSFW Nisherag GandhiThomas Gempp Doug RohrbaughGregory Snyder Steve StanekVictor Thomas SAURON.
BASICS OF RC PLANE. Overview  What is RC Plane?  RC Planes’ Parts and their Role  How planes fly?  Concepts and Terminologies of RC Plane  Stability.
DESIGN OF THE 1903 WRIGHT FLYER REPLICA MADRAS INSTITUE OF TECHNOLOGY CHENNAI - 44.
Ashley Brawner Neelam Datta Xing Huang Jesse Jones
AAE 451 Aircraft Design First Flight Boiler Xpress November 21, 2000
Final Design Team 6 December 2 nd, UAV Team Specializations David Neira – Power & Propulsion Josiah Shearon – Materials Selection & Fabrication.
December 1, 2003PDR1 Team 5 Structures and Weights PDR #2 Scott Bird Mike Downes Kelby Haase Grant Hile Cyrus Sigari Sarah Umberger Jen Watson.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Prototype Fabrication, Economic, & Test Plan.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Structures Preliminary Design Review #1 October 12, 2000.
Dane BatemaBenoit Blier Drew Capps Patricia Roman Kyle Ryan Audrey Serra John TapeeCarlos Vergara Team 1: Propulsion QDR 3 Team 1 October 17, 2006.
Dynamics & Controls PDR 2
Yaqoub Almounes John Cowan Josh Gomez Michael Medulla Mohammad Qasem
Vehicle Sizing AAE 451: Team 2 Michael Caldwell Jeff Haddin
Team 3 Structures and Weights PDR 2
2007 SAE Heavy Lift Cargo Plane
Aircraft Design Process
Team “Canard” September 28th, 2006
Aerospace System Prototyping and Validation- Lecture 2
Structures and Weights
Dynamics & Controls PDR 1
SAE AERO 2017 Joseph Zongolowicz, Kathy Hansen, Nick Montana, Marquis Ward, Frank Dixon, Thomas Houck, Gerald Short, Zhangsiwen Xiao, Kevin Schesventer,
Propulsion QDR 2 Team #3 Presented by: Greg Davidson Etan Karni.
Team 5 Final Design Review
Structures and Weights 1 QDR
Introduction- The Airplane
Project Plan Review Team “Canard” September 14th, 2006 Team 1:
STRUCTURES & WEIGHTS PDR 2
Team 5 Final Design Review
Cargo Airplane Challenge
SAE Aero East 2017 MAE 435 Mid-Term Progress Presentation
Propulsion QDR 2 Team #3 Presented by: Greg Davidson Etan Karni.
Presented by Melissa Doan and Jason Hargraves
Vehicle Sizing PDR Team “Canard” September 14th, 2006 Team 1:
Team “Canard” September 19th, 2006
Structures and Weights 1 QDR
Structures PDR #1 AAE451 – Team 3 October 28, 2003
Dynamics N Controls 1 PDR
Presentation transcript:

Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard” December 7th, 2006

AAE 451 Team 1 2 Overview Aircraft Summary: - Aircraft Properties - Aerodynamic Constants - Propulsion Constants Aircraft Details: - Propulsion - Aerodynamics - Controls - Structures Lessons Learned:

AAE 451 Team 1 3 Aircraft Properties Length (in) 48.2 Wingspan (in) 60.5 Weight (lbf) (w/o payload) 4.4 Weight (lbf) (w/ payload) 5.4

AAE 451 Team 1 4 Aerodynamic Properties Wing Airfoil MH 43 Wing AR 5.87 Wing Area (ft 2 ) 4.33 Horizontal Tail Airfoil NACA 0006 Horizontal Tail AR 4.92 Horizontal Tail Area (ft 2 ) 0.81 Vertical Tail Airfoil NACA 0006 Vertical Tail Area (ft 2 ) 0.31

AAE 451 Team 1 5 Propulsion Constants Propeller Dimensions 11x10 Gear Ratio 4.44 Motor Kv (RPM/Volt) 1700 Motor R (Ohms) Motor I 0 (Amps) 1.9 Battery Nominal Voltage 22.2 V Battery Peak Current 24.0 A

AAE 451 Team 1 6 Propulsion -Improper gearbox dimensions from manufacturer lead to motor stripping gearbox (and extra gearbox) -Backup planetary gearbox provided by Sean; original MEGA motor was modified to fit it -New gearbox caused several aircraft-level changes, chiefly new motor/gearbox mounting scheme -Gearbox issues caused last minute problem solving (and panic) -11x10 propeller used instead of 11x11 (11x11 only available for gas engines) Stripped Gearbox Teeth

AAE 451 Team 1 7 Propulsion on Demonstration Day -Lost power during flight -Reason: Pinion came off motor shaft -Locktite failed -Retested on Tuesday (Dec. 5 th ) – same problem

AAE 451 Team 1 8 Cooling Intake Cooling Outtake Aerodynamics -Aerodynamic design largely unchanged -Small changes to wetted area of some parts -Drag from cooling intake/outtake for propulsion system difficult to predict and ignored

AAE 451 Team 1 9 Dynamics and Controls Vertical Tail Horizontal Tail -D&C remained mostly unchanged -Increased the elevator and flaperon size slightly -Change was made due to experience, and the designed sizes looked small

AAE 451 Team 1 10 Wing Structure Main Carbon Spar Fwd -Wing structure remained unchanged from design except the addition of a carbon spar -Spar was removed after the preliminary concept once calculations showed it wasn’t needed -However, spar gives wing some redundancy and added stiffness without adding too much weight

AAE 451 Team 1 11 Carbon Robs Fwd Front Main Rib Landing Gear Plate Rear Main Rib Internal Fuselage Structure -Design details of the fuselage ribs were done as part of the build process -Fuselage contains 2 main ribs, both with cutouts to allow access to internal components -Ribs also serve as wing attachment points -Carbon rods shifted below chord line to allow flush fit with fuselage -Ribs were balsa/plywood/balsa laminates, but could have been thinner -An aft balsa rib with holes allowed control rods and wires to pass through and be secured

AAE 451 Team 1 12 Replacement Gearbox Aluminum Spacer Mounting Plate Motor Mounting -Originally, there was a rib in the nose that the motor/gearbox mounted to -With the use of a different gearbox, that rib had to be removed -New motor/gearbox assembly mounted to a plywood plate epoxied directly to nose -Access hatch made to access new motor/gearbox assembly -Aluminum spacer needed to position motor pinion correctly Original Mount

AAE 451 Team 1 13 Stiffening Wire Landing Gear 4 Mounting Bolts Intake Vent Main Landing Gear -Plywood plate used as landing gear attachment to carry the brunt of the impact load -Aluminum gear initially were attached by 3 bolts, but aircraft oscillated, so 4 bolts were used to stabilize it -Thin wire added to reduce bending and deflection of the struts

AAE 451 Team 1 14 Tailwheel -Tailwheel solution worked very well -Effective -Simple -Cheap -Low drag

AAE 451 Team 1 15 CG Payload Speed Cntr. Main Batts Receiver Batt Receiver Rate Gyro Component Layout Rate Gyro Rudder Servo Elevator Servo On/Off Switch -Internal components arranged to place CG at the spot selected by the D&C team -CG location gives aircraft a static margin of 17% -Internal component layout closely matched CATIA model -Payload’s CG was positioned very close to empty aircraft’s CG, allowing for payload to be added or removed without excessive rearranging of components

AAE 451 Team 1 16 Lessons Learned -Measure EVERYTHING!! -Had we checked the manufacturer’s shaft length specification, we would have been able to use the original gearbox

AAE 451 Team 1 17 Lessons Learned Wood construction requires LOTS of sanding

AAE 451 Team 1 18 Lessons Learned Not all balsa and plywood are the same, and structural properties change with orientation –This lesson might lead to a lighter aircraft design International makeup of the team had pros and cons –Team members enjoyed learning about other cultures –Three spoken languages made technical communication difficult at times

AAE 451 Team 1 19 Benoit is ALWAYS Right