Low energy ν-beam for EUROSB Marcos Dracos, Nikos Vassilopoulos IPHC Strasbourg, IN2P3/CNRS.

Slides:



Advertisements
Similar presentations
Simulation of Neutrino Factory beam and quasielastic scattering off electrons in the near detector Yordan Karadzhov University of Sofia “St. Kliment Ohridski”
Advertisements

EAR2 simulation update Collaboration board meeting Christina Weiss & Vasilis Vlachoudis.
SBS Hadron and Electron Calorimeters Mark Jones. SBS Hadron and Electron Calorimeters Mark Jones Overview of GEn, GMn setup Overview of GEp setup The.
SBS Hadron and Electron Calorimeters Mark Jones 1 TexPoint fonts used in EMF. Read the TexPoint manual before you delete this box.: AAA A.
NuFact July 2009 Jim Strait, Nikolai Mokhov, Sergei Striganov Fermilab Comparisons between MARS and HARP data* * Title as given by organizers.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
Pion yield studies for proton drive beams of 2-8 GeV kinetic energy for stopped muon and low-energy muon decay experiments Sergei Striganov Fermilab Workshop.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
2015/6/23 1 How to Extrapolate a Neutrino Spectrum to a Far Detector Alfons Weber (Oxford/RAL) NF International Scoping Study, RAL 27 th April 2006.
Harold G. Kirk Brookhaven National Laboratory Meson Production Calculations 1 st Princeton/Oxford High-Power Targets Workshop Oxford May 1-2, 2008.
Operated by Brookhaven Science Associates for the U.S. Department of Energy Optimized Parameters for a Mercury Jet Target X. Ding, D. Cline, UCLA, Los.
Angular Distribution of Gamma-rays from Up-to-date p-p Interactions GLAST Science Lunch Talk Aug 3, 2006 Niklas Karlsson SLAC / KTH
Zhihong Ye Hampton University Feb. 16 th 2010, APS Meeting, Washington DC Data Analysis Strategy to Obtain High Precision Missing Mass Spectra For E
1 A.I.Ryazanov, E.V.Semenov and A.Ferrari DPA calculations in irradiated graphite collimator materials under 7 TeV and 450 GeV proton beams ,
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
A new design for the CERN to Fréjus neutrino beam Marco Zito (IRFU/CEA-Saclay) For the EUROnu WP2 team NUFACT11 Geneva August 2nd 2011.
Meson Productions for Target System with GA/HG Jet and IDS120h Configuration X. Ding (Presenter), D. Cline, UCLA H. Kirk, J.S. Berg, BNL Muon Accelerator.
HYP03 Future Hypernuclear Program at Jlab Hall C Satoshi N. Nakamura Tohoku University 18 th Oct 2003, JLab.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
LAGUNA/LBNO WP4: secondary beam line status report M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito, V. Galymov (CEA),
HARP for MiniBooNE Linda R. Coney Columbia University DPF 2004.
Status of the FAIR pbar Source K. Knie May 3, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
Hadronic Interaction Studies for LHCb Nigel Watson/Birmingham [Thanks to Silvia M., Jeroen v T.]
CERN/BENE meeting, July Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg Who.
Studies on pion/muon capture at MOMENT Nikos Vassilopoulos IHEP, CAS August 11, 2015.
Particle Production of Carbon Target with 20Tto2T5m Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies April 3, /3/14.
HARP measurements of pion yield for neutrino experiments Issei Kato (Kyoto University) for the HARP collaboration Contents: 1.HARP experiment Physics motivations.
Muon absolute flux measurement in anti-neutrino mode A.Ariga 1, C. Pistillo 1, S. Aoki 2 1 University of Bern, 2 Kobe University.
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
Carbon Target Design and Optimization for an Intense Muon Source X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Winter Collaboration.
Kaons in the SPL Superbeam Antoine Cazes Laboratoire de L’accélérateur Linéaire.
MiniBooNE MiniBooNE Motivation LSND Signal Interpreting the LSND Signal MiniBooNE Overview Experimental Setup Neutrino Events in the Detector The Oscillation.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
Comparison HARP data with GEANT4 and MARS Simulations NUFACT06, UC Irvine 28 August 2006 Stephen Brooks 1, Paul Soler 2, Kenny Walaron 2 1 Rutherford Appleton.
Increase of probability of particle capture into the channeling regime Vincenzo Guidi, Andrea Mazzolari, University of Ferrara and INFN - Italy Alberto.
Horns, Hadron production etc. (from hadron production to neutrino beam) A.K.Ichikawa KEK 200/9/26 Study on horns Changing -beam energy Hadron.
From the SPL to the 4-target-horn system: Preliminary design of a beam switching yard WP2: Super Beam 4 th EUROν Annual Meeting, Paris, June 13, 2012 E.
NEAR DETECTOR SPECTRA AND FAR NEAR RATIOS Amit Bashyal August 4, 2015 University of Texas at Arlington 1.
Neutrinos from Stored Muons STORM physics with a μ storage ring.
Quarkonia production with the HERA-B experiment J. Spengler, MPI Heidelberg.
Status of the target and beam line optimization for LAGUNA/LBNO Oxford meeting 2 nd -4 th July 2012 P. Velten, M. Calviani on behalf of the CERN-LAGUNA.
A neo-conventional neutrino beam Moving beyond Simon van der Meer’s paradigm.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Status of the FAIR Antiproton Target K. Knie.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
NuMI Flux, Leonidas Aliaga William & Mary July 25, 2012 Current Uncertainties And Future Plans International Workshop on Neutrino Factories, Super Beams.
K2K and JHF-nu muon monitor Jun Kameda (KEK) 1. K2K muon monitor 2. JHF-ν muon monitor 3. Summary International workshop on Neutrino Beam Instrumentation,
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
Challenges and Progress on the SB Horn Design
IPHC-IN2P3/CNRS Strasbourg
Beam switching yard interfaces
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
Studies on Energy Deposition and Radiation for the 4horn system
Inter-comparison of Particle production (2)
K2K and JHF-nu muon monitor
Target and Horn status report
Solenoid Hadrons Collector
Pure  exposure for e/ separation
Alain Blondel. EUCARD meeting NEU April 2010
PARTICLE FLUX CALCULATION-III

Collector and the SPL Super-Beam Project
Capture and Transmission of polarized positrons from a Compton Scheme
MUMON / emulsion total flux uncertainty
EURO Conclusions from Cracow meeting
Beam dump for J-Parc neutrino facility
Antoine Cazes Université Claude Bernard Lyon-I December 16th, 2008
Presentation transcript:

Low energy ν-beam for EUROSB Marcos Dracos, Nikos Vassilopoulos IPHC Strasbourg, IN2P3/CNRS

ν-storm 26/3/2013 CERN Aim is to use the low energy μ-beam to produce ν s with with = 300 MeV in order to measure their cross section Study a target-horn system optimized for 5 GeV/c focusing (initiated by Sergei’s talk on 18/3/2013 meeting + ν-storm papers) Also look at the GeV/c π + - production-focusing Beam: protons E = 60 GeV, σ x = σ y = 0.1 cm Target: graphite, L = 95 cm, r = 0.3 cm, d = 1.81 gr/cm 2 Horn, Aluminum thickness = 0.3 cm, 5 GeV/c focusing, (horn shape as NIM A 383 (1996) , CNRS Technical Report) MC: FLUKA /latest + Flair interface

Lower ν-energies for ESS & SPL SBs ν-storm 26/3/2013 CERN ν-storm

Low Energy  beam 4 Alan Bross Intensity Frontier Neutrino Subgroup WS - SLAC March 7, 2013 After 3.48m Fe, we have   /pulse in 100 < P(MeV/c) < 300 At end of straight we have a lot of  s, but also a lot of  s with 4.5 < P(GeV/c) < 5.5 Decay pipe

5 GeV/c π + angular distribution at target ν-storm 26/3/2013 CERN 90 % of π 100 mrad Design a horn with 100 mrad acceptance for 5 GeV/c pions

Horn 5 GeV/c, 100 mrad focusing ν-storm 26/3/2013 CERN L = 1.5 m, R neck = 1.5 cm, R out > 10 cm, aluminum thickness = 0.3 cm, 100 mrad 5 GeV λ upstream plate R =10 cm 100 mrad ray 10 mrad ray

ν-storm 26/3/2013 CERN π + yield vs theta with respect to horn’s r < 20cm 0-2 GeV/c 4-6 GeV/c π + yield vs target’s exit Horn II

Results/further thoughts GeV/c r < 20 cm5 ± 0.5 GeV/c r < 20 cm4 - 6 GeV/c ν-storm 26/3/2013 CERN π + per proton at horn’s exit After focusing most of 5 GeV π + have less than 20 mrad angle with respect to the beam-axis while wider angle for 0-2 GeV/C Thanks Could we use the low energy μ-beam modified to our needs for the low ν- energy SBs with = 300 MeV ? Now an idea … Studies are needed…

π + spectra at target exit ν-storm 26/3/2013 CERN